X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0795080412000

Well Details

Well ID: 0795080412000
Loading map...
Location: 00/12-04-079-08W5/0
Location Alias: 00/12-04-79-08 W5M
Location Alias 2: 00/12-04-079-08 W5/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 5
Range: 08
Section: 04
County/Municipality: Northern Sunrise County
Well Name: AMOCO NIPISI 12-4-79-8
Operator Name: Canadian Natural Resources Limited
License Number: 0127649
License Date: 1987-07-30
License Status: Suspension
Spud Date: 1987-08-21
Final Drill Date: 1987-08-31
Well Total Depth: 1770.00 m
Surface Hole Latitude: 55.819607
Surface Hole Longitude: -115.198570

For data sources see[1][2]

Well History

Date Event
1987-07-30 Obtained License
1987-08-21 Surface Casing Operation Performed
1987-08-31 Finished Drilling
1987-08-31 Well Mode changed to Drilled and Cased
1987-09-01 Well Log Performed
1987-09-02 Drill Stem Test Performed
1987-09-03 Production Casing Operation Performed
1987-09-04 Rig Released
1987-11-03 Well Log Performed
1987-11-05 Perforation Treatment Performed - Jet Perforation
1987-11-05 Well Log Performed
1987-11-06 Well Began Production
1987-11-06 Well Fluid changed to Crude Oil
1987-11-06 Well Mode changed to Flowing
1987-11-07 Well Log Performed
1992-01-29 Perforation Treatment Performed - Jet Perforation
1992-01-30 Perforation Treatment Performed - Chemical Squeeze
1992-01-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-03-04 Well Log Performed
1994-10-21 Well Fluid changed to Crude Oil
1994-10-21 Well Mode changed to Pumping
1994-12-03 Well Log Performed
1994-12-06 Perforation Treatment Performed - Cement Squeeze
2009-12-31 Well Fluid changed to Crude Oil
2009-12-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-11-05 Perforation 1733.00 1734.00 13
1992-01-29 Perforation 1729.30 1731.00 13
1992-01-29 Perforation 1731.50 1732.50 13
1992-01-29 Perforation 1733.00 1735.50 13
1992-01-29 Perforation 1736.20 1737.60 13
1992-01-30 Chemical Squeeze 1729.30 1737.60 0
1992-01-31 Acid Treatment 1729.30 1737.60 0
1994-12-06 Cement Squeeze 1736.20 1737.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 1122 0.0 0.0 0.0
1988 8231 0.0 0.0 0.0
1989 8590 0.0 0.0 0.0
1990 8692 0.0 0.0 0.0
1991 8339 0.0 0.0 0.0
1992 7795 0.0 0.0 0.0
1993 6649 0.0 0.0 0.0
1994 7329 0.0 0.0 0.0
1995 8626 0.0 0.0 0.0
1996 8548 0.0 0.0 0.0
1997 8407 0.0 0.0 0.0
1998 8327 0.0 0.0 0.0
1999 8685 0.0 0.0 0.0
2000 8566 0.0 0.0 0.0
2001 8276 0.0 0.0 0.0
2002 8076 0.0 0.0 0.0
2003 8426 0.0 0.0 0.0
2004 8756 0.0 0.0 0.0
2005 7002 0.0 0.0 0.0
2006 2757 0.0 0.0 0.0
2007 8720 0.0 0.0 0.0
2008 8568 0.0 0.0 0.0
2009 3924 0.0 0.0 0.0

For data sources see[5]

References