X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0795060103003

Well Details

Well ID: 0795060103003
Loading map...
Location: 00/03-01-079-06W5/3
Location Alias: 00/03-01-79-06 W5M
Location Alias 2: 00/03-01-079-06 W5/03
Country: Canada
Province: Alberta
Township: 079
Meridian: 5
Range: 06
Section: 01
County/Municipality: Municipal District of Opportunity No. 17
Well Name: FIRENZE 102 MARTEN 3-1-79-6
Operator Name: Firenze Energy Ltd.
License Number: 0196672
License Date: 1997-01-14
License Status: Suspension
Spud Date: 1997-01-20
Final Drill Date: 1997-01-27
Well Total Depth: 597.00 m
Surface Hole Latitude: 55.812587
Surface Hole Longitude: -114.796704

For data sources see[1][2]

Well History

Date Event
1997-01-14 Obtained License
1997-01-24 Well Log Performed
1997-01-27 Finished Drilling
1997-01-27 Well Log Performed
1997-01-27 Well Mode changed to Drilled and Cased
1997-01-28 Plug Back Performed
1997-01-30 Perforation Treatment Performed - Jet Perforation
1997-01-30 Well Log Performed
1997-01-31 Rig Released
1997-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-02-14 Perforation Treatment Performed - Jet Perforation
2000-02-15 Well Log Performed
2000-02-18 Well Log Performed
2000-03-03 Well Began Production
2000-03-03 Well Fluid changed to Gas
2000-03-03 Well Mode changed to Flowing
2003-03-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-03-23 Plug Back Performed
2003-03-23 Well Fluid changed to Gas
2003-03-23 Well Mode changed to Abandoned Zone
2003-04-03 Well Abandoned
2003-04-03 Well Fluid changed to Gas
2003-04-03 Well Mode changed to Abandoned and Re-entered
2005-01-28 Well Log Performed
2005-01-29 Perforation Treatment Performed - Jet Perforation
2005-01-29 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-01-30 Perforation 546.00 549.30 14
2005-01-29 Perforation 366.90 374.20 10
1997-02-02 Acid Treatment 546.00 549.30 0
2000-02-14 Perforation 459.00 461.40 13
2000-02-14 Perforation 519.40 521.20 13
2000-02-14 Perforation 504.00 505.20 13
2000-02-14 Perforation 496.20 497.50 13
2003-03-23 Packing Device Capped w/Cement 519.00 527.00 0
2003-03-23 Packing Device Capped w/Cement 442.00 450.00 0
2005-01-29 Perforation 356.00 360.90 10

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 5930 0.0 0.0 0.0
2001 8529 0.0 0.0 0.0
2002 1413 0.0 0.0 0.0

For data sources see[5]

References