If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0795221910000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.862077,"lon":-117.432389,"icon":""}]} |
Location: 00/10-19-079-22W5/0 | |
Location Alias: 00/10-19-79-22 W5M | |
Location Alias 2: 00/10-19-079-22 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 079 | |
Meridian: 5 | |
Range: 22 | |
Section: 19 | |
County/Municipality: Municipal District of Smoky River No. 130 | |
Well Name: CNRL ET AL NVILLE 10-19-79-22 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0146849 | |
License Date: 1990-12-10 | |
License Status: Suspension | |
Spud Date: 1990-12-15 | |
Final Drill Date: 1990-12-20 | |
Well Total Depth: 1175.00 m | |
Surface Hole Latitude: 55.862077 | |
Surface Hole Longitude: -117.432389 |
Date | Event |
---|---|
1990-12-10 | Obtained License |
1990-12-16 | Surface Casing Operation Performed |
1990-12-20 | Finished Drilling |
1990-12-20 | Well Mode changed to Drilled and Cased |
1990-12-21 | Well Log Performed |
1990-12-22 | Drill Stem Test Performed |
1990-12-23 | Drill Stem Test Performed |
1990-12-25 | Production Casing Operation Performed |
1990-12-25 | Rig Released |
1991-01-24 | Well Log Performed |
1991-01-25 | Perforation Treatment Performed - Jet Perforation |
1991-01-25 | Well Log Performed |
1991-01-26 | Perforation Treatment Performed - Fractured |
1991-01-27 | Well Log Performed |
1991-02-02 | Well Began Production |
1991-02-02 | Well Fluid changed to Crude Oil |
1991-02-02 | Well Mode changed to Pumping |
1993-03-19 | Perforation Treatment Performed - Chemical Squeeze |
1997-07-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1997-07-27 | Plug Back Performed |
1997-07-27 | Well Fluid changed to Crude Oil |
1997-07-27 | Well Mode changed to Abandoned and Whipstocked |
1997-12-21 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1991-01-25 | Perforation | 1077.00 | 1081.00 | 13 |
1991-01-26 | Fracture | 1077.00 | 1081.00 | 0 |
1993-03-19 | Chemical Squeeze | 1077.00 | 1081.00 | 0 |
1997-07-27 | Packing Device Capped w/Cement | 1062.00 | 1070.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1991 | 7135 | 0.0 | 0.0 | 0.0 |
1992 | 8069 | 0.0 | 0.0 | 0.0 |
1993 | 7688 | 0.0 | 0.0 | 0.0 |
1994 | 8619 | 0.0 | 0.0 | 0.0 |
1995 | 8015 | 0.0 | 0.0 | 0.0 |
1996 | 7951 | 0.0 | 0.0 | 0.0 |
1997 | 4635 | 0.0 | 0.0 | 0.0 |
For data sources see[5]