If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0796090311000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.821045,"lon":-119.324324,"icon":""}]} |
Location: 00/11-03-079-09W6/0 | |
Location Alias: 00/11-03-79-09 W6M | |
Location Alias 2: 00/11-03-079-09 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 079 | |
Meridian: 6 | |
Range: 09 | |
Section: 03 | |
County/Municipality: Saddle Hills County | |
Well Name: ENCOR PROGRESS 11-3-79-9 | |
Operator Name: Repsol Oil & Gas Canada Inc. | |
License Number: 0132332 | |
License Date: 1988-02-17 | |
License Status: RecCertified | |
Spud Date: 1988-02-19 | |
Final Drill Date: 1988-03-03 | |
Well Total Depth: 1720.00 m | |
Surface Hole Latitude: 55.821045 | |
Surface Hole Longitude: -119.324324 |
Date | Event |
---|---|
1988-02-17 | Obtained License |
1988-02-20 | Surface Casing Operation Performed |
1988-03-03 | Finished Drilling |
1988-03-03 | Well Log Performed |
1988-03-04 | Well Log Performed |
1988-03-05 | Drill Stem Test Performed |
1988-03-06 | Drill Stem Test Performed |
1988-03-07 | Drill Stem Test Performed |
1988-03-09 | Production Casing Operation Performed |
1988-03-09 | Rig Released |
1988-03-09 | Well Mode changed to Drilled and Cased |
1988-07-29 | Well Log Performed |
1988-07-31 | Perforation Treatment Performed - Jet Perforation |
1988-07-31 | Well Log Performed |
1988-08-01 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-08-04 | Perforation Treatment Performed - Fractured |
1988-08-10 | Well Log Performed |
1993-03-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1993-03-01 | Plug Back Performed |
1993-03-01 | Well Log Performed |
1993-03-01 | Well Mode changed to Abandoned |
1993-03-02 | Well Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1988-07-31 | Perforation | 1578.50 | 1580.50 | 13 |
1988-07-31 | Perforation | 1582.50 | 1585.00 | 13 |
1988-07-31 | Perforation | 1587.00 | 1588.00 | 13 |
1988-08-01 | Acid Treatment | 1578.50 | 1588.00 | 0 |
1988-08-04 | Fracture | 1578.50 | 1588.00 | 0 |
1993-03-01 | Packing Device Capped w/Cement | 1567.00 | 1575.00 | 0 |
For data sources see[4]