X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796101810000

Well Details

Well ID: 0796101810000
Loading map...
Location: 00/10-18-079-10W6/0
Location Alias: 00/10-18-79-10 W6M
Location Alias 2: 00/10-18-079-10 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 10
Section: 18
County/Municipality: Saddle Hills County
Well Name: VELVET HZ GORD 10-18-79-10
Operator Name: Velvet Energy Ltd.
License Number: 0488596
License Date: 2018-03-15
License Status: Amended
Spud Date: 2018-03-22
Final Drill Date: 2018-03-31
Well Total Depth: 4930.00 m
Surface Hole Latitude: 55.864431
Surface Hole Longitude: -119.584305

For data sources see[1][2]

Well History

Date Event
2018-03-15 Obtained License
2018-03-23 Surface Casing Operation Performed
2018-03-24 Direction Drilling Operation Performed - Deviate
2018-03-26 Direction Drilling Operation Performed - Horizontal
2018-03-27 Well Log Performed
2018-03-31 Finished Drilling
2018-03-31 Well Log Performed
2018-03-31 Well Mode changed to Drilled and Cased
2018-04-01 Production Casing Operation Performed
2018-04-02 Rig Released
2018-04-09 Well Log Performed
2018-05-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-01 Perforation Treatment Performed - Open-Hole Completion
2018-05-01 Well Began Production
2018-05-01 Well Fluid changed to Crude Oil
2018-05-01 Well Mode changed to Flowing
2018-05-02 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-03 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-04 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-05 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-06 Perforation Treatment Performed - Multi-Stage Fracture
2018-05-07 Perforation Treatment Performed - Multi-Stage Fracture
2020-02-04 Well Fluid changed to Crude Oil
2020-02-04 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-03-24 677.30 Deviate (5 - 79 degrees)
2018-03-26 2075.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-05-01 Open Hole/Barefoot Completion 4925.50 4930.00 0
2018-05-01 Multi-Stage Fracture 4739.30 4739.40 0
2018-05-06 Multi-Stage Fracture 2968.30 2968.40 0
2018-05-06 Multi-Stage Fracture 2950.00 2950.10 0
2018-05-06 Multi-Stage Fracture 2931.70 2931.80 0
2018-05-06 Multi-Stage Fracture 2913.40 2913.50 0
2018-05-06 Multi-Stage Fracture 2895.10 2895.20 0
2018-05-06 Multi-Stage Fracture 2876.80 2876.90 0
2018-05-06 Multi-Stage Fracture 2858.50 2858.60 0
2018-05-06 Multi-Stage Fracture 2840.20 2840.30 0
2018-05-06 Multi-Stage Fracture 2821.90 2822.00 0
2018-05-06 Multi-Stage Fracture 2803.60 2803.70 0
2018-05-01 Multi-Stage Fracture 4721.00 4721.10 0
2018-05-06 Multi-Stage Fracture 2785.30 2785.40 0
2018-05-06 Multi-Stage Fracture 2767.00 2767.10 0
2018-05-06 Multi-Stage Fracture 2748.70 2748.80 0
2018-05-06 Multi-Stage Fracture 2730.40 2730.50 0
2018-05-06 Multi-Stage Fracture 2712.10 2712.20 0
2018-05-06 Multi-Stage Fracture 2693.70 2693.80 0
2018-05-06 Multi-Stage Fracture 2675.40 2675.50 0
2018-05-06 Multi-Stage Fracture 2657.10 2657.20 0
2018-05-06 Multi-Stage Fracture 2638.80 2638.90 0
2018-05-07 Multi-Stage Fracture 2620.50 2620.60 0
2018-05-01 Multi-Stage Fracture 4702.70 4702.80 0
2018-05-07 Multi-Stage Fracture 2602.20 2602.30 0
2018-05-07 Multi-Stage Fracture 2583.90 2584.00 0
2018-05-07 Multi-Stage Fracture 2565.80 2565.90 0
2018-05-07 Multi-Stage Fracture 2547.40 2547.50 0
2018-05-07 Multi-Stage Fracture 2529.10 2529.20 0
2018-05-07 Multi-Stage Fracture 2510.80 2510.90 0
2018-05-07 Multi-Stage Fracture 2492.50 2492.60 0
2018-05-07 Multi-Stage Fracture 2474.20 2474.30 0
2018-05-07 Multi-Stage Fracture 2456.00 2456.10 0
2018-05-07 Multi-Stage Fracture 2437.70 2437.80 0
