If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0796101810000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.864431,"lon":-119.584305,"icon":""}]} |
Location: 00/10-18-079-10W6/0 | |
Location Alias: 00/10-18-79-10 W6M | |
Location Alias 2: 00/10-18-079-10 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 079 | |
Meridian: 6 | |
Range: 10 | |
Section: 18 | |
County/Municipality: Saddle Hills County | |
Well Name: VELVET HZ GORD 10-18-79-10 | |
Operator Name: Velvet Energy Ltd. | |
License Number: 0488596 | |
License Date: 2018-03-15 | |
License Status: Amended | |
Spud Date: 2018-03-22 | |
Final Drill Date: 2018-03-31 | |
Well Total Depth: 4930.00 m | |
Surface Hole Latitude: 55.864431 | |
Surface Hole Longitude: -119.584305 |
Date | Event |
---|---|
2018-03-15 | Obtained License |
2018-03-23 | Surface Casing Operation Performed |
2018-03-24 | Direction Drilling Operation Performed - Deviate |
2018-03-26 | Direction Drilling Operation Performed - Horizontal |
2018-03-27 | Well Log Performed |
2018-03-31 | Finished Drilling |
2018-03-31 | Well Log Performed |
2018-03-31 | Well Mode changed to Drilled and Cased |
2018-04-01 | Production Casing Operation Performed |
2018-04-02 | Rig Released |
2018-04-09 | Well Log Performed |
2018-05-01 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-05-01 | Perforation Treatment Performed - Open-Hole Completion |
2018-05-01 | Well Began Production |
2018-05-01 | Well Fluid changed to Crude Oil |
2018-05-01 | Well Mode changed to Flowing |
2018-05-02 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-05-03 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-05-04 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-05-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-05-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-05-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2020-02-04 | Well Fluid changed to Crude Oil |
2020-02-04 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2018-03-24 | 677.30 | Deviate (5 - 79 degrees) |
2018-03-26 | 2075.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-05-01 | Open Hole/Barefoot Completion | 4925.50 | 4930.00 | 0 |
2018-05-01 | Multi-Stage Fracture | 4739.30 | 4739.40 | 0 |
2018-05-06 | Multi-Stage Fracture | 2968.30 | 2968.40 | 0 |
2018-05-06 | Multi-Stage Fracture | 2950.00 | 2950.10 | 0 |
2018-05-06 | Multi-Stage Fracture | 2931.70 | 2931.80 | 0 |
2018-05-06 | Multi-Stage Fracture | 2913.40 | 2913.50 | 0 |
2018-05-06 | Multi-Stage Fracture | 2895.10 | 2895.20 | 0 |
2018-05-06 | Multi-Stage Fracture | 2876.80 | 2876.90 | 0 |
2018-05-06 | Multi-Stage Fracture | 2858.50 | 2858.60 | 0 |
2018-05-06 | Multi-Stage Fracture | 2840.20 | 2840.30 | 0 |
2018-05-06 | Multi-Stage Fracture | 2821.90 | 2822.00 | 0 |
2018-05-06 | Multi-Stage Fracture | 2803.60 | 2803.70 | 0 |
2018-05-01 | Multi-Stage Fracture | 4721.00 | 4721.10 | 0 |
2018-05-06 | Multi-Stage Fracture | 2785.30 | 2785.40 | 0 |
2018-05-06 | Multi-Stage Fracture | 2767.00 | 2767.10 | 0 |
2018-05-06 | Multi-Stage Fracture | 2748.70 | 2748.80 | 0 |
2018-05-06 | Multi-Stage Fracture | 2730.40 | 2730.50 | 0 |
2018-05-06 | Multi-Stage Fracture | 2712.10 | 2712.20 | 0 |
