X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0795110208000

Well Details

Well ID: 0795110208000
Loading map...
Location: 00/08-02-079-11W5/0
Location Alias: 00/08-02-79-11 W5M
Location Alias 2: 00/08-02-079-11 W5/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 5
Range: 11
Section: 02
County/Municipality: Gift Lake Metis Settlement
Well Name: AMOCO GIFT 8-2-79-11
Operator Name: BP Canada Energy Group ULC
License Number: 0112574
License Date: 1985-01-18
License Status: RecCertified
Spud Date: 1985-02-26
Final Drill Date: 1985-03-12
Well Total Depth: 1885.00 m
Surface Hole Latitude: 55.815001
Surface Hole Longitude: -115.596929

For data sources see[1][2]

Well History

Date Event
1985-01-18 Obtained License
1985-02-28 Surface Casing Operation Performed
1985-03-02 Drill Stem Test Performed
1985-03-03 Drill Stem Test Performed
1985-03-10 Drill Stem Test Performed
1985-03-12 Finished Drilling
1985-03-12 Well Log Performed
1985-03-13 Drill Stem Test Performed
1985-03-13 Well Log Performed
1985-03-14 Drill Stem Test Performed
1985-03-16 Production Casing Operation Performed
1985-03-16 Rig Released
1985-03-22 Well Log Performed
1985-03-24 Perforation Treatment Performed - Jet Perforation
1985-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-26 Perforation Treatment Performed - Jet Perforation
1985-03-26 Well Mode changed to Drilled and Cased
1985-04-01 Perforation Treatment Performed - Cement Squeeze
1985-04-01 Plug Back Performed
1985-04-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-04-05 Perforation Treatment Performed - Jet Perforation
1985-04-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-04-10 Perforation Treatment Performed - Jet Perforation
1985-04-10 Plug Back Performed
1985-04-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-13 Perforation Treatment Performed - Jet Perforation
1985-04-13 Well Log Performed
1985-04-14 Perforation Treatment Performed - Cement Squeeze
1985-04-16 Perforation Treatment Performed - Jet Perforation
1985-04-16 Well Log Performed
1985-04-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-04-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1985-04-22 Well Log Performed
1985-06-01 Well Began Production
1985-06-01 Well Fluid changed to Crude Oil
1985-06-01 Well Mode changed to Flowing
1985-11-18 Perforation Treatment Performed - Jet Perforation
1985-11-18 Well Log Performed
1985-11-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-22 Perforation Treatment Performed - Jet Perforation
1985-11-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-12-01 Well Fluid changed to Crude Oil
1985-12-01 Well Mode changed to Suspended
1989-03-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-03-23 Plug Back Performed
1989-03-23 Well Abandoned
1989-03-23 Well Fluid changed to Crude Oil
1989-03-23 Well Log Performed
1989-03-23 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-03-24 Perforation 1850.50 1852.00 13
1985-04-10 Packing Device Capped w/Cement 1834.00 1840.00 0
1985-04-10 Perforation 1809.00 1810.50 13
1985-04-10 Perforation 1811.50 1812.50 13
1985-04-11 Acid Treatment 1809.00 1812.50 0
1985-04-13 Perforation 1814.50 1815.00 13
1985-04-14 Cement Squeeze 1814.50 1815.00 0
1985-04-16 Perforation 1809.00 1811.00 13
1985-04-16 Perforation 1809.00 1811.00 13
1985-04-18 Acid Treatment 1809.00 1812.50 0
1985-04-22 Packing Device Capped w/Cement 1792.00 1800.00 0
1985-03-25 Acid Treatment 1850.50 1852.00 0
1985-11-18 Perforation 1141.00 1147.00 13
1985-11-20 Acid Treatment 1141.00 1147.00 0
1985-11-22 Perforation 1050.00 1055.00 13
1985-11-24 Acid Treatment 1050.00 1055.00 0
1989-03-23 Packing Device Capped w/Cement 1032.00 1040.00 0
1985-03-26 Perforation 1844.00 1845.00 13
1985-03-26 Perforation 1848.40 1848.90 13
1985-04-01 Cement Squeeze 1848.40 1848.90 0
1985-04-03 Packing Device Capped w/Cement 1847.00 1850.00 0
1985-04-05 Perforation 1844.00 1845.00 13
1985-04-06 Acid Treatment 1844.00 1845.00 0
1985-04-08 Acid Treatment 1844.00 1845.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 48 0.0 0.0 0.0

For data sources see[5]

References