If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786133010000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.780465,"lon":-119.957526,"icon":""}]} |
Location: 00/10-30-078-13W6/0 | |
Location Alias: 00/10-30-78-13 W6M | |
Location Alias 2: 00/10-30-078-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 13 | |
Section: 30 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 14-21 HZ PCOUPES 10-30-78-13 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0481585 | |
License Date: 2016-11-23 | |
License Status: Issued | |
Spud Date: 2016-12-11 | |
Final Drill Date: 2017-01-31 | |
Well Total Depth: 5450.00 m | |
Surface Hole Latitude: 55.780465 | |
Surface Hole Longitude: -119.957526 |
Date | Event |
---|---|
2016-11-23 | Obtained License |
2016-12-11 | Well Mode changed to Preset |
2016-12-13 | Surface Casing Operation Performed |
2017-01-21 | Direction Drilling Operation Performed - Deviate |
2017-01-25 | Direction Drilling Operation Performed - Horizontal |
2017-01-26 | Well Log Performed |
2017-01-31 | Finished Drilling |
2017-01-31 | Well Log Performed |
2017-01-31 | Well Mode changed to Drilled and Cased |
2017-02-01 | Well Log Performed |
2017-02-03 | Production Casing Operation Performed |
2017-02-05 | Rig Released |
2017-02-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-02-22 | Perforation Treatment Performed - Open-Hole Completion |
2017-02-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-02-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-02-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-02-27 | Well Began Production |
2017-02-27 | Well Fluid changed to Gas |
2017-02-27 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2016-12-11 | Ensign Drilling Inc. | 555 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-01-21 | 780.90 | Deviate (5 - 79 degrees) |
2017-01-25 | 2504.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-02-22 | Open Hole/Barefoot Completion | 5445.00 | 5450.00 | 0 |
2017-02-23 | Multi-Stage Fracture | 4894.40 | 4895.30 | 0 |
2017-02-23 | Multi-Stage Fracture | 4829.10 | 4830.00 | 0 |
2017-02-23 | Multi-Stage Fracture | 4763.80 | 4764.70 | 0 |
2017-02-23 | Multi-Stage Fracture | 4698.60 | 4699.50 | 0 |
2017-02-23 | Multi-Stage Fracture | 4633.30 | 4634.20 | 0 |
2017-02-23 | Multi-Stage Fracture | 4568.30 | 4569.20 | 0 |
2017-02-23 | Multi-Stage Fracture | 4503.10 | 4504.00 | 0 |
2017-02-23 | Multi-Stage Fracture | 4437.80 | 4438.70 | 0 |
2017-02-24 | Multi-Stage Fracture | 4034.40 | 4035.30 | 0 |
2017-02-24 | Multi-Stage Fracture | 3969.10 | 3970.00 | 0 |
2017-02-22 | Multi-Stage Fracture | 5421.20 | 5422.50 | 0 |
2017-02-24 | Multi-Stage Fracture | 3903.80 | 3904.70 | 0 |
2017-02-24 | Multi-Stage Fracture | 3838.60 | 3839.50 | 0 |
2017-02-24 | Multi-Stage Fracture | 3773.30 | 3774.20 | 0 |
2017-02-24 | Multi-Stage Fracture | 3708.10 | 3709.00 | 0 |
2017-02-25 | Multi-Stage Fracture | 3642.80 | 3643.70 | 0 |
2017-02-25 | Multi-Stage Fracture | 3577.50 | 3578.40 | 0 |
2017-02-25 | Multi-Stage Fracture | 3512.30 | 3513.20 | 0 |
2017-02-25 | Multi-Stage Fracture | 3447.00 | 3447.90 | 0 |
2017-02-25 | Multi-Stage Fracture | 3382.10 | 3383.00 | 0 |
2017-02-25 | Multi-Stage Fracture | 3317.70 | 3318.60 | 0 |
2017-02-22 | Multi-Stage Fracture | 5350.40 | 5351.30 | 0 |
2017-02-25 | Multi-Stage Fracture | 3252.40 | 3253.30 | 0 |
2017-02-25 | Multi-Stage Fracture | 3187.40 | 3188.30 | 0 |
2017-02-25 | Multi-Stage Fracture | 3122.10 | 3123.00 | 0 |
2017-02-25 | Multi-Stage Fracture | 3056.80 | 3057.70 | 0 |
2017-02-25 | Multi-Stage Fracture | 2991.60 | 2992.50 | 0 |
2017-02-25 | Multi-Stage Fracture | 2926.30 | 2927.20 | 0 |
2017-02-25 | Multi-Stage Fracture | 2861.30 | 2862.20 | 0 |
2017-02-25 | Multi-Stage Fracture | 2796.10 | 2797.00 | 0 |
2017-02-25 | Multi-Stage Fracture | 2730.90 | 2731.80 | 0 |
2017-02-25 | Multi-Stage Fracture | 2653.00 | 2653.90 | 0 |
2017-02-22 | Multi-Stage Fracture | 5285.90 | 5286.80 | 0 |
2017-02-25 | Multi-Stage Fracture | 2587.80 | 2588.70 | 0 |
2017-02-25 | Multi-Stage Fracture | 2547.80 | 2548.70 | 0 |
2017-02-22 | Multi-Stage Fracture | 5220.70 | 5221.60 | 0 |
2017-02-22 | Multi-Stage Fracture | 5155.50 | 5156.40 | 0 |
2017-02-22 | Multi-Stage Fracture | 5090.30 | 5091.20 | 0 |
2017-02-22 | Multi-Stage Fracture | 5025.00 | 5025.90 | 0 |
2017-02-23 | Multi-Stage Fracture | 4959.70 | 4960.60 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-02-22 | 2017-02-25 | 2,286 | 15,704 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 88.0586 | N/A | |||
FRAC SAND. 30/50 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 8.253 | N/A | ||
FRAC SAND. 40/70 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 3.5314 | N/A | ||
2K7 Solution W-M | BJ Services | Bactericide/Biocide | 2-Bromo-2-nitropropane-1.3-diol | 52-51-7 | 100 | 0.0303 | N/A | |
Methanol | 67-56-1 | 100 | 0.0303 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0303 | N/A | ||||
Breaker N | BJ Services | Breaker | Sodium persulphate | 7775-27-1 | 100 | 0.0037 | N/A | |
FRP-1 | BJ Services | Friction Reducer | Ammonium sulfate | 7783-20-2 | 100 | 0.1023 | N/A | |
Non-hazardous | Not Available | 100 | 0.1023 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-02-20 | 2017-02-21 | Groundwater - Saline | 62 |
2017-02-20 | 2017-02-25 | Recycled Fracturing Water (treated at well site) | 954 |
2017-02-20 | 2017-02-25 | Recycled Fracturing Water (treated at well site) | 1006 |
2017-02-12 | 2017-02-13 | Recycled Fracturing Water (treated at well site) | 147 |
2017-02-19 | 2017-02-23 | Recycled Fracturing Water (treated at well site) | 463 |
2017-02-21 | 2017-02-22 | Surface Water - Runoff | 5254 |
2017-02-22 | 2017-02-25 | Surface Water - Runoff | 6347 |
2017-02-25 | 2017-02-25 | Surface Water - Runoff | 1742 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 6498 | 0.0 | 0.0 | 0.0 |
2018 | 7961 | 0.0 | 0.0 | 0.0 |
2019 | 8601 | 0.0 | 0.0 | 0.0 |
2020 | 2168 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-12-13 | No Incident Encountered | 0.00 | 0.00 |
2017-02-05 | No Incident Encountered | 0.00 | 0.00 |
2017-02-25 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]