2018-05-06 | Multi-Stage Fracture | 2693.70 | 2693.80 | 0 |
2018-05-06 | Multi-Stage Fracture | 2675.40 | 2675.50 | 0 |
2018-05-06 | Multi-Stage Fracture | 2657.10 | 2657.20 | 0 |
2018-05-06 | Multi-Stage Fracture | 2638.80 | 2638.90 | 0 |
2018-05-07 | Multi-Stage Fracture | 2620.50 | 2620.60 | 0 |
2018-05-01 | Multi-Stage Fracture | 4702.70 | 4702.80 | 0 |
2018-05-07 | Multi-Stage Fracture | 2602.20 | 2602.30 | 0 |
2018-05-07 | Multi-Stage Fracture | 2583.90 | 2584.00 | 0 |
2018-05-07 | Multi-Stage Fracture | 2565.80 | 2565.90 | 0 |
2018-05-07 | Multi-Stage Fracture | 2547.40 | 2547.50 | 0 |
2018-05-07 | Multi-Stage Fracture | 2529.10 | 2529.20 | 0 |
2018-05-07 | Multi-Stage Fracture | 2510.80 | 2510.90 | 0 |
2018-05-07 | Multi-Stage Fracture | 2492.50 | 2492.60 | 0 |
2018-05-07 | Multi-Stage Fracture | 2474.20 | 2474.30 | 0 |
2018-05-07 | Multi-Stage Fracture | 2456.00 | 2456.10 | 0 |
2018-05-07 | Multi-Stage Fracture | 2437.70 | 2437.80 | 0 |
2018-05-01 | Multi-Stage Fracture | 4684.40 | 4684.50 | 0 |
2018-05-07 | Multi-Stage Fracture | 2419.30 | 2419.40 | 0 |
2018-05-07 | Multi-Stage Fracture | 2402.10 | 2402.20 | 0 |
2018-05-07 | Multi-Stage Fracture | 2383.80 | 2383.90 | 0 |
2018-05-07 | Multi-Stage Fracture | 2365.50 | 2365.60 | 0 |
2018-05-07 | Multi-Stage Fracture | 2347.20 | 2347.30 | 0 |
2018-05-07 | Multi-Stage Fracture | 2328.90 | 2329.00 | 0 |
2018-05-07 | Multi-Stage Fracture | 2310.50 | 2310.60 | 0 |
2018-05-07 | Multi-Stage Fracture | 2292.20 | 2292.30 | 0 |
2018-05-07 | Multi-Stage Fracture | 2273.90 | 2274.00 | 0 |
2018-05-07 | Multi-Stage Fracture | 2255.60 | 2255.70 | 0 |
2018-05-01 | Multi-Stage Fracture | 4666.10 | 4666.20 | 0 |
2018-05-07 | Multi-Stage Fracture | 2237.30 | 2237.40 | 0 |
2018-05-07 | Multi-Stage Fracture | 2219.00 | 2219.10 | 0 |
2018-05-07 | Multi-Stage Fracture | 2200.70 | 2200.80 | 0 |
2018-05-07 | Multi-Stage Fracture | 2182.30 | 2182.40 | 0 |
2018-05-07 | Multi-Stage Fracture | 2164.00 | 2164.10 | 0 |
2018-05-07 | Multi-Stage Fracture | 2145.60 | 2145.70 | 0 |
2018-05-01 | Multi-Stage Fracture | 4647.80 | 4647.90 | 0 |
2018-05-01 | Multi-Stage Fracture | 4630.70 | 4630.80 | 0 |
2018-05-01 | Multi-Stage Fracture | 4612.40 | 4612.50 | 0 |
2018-05-01 | Multi-Stage Fracture | 4594.10 | 4594.20 | 0 |
2018-05-01 | Multi-Stage Fracture | 4575.80 | 4575.90 | 0 |
2018-05-01 | Multi-Stage Fracture | 4885.70 | 4885.80 | 0 |
2018-05-02 | Multi-Stage Fracture | 4557.50 | 4557.60 | 0 |
2018-05-02 | Multi-Stage Fracture | 4539.20 | 4539.30 | 0 |
2018-05-02 | Multi-Stage Fracture | 4520.90 | 4521.00 | 0 |
2018-05-02 | Multi-Stage Fracture | 4503.70 | 4503.80 | 0 |
2018-05-02 | Multi-Stage Fracture | 4485.30 | 4485.40 | 0 |
2018-05-02 | Multi-Stage Fracture | 4338.90 | 4339.00 | 0 |
2018-05-02 | Multi-Stage Fracture | 4320.60 | 4320.70 | 0 |
2018-05-02 | Multi-Stage Fracture | 4302.30 | 4302.40 | 0 |
2018-05-02 | Multi-Stage Fracture | 4284.00 | 4284.10 | 0 |
2018-05-02 | Multi-Stage Fracture | 4265.70 | 4265.80 | 0 |
2018-05-01 | Multi-Stage Fracture | 4867.40 | 4867.50 | 0 |
2018-05-02 | Multi-Stage Fracture | 4247.40 | 4247.50 | 0 |
2018-05-02 | Multi-Stage Fracture | 4229.10 | 4229.20 | 0 |
2018-05-03 | Multi-Stage Fracture | 4210.80 | 4210.90 | 0 |
