X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786133010000

Well Details

Well ID: 0786133010000
Loading map...
Location: 00/10-30-078-13W6/0
Location Alias: 00/10-30-78-13 W6M
Location Alias 2: 00/10-30-078-13 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 13
Section: 30
County/Municipality: Saddle Hills County
Well Name: BIR 14-21 HZ PCOUPES 10-30-78-13
Operator Name: Birchcliff Energy Ltd.
License Number: 0481585
License Date: 2016-11-23
License Status: Issued
Spud Date: 2016-12-11
Final Drill Date: 2017-01-31
Well Total Depth: 5450.00 m
Surface Hole Latitude: 55.780465
Surface Hole Longitude: -119.957526

For data sources see[1][2]

Well History

Date Event
2016-11-23 Obtained License
2016-12-11 Well Mode changed to Preset
2016-12-13 Surface Casing Operation Performed
2017-01-21 Direction Drilling Operation Performed - Deviate
2017-01-25 Direction Drilling Operation Performed - Horizontal
2017-01-26 Well Log Performed
2017-01-31 Finished Drilling
2017-01-31 Well Log Performed
2017-01-31 Well Mode changed to Drilled and Cased
2017-02-01 Well Log Performed
2017-02-03 Production Casing Operation Performed
2017-02-05 Rig Released
2017-02-22 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-22 Perforation Treatment Performed - Open-Hole Completion
2017-02-23 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-24 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-25 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-27 Well Began Production
2017-02-27 Well Fluid changed to Gas
2017-02-27 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-12-11 Ensign Drilling Inc. 555 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-01-21 780.90 Deviate (5 - 79 degrees)
2017-01-25 2504.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-02-22 Open Hole/Barefoot Completion 5445.00 5450.00 0
2017-02-23 Multi-Stage Fracture 4894.40 4895.30 0
2017-02-23 Multi-Stage Fracture 4829.10 4830.00 0
2017-02-23 Multi-Stage Fracture 4763.80 4764.70 0
2017-02-23 Multi-Stage Fracture 4698.60 4699.50 0
2017-02-23 Multi-Stage Fracture 4633.30 4634.20 0
2017-02-23 Multi-Stage Fracture 4568.30 4569.20 0
2017-02-23 Multi-Stage Fracture 4503.10 4504.00 0
2017-02-23 Multi-Stage Fracture 4437.80 4438.70 0
2017-02-24 Multi-Stage Fracture 4034.40 4035.30 0
2017-02-24 Multi-Stage Fracture 3969.10 3970.00 0
2017-02-22 Multi-Stage Fracture 5421.20 5422.50 0
2017-02-24 Multi-Stage Fracture 3903.80 3904.70 0
2017-02-24 Multi-Stage Fracture 3838.60 3839.50 0
2017-02-24 Multi-Stage Fracture 3773.30 3774.20 0
2017-02-24 Multi-Stage Fracture 3708.10 3709.00 0
2017-02-25 Multi-Stage Fracture 3642.80 3643.70 0
2017-02-25 Multi-Stage Fracture 3577.50 3578.40 0
2017-02-25 Multi-Stage Fracture 3512.30 3513.20 0
2017-02-25 Multi-Stage Fracture 3447.00 3447.90 0
2017-02-25 Multi-Stage Fracture 3382.10 3383.00 0
2017-02-25 Multi-Stage Fracture 3317.70 3318.60 0
2017-02-22 Multi-Stage Fracture 5350.40 5351.30 0
2017-02-25 Multi-Stage Fracture 3252.40 3253.30 0
2017-02-25 Multi-Stage Fracture 3187.40 3188.30 0
2017-02-25 Multi-Stage Fracture 3122.10 3123.00 0
2017-02-25 Multi-Stage Fracture 3056.80 3057.70 0
2017-02-25 Multi-Stage Fracture 2991.60 2992.50 0
2017-02-25 Multi-Stage Fracture 2926.30 2927.20 0
2017-02-25 Multi-Stage Fracture 2861.30 2862.20 0
2017-02-25 Multi-Stage Fracture 2796.10 2797.00 0
2017-02-25 Multi-Stage Fracture 2730.90 2731.80 0
2017-02-25 Multi-Stage Fracture 2653.00 2653.90 0
2017-02-22 Multi-Stage Fracture 5285.90 5286.80 0
2017-02-25 Multi-Stage Fracture 2587.80 2588.70 0
2017-02-25 Multi-Stage Fracture 2547.80 2548.70 0
2017-02-22 Multi-Stage Fracture 5220.70 5221.60 0
2017-02-22 Multi-Stage Fracture 5155.50 5156.40 0
2017-02-22 Multi-Stage Fracture 5090.30 5091.20 0
2017-02-22 Multi-Stage Fracture 5025.00 5025.90 0
2017-02-23 Multi-Stage Fracture 4959.70 4960.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-02-22 2017-02-25 2,286 15,704 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 88.0586 N/A
FRAC SAND. 30/50 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 8.253 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 3.5314 N/A
2K7 Solution W-M BJ Services Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0303 N/A
Methanol 67-56-1 100 0.0303 N/A
Water 7732-18-5 100 0.0303 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.0037 N/A
FRP-1 BJ Services Friction Reducer Ammonium sulfate 7783-20-2 100 0.1023 N/A
Non-hazardous Not Available 100 0.1023 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-02-20 2017-02-21 Groundwater - Saline 62
2017-02-20 2017-02-25 Recycled Fracturing Water (treated at well site) 954
2017-02-20 2017-02-25 Recycled Fracturing Water (treated at well site) 1006
2017-02-12 2017-02-13 Recycled Fracturing Water (treated at well site) 147
2017-02-19 2017-02-23 Recycled Fracturing Water (treated at well site) 463
2017-02-21 2017-02-22 Surface Water - Runoff 5254
2017-02-22 2017-02-25 Surface Water - Runoff 6347
2017-02-25 2017-02-25 Surface Water - Runoff 1742

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 6498 0.0 0.0 0.0
2018 7961 0.0 0.0 0.0
2019 8601 0.0 0.0 0.0
2020 2168 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-12-13 No Incident Encountered 0.00 0.00
2017-02-05 No Incident Encountered 0.00 0.00
2017-02-25 No Incident Encountered 0.00 0.00

For data sources see[10]

References