X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0796070310000

Well Details

Well ID: 0796070310000
Loading map...
Location: 00/10-03-079-07W6/0
Location Alias: 00/10-03-79-07 W6M
Location Alias 2: 00/10-03-079-07 W6/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 6
Range: 07
Section: 03
County/Municipality: Saddle Hills County
Well Name: KELT EXP MIRAGE 10-3-79-7
Operator Name: Kelt Exploration Ltd.
License Number: 0162768
License Date: 1993-12-02
License Status: Issued
Spud Date: 1993-12-08
Final Drill Date: 1993-12-17
Well Total Depth: 1400.00 m
Surface Hole Latitude: 55.819326
Surface Hole Longitude: -118.998866

For data sources see[1][2]

Well History

Date Event
1993-12-02 Obtained License
1993-12-08 Well Log Performed
1993-12-11 Surface Casing Operation Performed
1993-12-17 Finished Drilling
1993-12-17 Well Mode changed to Drilled and Cased
1993-12-18 Well Log Performed
1993-12-19 Drill Stem Test Performed
1993-12-20 Drill Stem Test Performed
1993-12-21 Drill Stem Test Performed
1993-12-22 Production Casing Operation Performed
1993-12-22 Rig Released
1994-03-04 Perforation Treatment Performed - Jet Perforation
1994-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-03-09 Well Log Performed
1994-03-11 Perforation Treatment Performed - Jet Perforation
1994-03-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-07-28 Perforation Treatment Performed - Jet Perforation
1995-07-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-08-01 Perforation Treatment Performed - Jet Perforation
1995-08-01 Well Log Performed
1995-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-08-05 Well Log Performed
1995-08-06 Perforation Treatment Performed - Fractured
1996-07-30 Well Began Production
1996-07-30 Well Fluid changed to Gas
1996-07-30 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-03-04 Perforation 1356.00 1358.50 13
1995-08-01 Perforation 1355.50 1358.50 14
1995-08-01 Perforation 1359.80 1362.00 14
1995-08-03 Acid Treatment 1349.50 1354.50 0
1995-08-06 Fracture 1349.50 1358.50 0
1994-03-06 Acid Treatment 1356.00 1358.50 0
1994-03-11 Perforation 1301.00 1303.00 13
1994-03-13 Acid Treatment 1301.00 1303.00 0
1995-07-28 Perforation 1349.50 1351.50 14
1995-07-28 Perforation 1352.50 1354.50 14
1995-07-30 Acid Treatment 1349.50 1358.50 0
1995-08-01 Perforation 1349.50 1351.50 14
1995-08-01 Perforation 1352.50 1354.50 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 5828 0.0 0.0 0.0
1997 7215 0.0 0.0 0.0
1998 8106 0.0 0.0 0.0
1999 8290 0.0 0.0 0.0
2000 7978 0.0 0.0 0.0
2001 7512 0.0 0.0 0.0
2002 8463 0.0 0.0 0.0
2003 8407 0.0 0.0 0.0
2004 8605 0.0 0.0 0.0
2005 8263 0.0 0.0 0.0
2006 8437 0.0 0.0 0.0
2007 7967 0.0 0.0 0.0
2008 8550 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8736 0.0 0.0 0.0
2014 8356 0.0 0.0 0.0
2015 8587 0.0 0.0 0.0
2016 8757 0.0 0.0 0.0
2017 4084 0.0 0.0 0.0
2018 6646 0.0 0.0 0.0
2019 7029 0.0 0.0 0.0
2020 1967 0.0 0.0 0.0

For data sources see[5]

References