2018-05-03 | Multi-Stage Fracture | 4192.50 | 4192.60 | 0 |
2018-05-03 | Multi-Stage Fracture | 4174.20 | 4174.30 | 0 |
2018-05-03 | Multi-Stage Fracture | 4155.90 | 4156.00 | 0 |
2018-05-03 | Multi-Stage Fracture | 4137.60 | 4137.70 | 0 |
2018-05-03 | Multi-Stage Fracture | 4119.20 | 4119.30 | 0 |
2018-05-03 | Multi-Stage Fracture | 4100.90 | 4101.00 | 0 |
2018-05-03 | Multi-Stage Fracture | 4083.50 | 4083.60 | 0 |
2018-05-01 | Multi-Stage Fracture | 4849.10 | 4849.20 | 0 |
2018-05-03 | Multi-Stage Fracture | 4065.10 | 4065.20 | 0 |
2018-05-03 | Multi-Stage Fracture | 4046.80 | 4046.90 | 0 |
2018-05-03 | Multi-Stage Fracture | 4028.50 | 4028.60 | 0 |
2018-05-03 | Multi-Stage Fracture | 4010.20 | 4010.30 | 0 |
2018-05-03 | Multi-Stage Fracture | 3991.90 | 3992.00 | 0 |
2018-05-03 | Multi-Stage Fracture | 3973.60 | 3973.70 | 0 |
2018-05-03 | Multi-Stage Fracture | 3955.30 | 3955.40 | 0 |
2018-05-04 | Multi-Stage Fracture | 3937.00 | 3937.10 | 0 |
2018-05-04 | Multi-Stage Fracture | 3918.70 | 3918.80 | 0 |
2018-05-04 | Multi-Stage Fracture | 3900.40 | 3900.50 | 0 |
2018-05-01 | Multi-Stage Fracture | 4830.80 | 4830.90 | 0 |
2018-05-04 | Multi-Stage Fracture | 3882.10 | 3882.20 | 0 |
2018-05-04 | Multi-Stage Fracture | 3863.80 | 3863.90 | 0 |
2018-05-04 | Multi-Stage Fracture | 3845.50 | 3845.60 | 0 |
2018-05-04 | Multi-Stage Fracture | 3827.20 | 3827.30 | 0 |
2018-05-04 | Multi-Stage Fracture | 3808.90 | 3809.00 | 0 |
2018-05-04 | Multi-Stage Fracture | 3790.60 | 3790.70 | 0 |
2018-05-04 | Multi-Stage Fracture | 3772.30 | 3772.40 | 0 |
2018-05-04 | Multi-Stage Fracture | 3754.00 | 3754.10 | 0 |
2018-05-04 | Multi-Stage Fracture | 3735.70 | 3735.80 | 0 |
2018-05-04 | Multi-Stage Fracture | 3717.40 | 3717.50 | 0 |
2018-05-01 | Multi-Stage Fracture | 4812.50 | 4812.60 | 0 |
2018-05-04 | Multi-Stage Fracture | 3699.20 | 3699.30 | 0 |
2018-05-04 | Multi-Stage Fracture | 3680.90 | 3681.00 | 0 |
2018-05-04 | Multi-Stage Fracture | 3662.60 | 3662.70 | 0 |
2018-05-04 | Multi-Stage Fracture | 3644.30 | 3644.40 | 0 |
2018-05-04 | Multi-Stage Fracture | 3626.00 | 3626.10 | 0 |
2018-05-04 | Multi-Stage Fracture | 3607.70 | 3607.80 | 0 |
2018-05-04 | Multi-Stage Fracture | 3589.50 | 3589.60 | 0 |
2018-05-04 | Multi-Stage Fracture | 3571.40 | 3571.50 | 0 |
2018-05-04 | Multi-Stage Fracture | 3553.30 | 3553.40 | 0 |
2018-05-04 | Multi-Stage Fracture | 3532.50 | 3532.60 | 0 |
2018-05-01 | Multi-Stage Fracture | 4794.20 | 4794.30 | 0 |
2018-05-04 | Multi-Stage Fracture | 3514.20 | 3514.30 | 0 |
2018-05-04 | Multi-Stage Fracture | 3495.50 | 3495.60 | 0 |
2018-05-05 | Multi-Stage Fracture | 3476.90 | 3477.00 | 0 |
2018-05-05 | Multi-Stage Fracture | 3459.20 | 3459.30 | 0 |
2018-05-05 | Multi-Stage Fracture | 3440.90 | 3441.00 | 0 |
2018-05-05 | Multi-Stage Fracture | 3422.60 | 3422.70 | 0 |
2018-05-05 | Multi-Stage Fracture | 3404.20 | 3404.30 | 0 |
2018-05-05 | Multi-Stage Fracture | 3386.30 | 3386.40 | 0 |
2018-05-05 | Multi-Stage Fracture | 3368.20 | 3368.30 | 0 |
2018-05-05 | Multi-Stage Fracture | 3350.40 | 3350.50 | 0 |
2018-05-01 | Multi-Stage Fracture | 4775.90 | 4776.00 | 0 |
2018-05-05 | Multi-Stage Fracture | 3332.10 | 3332.20 | 0 |
2018-05-05 | Multi-Stage Fracture | 3313.80 | 3313.90 | 0 |
