If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0795201206036 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.847442,"lon":-117.033559,"icon":""}]} |
| Location: 03/06-12-079-20W5/6 | |
| Location Alias: 03/06-12-79-20 W5M | |
| Location Alias 2: 03/06-12-079-20 W5/06 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 079 | |
| Meridian: 5 | |
| Range: 20 | |
| Section: 12 | |
| County/Municipality: Municipal District of Smoky River No. 130 | |
| Well Name: BAYTEX W55 HZ KIMIWAN 6-12-79-20 | |
| Operator Name: Baytex Energy Ltd. | |
| License Number: 0475202 | |
| License Date: 2015-04-10 | |
| License Status: Amended | |
| Spud Date: 2017-12-16 | |
| Final Drill Date: 2018-01-15 | |
| Well Total Depth: 3717.00 m | |
| Surface Hole Latitude: 55.847442 | |
| Surface Hole Longitude: -117.033559 |
| Date | Event |
|---|---|
| 2015-04-10 | Obtained License |
| 2017-12-16 | Surface Casing Operation Performed |
| 2017-12-29 | Direction Drilling Operation Performed - Deviate |
| 2017-12-30 | Direction Drilling Operation Performed - Horizontal |
| 2017-12-30 | Intermediate Casing Operation Performed |
| 2018-01-09 | Direction Drilling Operation Performed - Horizontal |
| 2018-01-13 | Direction Drilling Operation Performed - Horizontal |
| 2018-01-15 | Finished Drilling |
| 2018-01-15 | Well Log Performed |
| 2018-01-15 | Well Structure changed to Drain |
| 2018-01-22 | Perforation Treatment Performed - Open-Hole Completion |
| 2018-01-22 | Rig Released |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2017-12-29 | 478.50 | Deviate (5 - 79 degrees) |
| 2017-12-30 | 905.40 | Horizontal |
| 2018-01-09 | 998.00 | Horizontal |
| 2018-01-13 | 1296.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2018-01-22 | Open Hole/Barefoot Completion | 1296.00 | 3717.00 | 0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2018-01-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]