If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786132706000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.767291,"lon":-119.902689,"icon":""}]} |
Location: 00/06-27-078-13W6/0 | |
Location Alias: 00/06-27-78-13 W6M | |
Location Alias 2: 00/06-27-078-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 13 | |
Section: 27 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 03-23 HZ PCOUPES 6-27-78-13 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0482079 | |
License Date: 2016-12-21 | |
License Status: Issued | |
Spud Date: 2017-06-22 | |
Final Drill Date: 2017-07-05 | |
Well Total Depth: 5086.00 m | |
Surface Hole Latitude: 55.767291 | |
Surface Hole Longitude: -119.902689 |
Date | Event |
---|---|
2016-12-21 | Obtained License |
2017-06-23 | Surface Casing Operation Performed |
2017-06-24 | Direction Drilling Operation Performed - Deviate |
2017-06-29 | Direction Drilling Operation Performed - Horizontal |
2017-07-05 | Finished Drilling |
2017-07-05 | Well Log Performed |
2017-07-05 | Well Mode changed to Drilled and Cased |
2017-07-06 | Production Casing Operation Performed |
2017-07-07 | Rig Released |
2017-09-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-09-13 | Perforation Treatment Performed - Open-Hole Completion |
2017-09-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-10-01 | Well Fluid changed to Gas |
2017-10-01 | Well Mode changed to Testing |
2017-10-27 | Well Began Production |
2017-10-27 | Well Fluid changed to Gas |
2017-10-27 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-06-22 | Trinidad Drilling Ltd. | 449 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-06-24 | 708.30 | Deviate (5 - 79 degrees) |
2017-06-29 | 2450.60 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-09-13 | Open Hole/Barefoot Completion | 5082.00 | 5085.70 | 0 |
2017-09-14 | Multi-Stage Fracture | 4384.60 | 4385.50 | 0 |
2017-09-14 | Multi-Stage Fracture | 4301.60 | 4302.50 | 0 |
2017-09-14 | Multi-Stage Fracture | 4207.10 | 4208.00 | 0 |
2017-09-14 | Multi-Stage Fracture | 4112.80 | 4113.70 | 0 |
2017-09-14 | Multi-Stage Fracture | 4029.90 | 4030.80 | 0 |
2017-09-14 | Multi-Stage Fracture | 3936.40 | 3937.30 | 0 |
2017-09-14 | Multi-Stage Fracture | 3843.40 | 3844.30 | 0 |
2017-09-14 | Multi-Stage Fracture | 3750.70 | 3751.60 | 0 |
2017-09-14 | Multi-Stage Fracture | 3669.00 | 3669.90 | 0 |
2017-09-14 | Multi-Stage Fracture | 3576.20 | 3577.10 | 0 |
2017-09-13 | Multi-Stage Fracture | 5070.60 | 5071.90 | 0 |
2017-09-14 | Multi-Stage Fracture | 3484.20 | 3485.10 | 0 |
2017-09-14 | Multi-Stage Fracture | 3391.30 | 3392.20 | 0 |
2017-09-14 | Multi-Stage Fracture | 3309.80 | 3310.70 | 0 |
2017-09-14 | Multi-Stage Fracture | 3217.10 | 3218.00 | 0 |
2017-09-14 | Multi-Stage Fracture | 3124.10 | 3125.00 | 0 |
2017-09-14 | Multi-Stage Fracture | 3041.90 | 3042.80 | 0 |
2017-09-14 | Multi-Stage Fracture | 2948.40 | 2949.30 | 0 |
2017-09-14 | Multi-Stage Fracture | 2855.60 | 2856.50 | 0 |
2017-09-14 | Multi-Stage Fracture | 2762.10 | 2763.00 | 0 |
2017-09-14 | Multi-Stage Fracture | 2680.20 | 2681.10 | 0 |
2017-09-13 | Multi-Stage Fracture | 5006.50 | 5007.40 | 0 |
2017-09-14 | Multi-Stage Fracture | 2587.20 | 2588.10 | 0 |
2017-09-14 | Multi-Stage Fracture | 2528.50 | 2829.40 | 0 |
2017-09-13 | Multi-Stage Fracture | 4925.30 | 4926.20 | 0 |
2017-09-13 | Multi-Stage Fracture | 4832.80 | 4833.70 | 0 |
2017-09-14 | Multi-Stage Fracture | 4750.60 | 4751.50 | 0 |
2017-09-14 | Multi-Stage Fracture | 4656.40 | 4657.30 | 0 |
2017-09-14 | Multi-Stage Fracture | 4561.90 | 4562.80 | 0 |
2017-09-14 | Multi-Stage Fracture | 4479.00 | 4479.90 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-09-13 | 2017-09-14 | 2,279 | 12,071 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 83.3953 | N/A | |||
FRAC SAND. 30/50 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 9.7785 | N/A | ||
FRAC SAND. 40/70 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 6.6725 | N/A | ||
2K7 Solution W-M | BJ Services | Bactericide/Biocide | 2-Bromo-2-nitropropane-1.3-diol | 52-51-7 | 100 | 0.0294 | N/A | |
Methanol | 67-56-1 | 100 | 0.0294 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0294 | N/A | ||||
Breaker N | BJ Services | Breaker | Sodium persulphate | 7775-27-1 | 100 | 0.0043 | N/A | |
FRP-1 | BJ Services | Friction Reducer | Ammonium sulfate | 7783-20-2 | 100 | 0.0997 | N/A | |
Non-hazardous | Not Available | 100 | 0.0997 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-01-09 | 2017-09-16 | Recycled Fracturing Water (treated at well site) | 222 |
2017-09-02 | 2017-09-16 | Recycled Fracturing Water (treated at well site) | 609 |
2017-09-10 | 2017-09-15 | Recycled Fracturing Water (treated at well site) | 440 |
2017-08-22 | 2017-08-25 | Recycled Fracturing Water (treated at well site) | 165 |
2017-09-08 | 2017-09-15 | Surface Water - Runoff | 4012 |
2017-09-14 | 2017-09-16 | Surface Water - Runoff | 1999 |
2017-09-12 | 2017-09-13 | Surface Water - Runoff | 716 |
2017-09-08 | 2017-09-16 | Surface Water - Runoff | 4165 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 1416 | 0.0 | 0.0 | 0.0 |
2018 | 7229 | 0.0 | 0.0 | 0.0 |
2019 | 8677 | 0.0 | 0.0 | 0.0 |
2020 | 2157 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-07-07 | No Incident Encountered | 0.00 | 0.00 |
2017-09-14 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]