2018-05-05 | Multi-Stage Fracture | 3295.50 | 3295.60 | 0 |
2018-05-05 | Multi-Stage Fracture | 3277.10 | 3277.20 | 0 |
2018-05-05 | Multi-Stage Fracture | 3258.80 | 3258.90 | 0 |
2018-05-05 | Multi-Stage Fracture | 3240.50 | 3240.60 | 0 |
2018-05-05 | Multi-Stage Fracture | 3222.20 | 3222.30 | 0 |
2018-05-05 | Multi-Stage Fracture | 3203.90 | 3204.00 | 0 |
2018-05-05 | Multi-Stage Fracture | 3186.80 | 3186.90 | 0 |
2018-05-05 | Multi-Stage Fracture | 3168.50 | 3168.60 | 0 |
2018-05-01 | Multi-Stage Fracture | 4757.60 | 4757.70 | 0 |
2018-05-05 | Multi-Stage Fracture | 3150.20 | 3150.30 | 0 |
2018-05-05 | Multi-Stage Fracture | 3131.90 | 3132.00 | 0 |
2018-05-05 | Multi-Stage Fracture | 3113.60 | 3113.70 | 0 |
2018-05-05 | Multi-Stage Fracture | 3095.20 | 3095.30 | 0 |
2018-05-06 | Multi-Stage Fracture | 3076.90 | 3077.00 | 0 |
2018-05-06 | Multi-Stage Fracture | 3059.90 | 3060.00 | 0 |
2018-05-06 | Multi-Stage Fracture | 3041.60 | 3041.70 | 0 |
2018-05-06 | Multi-Stage Fracture | 3023.30 | 3023.40 | 0 |
2018-05-06 | Multi-Stage Fracture | 3005.00 | 3005.10 | 0 |
2018-05-06 | Multi-Stage Fracture | 2986.70 | 2986.80 | 0 |
For data sources see[5]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-05-01 | 2018-05-07 | 2,008 | 30,856 | N/A |
2 | 2018-05-01 | 2018-05-04 | 2,008 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 80.8208 | N/A | |||
40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 18.7058 | N/A | ||
15% HCl | Calfrac | Acid | Hydrochloric acid | 7647-01-0 | 100 | 0.3816 | N/A | |
Water | 7732-18-5 | 100 | 0.3816 | N/A | ||||
SaniFrac 8844 | Calfrac | Bactericide/Biocide | Acetamide. 2.2-dibromo-2-cyano | 10222-01-2 | 100 | 0.0103 | N/A | |
Acetonitrile. 2.2-dibromo | 3252-43-5 | 100 | 0.0103 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0103 | N/A | ||||
Polyethylene glycol | 25322-68-3 | 100 | 0.0103 | N/A | ||||
Sodium bromide | 7647-15-6 | 100 | 0.0103 | N/A | ||||
CI-9100G | Calfrac | Corrosion Inhibitor | Alcohols. C12-15. ethoxylated | 68131-39-5 | 100 | 0.0012 | N/A | |
Cinnamaldehyde | 104-55-2 | 100 | 0.0012 | N/A | ||||
Dipropylene glycol monomethyl ether | 34590-94-8 | 100 | 0.0012 | N/A | ||||
Ethylene Glycol | 107-21-1 | 100 | 0.0012 | N/A | ||||
Formic acid | 64-18-6 | 100 | 0.0012 | N/A | ||||
Isopropyl alcohol | 67-63-0 | 100 | 0.0012 | N/A | ||||
Tar bases. quinoline derivs. | 68513-87-1 | 100 | 0.0012 | N/A | ||||
Tar bases. quinolone derivs.. benzyl chloride-quarternized | 72480-70-7 | 100 | 0.0012 | N/A | ||||
DWP-641 | Calfrac | Friction Reducer | Ammonium chloride | 12125-02-9 | 100 | 0.0742 | N/A | |
Distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0742 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0742 | N/A | ||||
2 | DHP-991 | Calfrac Well Services | Solvent | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0139 | N/A |
Sorbitan trioleate | 26266-58-0 | 100 | 0.0139 | N/A |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 2780 | 0.0 | 0.0 | 0.0 |
2019 | 8622 | 0.0 | 0.0 | 0.0 |
2020 | 1619 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-04-04 | No Incident Encountered | 0.00 | 0.00 |
2018-05-07 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]