If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786132704000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.767344,"lon":-119.902818,"icon":""}]} |
Location: 00/04-27-078-13W6/0 | |
Location Alias: 00/04-27-78-13 W6M | |
Location Alias 2: 00/04-27-078-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 13 | |
Section: 27 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 03-23 HZ PCOUPES 4-27-78-13 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0482078 | |
License Date: 2016-12-21 | |
License Status: Issued | |
Spud Date: 2017-06-06 | |
Final Drill Date: 2017-06-18 | |
Well Total Depth: 4967.00 m | |
Surface Hole Latitude: 55.767344 | |
Surface Hole Longitude: -119.902818 |
Date | Event |
---|---|
2016-12-21 | Obtained License |
2017-06-07 | Surface Casing Operation Performed |
2017-06-08 | Direction Drilling Operation Performed - Deviate |
2017-06-14 | Direction Drilling Operation Performed - Horizontal |
2017-06-18 | Finished Drilling |
2017-06-18 | Well Log Performed |
2017-06-18 | Well Mode changed to Drilled and Cased |
2017-06-19 | Production Casing Operation Performed |
2017-06-20 | Rig Released |
2017-09-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-09-15 | Perforation Treatment Performed - Open-Hole Completion |
2017-09-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-10-31 | Well Began Production |
2017-10-31 | Well Fluid changed to Gas |
2017-10-31 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-06-06 | Trinidad Drilling Ltd. | 449 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2017-06-08 | 704.30 | Deviate (5 - 79 degrees) |
2017-06-14 | 2441.40 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2017-09-15 | Open Hole/Barefoot Completion | 4963.00 | 4967.00 | 0 |
2017-09-15 | Multi-Stage Fracture | 4293.60 | 4294.50 | 0 |
2017-09-15 | Multi-Stage Fracture | 4210.60 | 4211.50 | 0 |
2017-09-15 | Multi-Stage Fracture | 4127.80 | 4128.70 | 0 |
2017-09-15 | Multi-Stage Fracture | 4044.80 | 4045.70 | 0 |
2017-09-15 | Multi-Stage Fracture | 3961.90 | 3962.80 | 0 |
2017-09-15 | Multi-Stage Fracture | 3867.70 | 3868.60 | 0 |
2017-09-15 | Multi-Stage Fracture | 3784.70 | 3785.60 | 0 |
2017-09-15 | Multi-Stage Fracture | 3701.70 | 3702.60 | 0 |
2017-09-15 | Multi-Stage Fracture | 3618.80 | 3619.70 | 0 |
2017-09-15 | Multi-Stage Fracture | 3535.80 | 3536.70 | 0 |
2017-09-15 | Multi-Stage Fracture | 4951.50 | 4952.80 | 0 |
2017-09-15 | Multi-Stage Fracture | 3441.30 | 3442.20 | 0 |
2017-09-16 | Multi-Stage Fracture | 3358.30 | 3359.20 | 0 |
2017-09-16 | Multi-Stage Fracture | 3275.40 | 3276.30 | 0 |
2017-09-16 | Multi-Stage Fracture | 3192.40 | 3193.30 | 0 |
2017-09-16 | Multi-Stage Fracture | 3109.40 | 3110.30 | 0 |
2017-09-16 | Multi-Stage Fracture | 3026.60 | 3027.50 | 0 |
2017-09-16 | Multi-Stage Fracture | 2932.10 | 2933.00 | 0 |
2017-09-16 | Multi-Stage Fracture | 2849.30 | 2850.20 | 0 |
2017-09-16 | Multi-Stage Fracture | 2766.30 | 2767.20 | 0 |
2017-09-16 | Multi-Stage Fracture | 2683.30 | 2684.20 | 0 |
2017-09-15 | Multi-Stage Fracture | 4897.50 | 4898.40 | 0 |
2017-09-16 | Multi-Stage Fracture | 2600.50 | 2601.40 | 0 |
2017-09-16 | Multi-Stage Fracture | 2517.50 | 2518.40 | 0 |
2017-09-16 | Multi-Stage Fracture | 2469.20 | 2470.10 | 0 |
2017-09-15 | Multi-Stage Fracture | 4814.60 | 4815.50 | 0 |
2017-09-15 | Multi-Stage Fracture | 4720.00 | 4720.90 | 0 |
2017-09-15 | Multi-Stage Fracture | 4637.10 | 4638.00 | 0 |
2017-09-15 | Multi-Stage Fracture | 4554.10 | 4555.00 | 0 |
2017-09-15 | Multi-Stage Fracture | 4471.10 | 4472.00 | 0 |
2017-09-15 | Multi-Stage Fracture | 4388.10 | 4389.00 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-09-15 | 2017-09-16 | 2,281 | 12,505 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 83.8427 | N/A | |||
FRAC SAND. 30/50 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 9.6038 | N/A | ||
FRAC SAND. 40/70 WHITE | BJ Services | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 6.4025 | N/A | ||
2K7 Solution W-M | BJ Services | Bactericide/Biocide | 2-Bromo-2-nitropropane-1.3-diol | 52-51-7 | 100 | 0.0283 | N/A | |
Methanol | 67-56-1 | 100 | 0.0283 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0283 | N/A | ||||
Breaker N | BJ Services | Breaker | Sodium persulphate | 7775-27-1 | 100 | 0.0043 | N/A | |
FRP-1 | BJ Services | Friction Reducer | Ammonium sulfate | 7783-20-2 | 100 | 0.0984 | N/A | |
Non-hazardous | Not Available | 100 | 0.0984 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2017-01-09 | 2017-09-16 | Recycled Fracturing Water (treated at well site) | 200 |
2017-09-02 | 2017-09-16 | Recycled Fracturing Water (treated at well site) | 549 |
2017-09-10 | 2017-09-15 | Recycled Fracturing Water (treated at well site) | 397 |
2017-08-22 | 2017-08-25 | Recycled Fracturing Water (treated at well site) | 149 |
2017-09-08 | 2017-09-15 | Surface Water - Runoff | 3617 |
2017-09-14 | 2017-09-16 | Surface Water - Runoff | 1802 |
2017-09-12 | 2017-09-13 | Surface Water - Runoff | 645 |
2017-09-08 | 2017-09-16 | Surface Water - Runoff | 3755 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 1379 | 0.0 | 0.0 | 0.0 |
2018 | 7726 | 0.0 | 0.0 | 0.0 |
2019 | 8663 | 0.0 | 0.0 | 0.0 |
2020 | 2154 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2017-06-20 | No Incident Encountered | 0.00 | 0.00 |
2017-09-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]