X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0795080310000

Well Details

Well ID: 0795080310000
Loading map...
Location: 00/10-03-079-08W5/0
Location Alias: 00/10-03-79-08 W5M
Location Alias 2: 00/10-03-079-08 W5/00
Country: Canada
Province: Alberta
Township: 079
Meridian: 5
Range: 08
Section: 03
County/Municipality: Northern Sunrise County
Well Name: LASMO NIPISI 10-3-79-8
Operator Name: Canadian Natural Resources Limited
License Number: 0030183
License Date: 1966-03-08
License Status: Issued
Spud Date: 1966-03-09
Final Drill Date: 1966-03-25
Well Total Depth: 1755.60 m
Surface Hole Latitude: 55.819914
Surface Hole Longitude: -115.158836

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1965-03-29 Perforation Treatment Performed - Jet Perforation
1966-03-08 Obtained License
1966-03-25 Finished Drilling
1966-03-25 Well Mode changed to Drilled and Cased
1966-03-26 Production Casing Operation Performed
1966-03-29 Well Log Performed
1966-04-01 Well Began Production
1966-04-01 Well Fluid changed to Crude Oil
1966-04-01 Well Mode changed to Flowing
1969-10-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-10-25 Perforation Treatment Performed - Jet Perforation
1971-02-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-05-29 Well Fluid changed to Crude Oil
1975-05-29 Well Mode changed to Pumping
1982-10-13 Perforation Treatment Performed - Jet Perforation
1985-11-03 Perforation Treatment Performed - Jet Perforation
1985-11-03 Well Log Performed
1985-11-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-11-05 Perforation Treatment Performed - Chemical Squeeze
1991-08-20 Perforation Treatment Performed - Chemical Squeeze
1991-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-12 Perforation Treatment Performed - Chemical Squeeze
1992-01-13 Perforation Treatment Performed - Chemical Squeeze
1992-03-18 Well Log Performed
1992-03-30 Perforation Treatment Performed - Cement Squeeze
1992-04-03 Perforation Treatment Performed - Jet Perforation
1992-04-08 Perforation Treatment Performed - Jet Perforation
1992-04-08 Well Log Performed
1995-03-27 Perforation Treatment Performed - Jet Perforation
1995-04-19 Perforation Treatment Performed - Jet Perforation
1996-03-05 Well Log Performed
1996-03-13 Well Log Performed
2002-08-14 Perforation Treatment Performed - Jet Perforation
2002-08-14 Well Log Performed
2003-11-24 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1965-03-29 Perforation 1727.30 1728.80 3
1982-10-13 Perforation 1732.00 1735.00 13
1985-11-03 Perforation 1722.70 1726.40 13
1985-11-03 Perforation 1727.30 1728.80 13
1985-11-03 Perforation 1729.40 1732.00 13
1985-11-04 Acid Treatment 1722.70 1735.00 0
1985-11-05 Chemical Squeeze 1722.70 1735.00 0
1991-08-20 Chemical Squeeze 1722.70 1735.00 0
1991-08-21 Acid Treatment 1722.70 1735.00 0
1992-01-12 Chemical Squeeze 1722.70 1735.00 0
1992-01-13 Chemical Squeeze 1722.70 1735.00 0
1965-03-29 Perforation 1731.60 1732.20 3
1992-03-30 Cement Squeeze 1722.70 1735.00 0
1992-04-03 Perforation 1721.20 1724.90 13
1992-04-03 Perforation 1725.80 1727.30 13
1992-04-08 Perforation 1724.00 1729.00 19
1995-03-27 Perforation 1724.00 1726.00 13
1995-03-27 Perforation 1727.00 1729.00 13
1995-04-19 Perforation 1724.00 1726.00 13
1995-04-19 Perforation 1727.00 1729.00 13
2002-08-14 Perforation 1721.20 1726.00 17
2002-08-14 Perforation 1727.00 1728.00 17
1965-03-29 Perforation 1733.10 1734.00 3
2003-11-24 Acid Treatment 1721.20 1729.00 0
1969-10-25 Perforation 1722.70 1724.90 7
1969-10-25 Perforation 1725.50 1726.10 7
1969-10-25 Perforation 1729.40 1731.60 7
1969-10-25 Perforation 1732.20 1733.10 7
1969-10-25 Acid Treatment 1722.70 1733.10 0
1971-02-03 Acid Treatment 1722.70 1734.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0
1967 5672 0.0 0.0 0.0
1968 7160 0.0 0.0 0.0
1969 6958 0.0 0.0 0.0
1970 8292 0.0 0.0 0.0
1971 5365 0.0 0.0 0.0
1972 8062 0.0 0.0 0.0
1973 6988 0.0 0.0 0.0
1974 8111 0.0 0.0 0.0
1975 4351 0.0 0.0 0.0
1976 6689 0.0 0.0 0.0
1977 2766 0.0 0.0 0.0
1978 5432 0.0 0.0 0.0
1979 8129 0.0 0.0 0.0
1980 8439 0.0 0.0 0.0
1981 8432 0.0 0.0 0.0
1982 5481 0.0 0.0 0.0
1983 377 0.0 0.0 0.0
1985 948 0.0 0.0 0.0
1986 7226 0.0 0.0 0.0
1987 7682 0.0 0.0 0.0
1988 8511 0.0 0.0 0.0
1989 8643 0.0 0.0 0.0
1990 8491 0.0 0.0 0.0
1991 8511 0.0 0.0 0.0
1992 7550 0.0 0.0 0.0
1993 6744 0.0 0.0 0.0
1994 7561 0.0 0.0 0.0
1995 7142 0.0 0.0 0.0
1996 8405 0.0 0.0 0.0
1997 8169 0.0 0.0 0.0
1998 7637 0.0 0.0 0.0
1999 8480 0.0 0.0 0.0
2000 7572 0.0 0.0 0.0
2001 8686 0.0 0.0 0.0
2002 8318 0.0 0.0 0.0
2003 4316 0.0 0.0 0.0
2004 8191 0.0 0.0 0.0
2005 8026 0.0 0.0 0.0
2006 7954 0.0 0.0 0.0
2007 8447 0.0 0.0 0.0
2008 7337 0.0 0.0 0.0
2009 7915 0.0 0.0 0.0
2010 8554 0.0 0.0 0.0
2011 8375 0.0 0.0 0.0
2012 6836 0.0 0.0 0.0
2013 6740 0.0 0.0 0.0
2014 8637 0.0 0.0 0.0
2015 4507 0.0 0.0 0.0
2016 7891 0.0 0.0 0.0
2017 8660 0.0 0.0 0.0
2018 8677 0.0 0.0 0.0
2019 7538 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References