X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796100506000

Well Details

Well ID: 0796100506000
Loading map...
Location: 00/06-05-079-10W6/0
Location Alias: 00/06-05-79-10 W6M
Location Alias 2: 00/06-05-079-10 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 10
Section: 05
County/Municipality: Saddle Hills County
Well Name: BIR GORD 6-5-79-10
Operator Name: Birchcliff Energy Ltd.
License Number: 0130217
License Date: 1987-11-20
License Status: Suspension
Spud Date: 1987-12-18
Final Drill Date: 1988-01-23
Well Total Depth: 2430.00 m
Surface Hole Latitude: 55.817193
Surface Hole Longitude: -119.530221

For data sources see[1][2]

Well History

Date Event
1987-11-20 Obtained License
1987-12-20 Well Log Performed
1987-12-21 Drill Stem Test Performed
1987-12-21 Surface Casing Operation Performed
1988-01-23 Finished Drilling
1988-01-23 Well Log Performed
1988-01-24 Well Log Performed
1988-01-27 Drill Stem Test Performed
1988-01-29 Production Casing Operation Performed
1988-01-30 Rig Released
1988-07-29 Drill Stem Test Performed
1988-07-29 Well Log Performed
1988-07-30 Well Log Performed
1988-07-31 Perforation Treatment Performed - Jet Perforation
1988-08-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-08-02 Plug Back Performed
1988-08-02 Well Log Performed
1988-08-04 Perforation Treatment Performed - Jet Perforation
1988-08-11 Well Log Performed
1988-08-11 Well Mode changed to Drilled and Cased
1988-08-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-08-12 Plug Back Performed
1994-03-04 Well Log Performed
1994-03-05 Well Log Performed
1994-03-06 Perforation Treatment Performed - Jet Perforation
1995-01-08 Well Began Production
1995-01-08 Well Fluid changed to Gas
1995-01-08 Well Mode changed to Flowing
2011-02-01 Well Fluid changed to Gas
2011-02-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-07-31 Perforation 2282.50 2292.50 14
1988-08-02 Packing Device Capped w/Cement 2257.00 2265.00 0
1988-08-04 Perforation 1743.50 1745.50 14
1988-08-12 Packing Device Capped w/Cement 1730.00 1738.00 0
1994-03-06 Perforation 1409.00 1415.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 8017 0.0 0.0 0.0
1996 7719 0.0 0.0 0.0
1997 7300 0.0 0.0 0.0
1998 8241 0.0 0.0 0.0
1999 8561 0.0 0.0 0.0
2000 8002 0.0 0.0 0.0
2001 8354 0.0 0.0 0.0
2002 8759 0.0 0.0 0.0
2003 8708 0.0 0.0 0.0
2004 7199 0.0 0.0 0.0
2005 8130 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8665 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8231 0.0 0.0 0.0

For data sources see[5]

References