X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796100107000

Well Details

Well ID: 0796100107000
Loading map...
Location: 00/07-01-079-10W6/0
Location Alias: 00/07-01-79-10 W6M
Location Alias 2: 00/07-01-079-10 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 10
Section: 01
County/Municipality: Saddle Hills County
Well Name: SLE PROGRESS 7-1-79-10
Operator Name: SanLing Energy Ltd.
License Number: 0322478
License Date: 2004-12-21
License Status: Suspension
Spud Date: 2005-01-04
Final Drill Date: 2005-01-11
Well Total Depth: 1860.00 m
Surface Hole Latitude: 55.816660
Surface Hole Longitude: -119.417310

For data sources see[1][2]

Well History

Date Event
2004-12-21 Obtained License
2005-01-02 Well Log Performed
2005-01-05 Surface Casing Operation Performed
2005-01-11 Finished Drilling
2005-01-11 Well Mode changed to Drilled and Cased
2005-01-12 Well Log Performed
2005-01-14 Production Casing Operation Performed
2005-01-15 Rig Released
2005-02-02 Well Log Performed
2005-02-18 Perforation Treatment Performed - Jet Perforation
2005-02-18 Well Log Performed
2005-02-19 Perforation Treatment Performed - Fractured
2005-11-16 Well Began Production
2005-11-16 Well Fluid changed to Gas
2005-11-16 Well Mode changed to Flowing
2014-02-14 Well Log Performed
2014-02-15 Well Log Performed
2014-02-16 Well Log Performed
2015-02-15 Well Log Performed
2015-02-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-02-16 Plug Back Performed
2015-02-16 Well Fluid changed to Gas
2015-02-16 Well Mode changed to Abandoned Zone
2015-02-18 Perforation Treatment Performed - Jet Perforation
2015-02-18 Well Log Performed
2015-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-02-25 Plug Back Performed
2015-02-25 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-02-18 Perforation 1802.00 1808.00 17
2005-02-19 Fracture 1802.00 1808.00 0
2015-02-16 Packing Device Capped w/Cement 1786.00 1794.00 0
2015-02-18 Perforation 354.00 356.00 20
2015-02-18 Perforation 355.00 357.00 20
2015-02-25 Packing Device Capped w/Cement 343.00 351.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2005 960 0.0 0.0 0.0
2006 1416 0.0 0.0 0.0
2009 3531 0.0 0.0 0.0
2010 6912 0.0 0.0 0.0
2011 5184 0.0 0.0 0.0
2012 624 0.0 0.0 0.0
2014 24 0.0 0.0 0.0
2015 48 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-02-11 No Incident Encountered 0.00 0.00

For data sources see[6]

References