X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786132704000

Well Details

Well ID: 0786132704000
Loading map...
Location: 00/04-27-078-13W6/0
Location Alias: 00/04-27-78-13 W6M
Location Alias 2: 00/04-27-078-13 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 13
Section: 27
County/Municipality: Saddle Hills County
Well Name: BIR 03-23 HZ PCOUPES 4-27-78-13
Operator Name: Birchcliff Energy Ltd.
License Number: 0482078
License Date: 2016-12-21
License Status: Issued
Spud Date: 2017-06-06
Final Drill Date: 2017-06-18
Well Total Depth: 4967.00 m
Surface Hole Latitude: 55.767344
Surface Hole Longitude: -119.902818

For data sources see[1][2]

Well History

Date Event
2016-12-21 Obtained License
2017-06-07 Surface Casing Operation Performed
2017-06-08 Direction Drilling Operation Performed - Deviate
2017-06-14 Direction Drilling Operation Performed - Horizontal
2017-06-18 Finished Drilling
2017-06-18 Well Log Performed
2017-06-18 Well Mode changed to Drilled and Cased
2017-06-19 Production Casing Operation Performed
2017-06-20 Rig Released
2017-09-15 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-15 Perforation Treatment Performed - Open-Hole Completion
2017-09-16 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-31 Well Began Production
2017-10-31 Well Fluid changed to Gas
2017-10-31 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2017-06-06 Trinidad Drilling Ltd. 449 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2017-06-08 704.30 Deviate (5 - 79 degrees)
2017-06-14 2441.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-09-15 Open Hole/Barefoot Completion 4963.00 4967.00 0
2017-09-15 Multi-Stage Fracture 4293.60 4294.50 0
2017-09-15 Multi-Stage Fracture 4210.60 4211.50 0
2017-09-15 Multi-Stage Fracture 4127.80 4128.70 0
2017-09-15 Multi-Stage Fracture 4044.80 4045.70 0
2017-09-15 Multi-Stage Fracture 3961.90 3962.80 0
2017-09-15 Multi-Stage Fracture 3867.70 3868.60 0
2017-09-15 Multi-Stage Fracture 3784.70 3785.60 0
2017-09-15 Multi-Stage Fracture 3701.70 3702.60 0
2017-09-15 Multi-Stage Fracture 3618.80 3619.70 0
2017-09-15 Multi-Stage Fracture 3535.80 3536.70 0
2017-09-15 Multi-Stage Fracture 4951.50 4952.80 0
2017-09-15 Multi-Stage Fracture 3441.30 3442.20 0
2017-09-16 Multi-Stage Fracture 3358.30 3359.20 0
2017-09-16 Multi-Stage Fracture 3275.40 3276.30 0
2017-09-16 Multi-Stage Fracture 3192.40 3193.30 0
2017-09-16 Multi-Stage Fracture 3109.40 3110.30 0
2017-09-16 Multi-Stage Fracture 3026.60 3027.50 0
2017-09-16 Multi-Stage Fracture 2932.10 2933.00 0
2017-09-16 Multi-Stage Fracture 2849.30 2850.20 0
2017-09-16 Multi-Stage Fracture 2766.30 2767.20 0
2017-09-16 Multi-Stage Fracture 2683.30 2684.20 0
2017-09-15 Multi-Stage Fracture 4897.50 4898.40 0
2017-09-16 Multi-Stage Fracture 2600.50 2601.40 0
2017-09-16 Multi-Stage Fracture 2517.50 2518.40 0
2017-09-16 Multi-Stage Fracture 2469.20 2470.10 0
2017-09-15 Multi-Stage Fracture 4814.60 4815.50 0
2017-09-15 Multi-Stage Fracture 4720.00 4720.90 0
2017-09-15 Multi-Stage Fracture 4637.10 4638.00 0
2017-09-15 Multi-Stage Fracture 4554.10 4555.00 0
2017-09-15 Multi-Stage Fracture 4471.10 4472.00 0
2017-09-15 Multi-Stage Fracture 4388.10 4389.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-09-15 2017-09-16 2,281 12,505 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 83.8427 N/A
FRAC SAND. 30/50 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 9.6038 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 6.4025 N/A
2K7 Solution W-M BJ Services Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0283 N/A
Methanol 67-56-1 100 0.0283 N/A
Water 7732-18-5 100 0.0283 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.0043 N/A
FRP-1 BJ Services Friction Reducer Ammonium sulfate 7783-20-2 100 0.0984 N/A
Non-hazardous Not Available 100 0.0984 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-01-09 2017-09-16 Recycled Fracturing Water (treated at well site) 200
2017-09-02 2017-09-16 Recycled Fracturing Water (treated at well site) 549
2017-09-10 2017-09-15 Recycled Fracturing Water (treated at well site) 397
2017-08-22 2017-08-25 Recycled Fracturing Water (treated at well site) 149
2017-09-08 2017-09-15 Surface Water - Runoff 3617
2017-09-14 2017-09-16 Surface Water - Runoff 1802
2017-09-12 2017-09-13 Surface Water - Runoff 645
2017-09-08 2017-09-16 Surface Water - Runoff 3755

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 1379 0.0 0.0 0.0
2018 7726 0.0 0.0 0.0
2019 8663 0.0 0.0 0.0
2020 2154 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-06-20 No Incident Encountered 0.00 0.00
2017-09-16 No Incident Encountered 0.00 0.00

For data sources see[10]

References