X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796071009000

Well Details

Well ID: 0796071009000
Loading map...
Location: 00/09-10-079-07W6/0
Location Alias: 00/09-10-79-07 W6M
Location Alias 2: 00/09-10-079-07 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 07
Section: 10
County/Municipality: Saddle Hills County
Well Name: R S R MIRAGE 9-10-79-7
Operator Name: Rising Star Resources Ltd.
License Number: 0488031
License Date: 2018-02-07
License Status: Issued
Spud Date: 2018-02-13
Final Drill Date: 2018-02-23
Well Total Depth: 3007.00 m
Surface Hole Latitude: 55.832059
Surface Hole Longitude: -119.025457

For data sources see[1][2]

Well History

Date Event
2018-02-07 Obtained License
2018-02-14 Surface Casing Operation Performed
2018-02-16 Direction Drilling Operation Performed - Deviate
2018-02-17 Direction Drilling Operation Performed - Horizontal
2018-02-17 Well Log Performed
2018-02-18 Intermediate Casing Operation Performed
2018-02-23 Finished Drilling
2018-02-23 Well Log Performed
2018-02-23 Well Mode changed to Drilled and Cased
2018-02-24 Liner Casing Operation Performed
2018-02-25 Rig Released
2018-02-28 Well Log Performed
2018-03-01 Well Began Production
2018-03-01 Well Fluid changed to Crude Oil
2018-03-01 Well Mode changed to Pumping
2018-03-09 Perforation Treatment Performed - Multi-Stage Fracture

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-02-13 Star Valley Drilling Ltd. 202 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-02-16 998.60 Deviate (5 - 79 degrees)
2018-02-17 1465.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-03-09 Multi-Stage Fracture 2957.00 2957.10 0
2018-03-09 Multi-Stage Fracture 2468.70 2468.80 0
2018-03-09 Multi-Stage Fracture 2418.90 2419.00 0
2018-03-09 Multi-Stage Fracture 2381.40 2381.50 0
2018-03-09 Multi-Stage Fracture 2319.40 2319.50 0
2018-03-09 Multi-Stage Fracture 2269.70 2269.80 0
2018-03-09 Multi-Stage Fracture 2219.80 2219.90 0
2018-03-09 Multi-Stage Fracture 2169.90 2170.00 0
2018-03-09 Multi-Stage Fracture 2108.10 2108.20 0
2018-03-09 Multi-Stage Fracture 2046.70 2046.80 0
2018-03-09 Multi-Stage Fracture 1996.90 1997.00 0
2018-03-09 Multi-Stage Fracture 2915.30 2915.40 0
2018-03-09 Multi-Stage Fracture 1947.60 1947.70 0
2018-03-09 Multi-Stage Fracture 1872.80 1872.90 0
2018-03-09 Multi-Stage Fracture 1824.00 1824.10 0
2018-03-09 Multi-Stage Fracture 1786.10 1786.20 0
2018-03-09 Multi-Stage Fracture 1736.50 1736.60 0
2018-03-09 Multi-Stage Fracture 1698.50 1698.60 0
2018-03-09 Multi-Stage Fracture 1636.30 1636.40 0
2018-03-09 Multi-Stage Fracture 1574.20 1574.30 0
2018-03-09 Multi-Stage Fracture 1524.20 1524.30 0
2018-03-09 Multi-Stage Fracture 2865.30 2865.40 0
2018-03-09 Multi-Stage Fracture 2803.20 2803.30 0
2018-03-09 Multi-Stage Fracture 2741.30 2741.40 0
2018-03-09 Multi-Stage Fracture 2691.70 2691.80 0
2018-03-09 Multi-Stage Fracture 2630.20 2630.30 0
2018-03-09 Multi-Stage Fracture 2567.80 2567.90 0
2018-03-09 Multi-Stage Fracture 2518.50 2518.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-03-09 2018-03-09 1,326 1,765 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Nitrogen Not Available 100 5.7452 N/A
Water 7732-18-5 100 80.6352 N/A
20/40 Import Sand Step Energy Services Crystalline Silica 14808-60-7 100 7.8918 N/A
20/40 Yukon Black Step Energy Services Quartz (SiO2) 14808-60-7 100 5.2471 N/A
2K7 W-M (Biocide) Step Energy Services Bactericide/Biocide 2-Bromo-2-nitropropane-1.3.-diol (BNPD) 52-51-7 100 0.0082 N/A
Methanol 67-56-1 100 0.0082 N/A
Non-Hazardous Ingredients Not Available 100 0.0082 N/A
SBO-1 (Breaker) Step Energy Services Breaker Disodium peroxydisulfate 7775-27-1 100 0.0115 N/A
SCS-8 (Clay Control) Step Energy Services Clay Control Inorganic Salt Not Available 100 0.1196 N/A
SFR-106 (Friction Reducer) Step Energy Services Friction Reducer Ethoxylated Alcohol 78330-21-9 100 0.1817 N/A
Non-Hazardous Ingredients Not Available 100 0.1817 N/A
Petroleum distillates. hydrotreated light 64742-47-8 100 0.1817 N/A
SNE-2 (Non-Emulsifier) Step Energy Services Surfactant 2-Ethylhexanol distillation residue 68609-68-7 100 0.1592 N/A
Dodecylbenzene Sulfonic Acid 27176-87-0 100 0.1592 N/A
Methanol 67-56-1 100 0.1592 N/A
Monoethanolamine 141-43-5 100 0.1592 N/A
Oxirane. methyl-. polymer 11/6/9003 100 0.1592 N/A
Poly(oxy-1.2-ethanediyl). alphaisotridecyl-omega-hydroxy- 9043-30-5 100 0.1592 N/A
Water 7732-18-5 100 0.1592 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-02-28 2018-03-03 Surface Water - Runoff 2460

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 4952 0.0 0.0 0.0
2019 7377 0.0 0.0 0.0
2020 2150 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-02-25 No Incident Encountered 0.00 0.00
2018-02-28 No Incident Encountered 0.00 0.00

For data sources see[10]

References