2018-05-01 Multi-Stage Fracture 4684.40 4684.50 0
2018-05-07 Multi-Stage Fracture 2419.30 2419.40 0
2018-05-07 Multi-Stage Fracture 2402.10 2402.20 0
2018-05-07 Multi-Stage Fracture 2383.80 2383.90 0
2018-05-07 Multi-Stage Fracture 2365.50 2365.60 0
2018-05-07 Multi-Stage Fracture 2347.20 2347.30 0
2018-05-07 Multi-Stage Fracture 2328.90 2329.00 0
2018-05-07 Multi-Stage Fracture 2310.50 2310.60 0
2018-05-07 Multi-Stage Fracture 2292.20 2292.30 0
2018-05-07 Multi-Stage Fracture 2273.90 2274.00 0
2018-05-07 Multi-Stage Fracture 2255.60 2255.70 0
2018-05-01 Multi-Stage Fracture 4666.10 4666.20 0
2018-05-07 Multi-Stage Fracture 2237.30 2237.40 0
2018-05-07 Multi-Stage Fracture 2219.00 2219.10 0
2018-05-07 Multi-Stage Fracture 2200.70 2200.80 0
2018-05-07 Multi-Stage Fracture 2182.30 2182.40 0
2018-05-07 Multi-Stage Fracture 2164.00 2164.10 0
2018-05-07 Multi-Stage Fracture 2145.60 2145.70 0
2018-05-01 Multi-Stage Fracture 4647.80 4647.90 0
2018-05-01 Multi-Stage Fracture 4630.70 4630.80 0
2018-05-01 Multi-Stage Fracture 4612.40 4612.50 0
2018-05-01 Multi-Stage Fracture 4594.10 4594.20 0
2018-05-01 Multi-Stage Fracture 4575.80 4575.90 0
2018-05-01 Multi-Stage Fracture 4885.70 4885.80 0
2018-05-02 Multi-Stage Fracture 4557.50 4557.60 0
2018-05-02 Multi-Stage Fracture 4539.20 4539.30 0
2018-05-02 Multi-Stage Fracture 4520.90 4521.00 0
2018-05-02 Multi-Stage Fracture 4503.70 4503.80 0
2018-05-02 Multi-Stage Fracture 4485.30 4485.40 0
2018-05-02 Multi-Stage Fracture 4338.90 4339.00 0
2018-05-02 Multi-Stage Fracture 4320.60 4320.70 0
2018-05-02 Multi-Stage Fracture 4302.30 4302.40 0
2018-05-02 Multi-Stage Fracture 4284.00 4284.10 0
2018-05-02 Multi-Stage Fracture 4265.70 4265.80 0
2018-05-01 Multi-Stage Fracture 4867.40 4867.50 0
2018-05-02 Multi-Stage Fracture 4247.40 4247.50 0
2018-05-02 Multi-Stage Fracture 4229.10 4229.20 0
2018-05-03 Multi-Stage Fracture 4210.80 4210.90 0
2018-05-03 Multi-Stage Fracture 4192.50 4192.60 0
2018-05-03 Multi-Stage Fracture 4174.20 4174.30 0
2018-05-03 Multi-Stage Fracture 4155.90 4156.00 0
2018-05-03 Multi-Stage Fracture 4137.60 4137.70 0
2018-05-03 Multi-Stage Fracture 4119.20 4119.30 0
2018-05-03 Multi-Stage Fracture 4100.90 4101.00 0
2018-05-03 Multi-Stage Fracture 4083.50 4083.60 0
2018-05-01 Multi-Stage Fracture 4849.10 4849.20 0
2018-05-03 Multi-Stage Fracture 4065.10 4065.20 0
2018-05-03 Multi-Stage Fracture 4046.80 4046.90 0
2018-05-03 Multi-Stage Fracture 4028.50 4028.60 0
2018-05-03 Multi-Stage Fracture 4010.20 4010.30 0
2018-05-03 Multi-Stage Fracture 3991.90 3992.00 0
2018-05-03 Multi-Stage Fracture 3973.60 3973.70 0
2018-05-03 Multi-Stage Fracture 3955.30 3955.40 0
2018-05-04 Multi-Stage Fracture 3937.00 3937.10 0
2018-05-04 Multi-Stage Fracture 3918.70 3918.80 0
2018-05-04 Multi-Stage Fracture 3900.40 3900.50 0
2018-05-01 Multi-Stage Fracture 4830.80 4830.90 0
2018-05-04 Multi-Stage Fracture 3882.10 3882.20 0
2018-05-04 Multi-Stage Fracture 3863.80 3863.90 0
2018-05-04 Multi-Stage Fracture 3845.50 3845.60 0
2018-05-04 Multi-Stage Fracture 3827.20 3827.30 0
2018-05-04 Multi-Stage Fracture 3808.90 3809.00 0
2018-05-04 Multi-Stage Fracture 3790.60 3790.70 0
2018-05-04 Multi-Stage Fracture 3772.30 3772.40 0
2018-05-04 Multi-Stage Fracture 3754.00 3754.10 0
2018-05-04 Multi-Stage Fracture 3735.70 3735.80 0
2018-05-04 Multi-Stage Fracture 3717.40 3717.50 0
2018-05-01 Multi-Stage Fracture 4812.50 4812.60 0
2018-05-04 Multi-Stage Fracture 3699.20 3699.30 0
2018-05-04 Multi-Stage Fracture 3680.90 3681.00 0
2018-05-04 Multi-Stage Fracture 3662.60 3662.70 0
2018-05-04 Multi-Stage Fracture 3644.30 3644.40 0
