X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796071711000

Well Details

Well ID: 0796071711000
Loading map...
Location: 00/11-17-079-07W6/0
Location Alias: 00/11-17-79-07 W6M
Location Alias 2: 00/11-17-079-07 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 07
Section: 17
County/Municipality: Saddle Hills County
Well Name: R S R MIRAGE 11-17-79-7
Operator Name: Rising Star Resources Ltd.
License Number: 0212516
License Date: 1998-01-23
License Status: Suspension
Spud Date: 1998-02-23
Final Drill Date: 1998-03-03
Well Total Depth: 1429.00 m
Surface Hole Latitude: 55.849793
Surface Hole Longitude: -119.058752

For data sources see[1][2]

Well History

Date Event
1998-01-23 Obtained License
1998-02-24 Surface Casing Operation Performed
1998-03-03 Finished Drilling
1998-03-03 Well Log Performed
1998-03-03 Well Mode changed to Drilled and Cased
1998-03-05 Production Casing Operation Performed
1998-03-05 Rig Released
1998-05-13 Perforation Treatment Performed - Jet Perforation
1998-05-13 Well Log Performed
1998-05-15 Perforation Treatment Performed - Fractured
1998-05-28 Well Began Production
1998-05-28 Well Fluid changed to Crude Oil
1998-05-28 Well Mode changed to Flowing
2002-09-05 Well Fluid changed to Crude Oil
2002-09-05 Well Mode changed to Pumping
2014-06-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-06-18 Perforation Treatment Performed - Jet Perforation
2014-06-18 Plug Back Performed
2014-06-18 Well Fluid changed to Crude Oil
2014-06-18 Well Log Performed
2014-06-18 Well Mode changed to Abandoned Zone
2014-06-19 Well Log Performed
2014-06-21 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1998-05-13 Perforation 1381.00 1384.00 17
1998-05-13 Perforation 1385.00 1388.50 17
1998-05-15 Fracture 1381.00 1388.50 0
2014-06-18 Packing Device Capped w/Cement 1362.00 1370.00 0
2014-06-18 Perforation 1328.00 1330.00 17
2014-06-21 Acid Treatment 1328.00 1330.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 4912 0.0 0.0 0.0
1999 8344 0.0 0.0 0.0
2000 8745 0.0 0.0 0.0
2001 8271 0.0 0.0 0.0
2002 8692 0.0 0.0 0.0
2003 8327 0.0 0.0 0.0
2004 8646 0.0 0.0 0.0
2005 6681 0.0 0.0 0.0
2006 7008 0.0 0.0 0.0
2007 8469 0.0 0.0 0.0
2008 8141 0.0 0.0 0.0
2009 8338 0.0 0.0 0.0
2010 8461 0.0 0.0 0.0
2011 4902 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1998-05-21 No Incident Encountered 0.00 0.00
2014-06-23 No Incident Encountered 0.00 0.00

For data sources see[6]

References