2018-05-04 Multi-Stage Fracture 3626.00 3626.10 0
2018-05-04 Multi-Stage Fracture 3607.70 3607.80 0
2018-05-04 Multi-Stage Fracture 3589.50 3589.60 0
2018-05-04 Multi-Stage Fracture 3571.40 3571.50 0
2018-05-04 Multi-Stage Fracture 3553.30 3553.40 0
2018-05-04 Multi-Stage Fracture 3532.50 3532.60 0
2018-05-01 Multi-Stage Fracture 4794.20 4794.30 0
2018-05-04 Multi-Stage Fracture 3514.20 3514.30 0
2018-05-04 Multi-Stage Fracture 3495.50 3495.60 0
2018-05-05 Multi-Stage Fracture 3476.90 3477.00 0
2018-05-05 Multi-Stage Fracture 3459.20 3459.30 0
2018-05-05 Multi-Stage Fracture 3440.90 3441.00 0
2018-05-05 Multi-Stage Fracture 3422.60 3422.70 0
2018-05-05 Multi-Stage Fracture 3404.20 3404.30 0
2018-05-05 Multi-Stage Fracture 3386.30 3386.40 0
2018-05-05 Multi-Stage Fracture 3368.20 3368.30 0
2018-05-05 Multi-Stage Fracture 3350.40 3350.50 0
2018-05-01 Multi-Stage Fracture 4775.90 4776.00 0
2018-05-05 Multi-Stage Fracture 3332.10 3332.20 0
2018-05-05 Multi-Stage Fracture 3313.80 3313.90 0
2018-05-05 Multi-Stage Fracture 3295.50 3295.60 0
2018-05-05 Multi-Stage Fracture 3277.10 3277.20 0
2018-05-05 Multi-Stage Fracture 3258.80 3258.90 0
2018-05-05 Multi-Stage Fracture 3240.50 3240.60 0
2018-05-05 Multi-Stage Fracture 3222.20 3222.30 0
2018-05-05 Multi-Stage Fracture 3203.90 3204.00 0
2018-05-05 Multi-Stage Fracture 3186.80 3186.90 0
2018-05-05 Multi-Stage Fracture 3168.50 3168.60 0
2018-05-01 Multi-Stage Fracture 4757.60 4757.70 0
2018-05-05 Multi-Stage Fracture 3150.20 3150.30 0
2018-05-05 Multi-Stage Fracture 3131.90 3132.00 0
2018-05-05 Multi-Stage Fracture 3113.60 3113.70 0
2018-05-05 Multi-Stage Fracture 3095.20 3095.30 0
2018-05-06 Multi-Stage Fracture 3076.90 3077.00 0
2018-05-06 Multi-Stage Fracture 3059.90 3060.00 0
2018-05-06 Multi-Stage Fracture 3041.60 3041.70 0
2018-05-06 Multi-Stage Fracture 3023.30 3023.40 0
2018-05-06 Multi-Stage Fracture 3005.00 3005.10 0
2018-05-06 Multi-Stage Fracture 2986.70 2986.80 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-05-01 2018-05-07 2,008 30,856 N/A
2 2018-05-01 2018-05-04 2,008 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 80.8208 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 18.7058 N/A
15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 0.3816 N/A
Water 7732-18-5 100 0.3816 N/A
SaniFrac 8844 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0103 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0103 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0103 N/A
Polyethylene glycol 25322-68-3 100 0.0103 N/A
Sodium bromide 7647-15-6 100 0.0103 N/A
CI-9100G Calfrac Corrosion Inhibitor Alcohols. C12-15. ethoxylated 68131-39-5 100 0.0012 N/A
Cinnamaldehyde 104-55-2 100 0.0012 N/A
Dipropylene glycol monomethyl ether 34590-94-8 100 0.0012 N/A
Ethylene Glycol 107-21-1 100 0.0012 N/A
Formic acid 64-18-6 100 0.0012 N/A
Isopropyl alcohol 67-63-0 100 0.0012 N/A
Tar bases. quinoline derivs. 68513-87-1 100 0.0012 N/A
Tar bases. quinolone derivs.. benzyl chloride-quarternized 72480-70-7 100 0.0012 N/A
DWP-641 Calfrac Friction Reducer Ammonium chloride 12125-02-9 100 0.0742 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0742 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0742 N/A
2 DHP-991 Calfrac Well Services Solvent Non-Hazardous Ingredients Trade Secret 100 0.0139 N/A
Sorbitan trioleate 26266-58-0 100 0.0139 N/A

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 2780 0.0 0.0 0.0
2019 8622 0.0 0.0 0.0
2020 1619 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-04-04 No Incident Encountered 0.00 0.00
2018-05-07 No Incident Encountered 0.00 0.00

For data sources see[8]

References