If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786132601000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.793875,"lon":-119.923482,"icon":""}]} |
Location: 00/01-26-078-13W6/0 | |
Location Alias: 00/01-26-78-13 W6M | |
Location Alias 2: 00/01-26-078-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 13 | |
Section: 26 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 15-27 HZ PCOUPES 1-26-78-13 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0485457 | |
License Date: 2017-09-15 | |
License Status: Amended | |
Spud Date: 2017-11-30 | |
Final Drill Date: 2018-02-12 | |
Well Total Depth: 5075.00 m | |
Surface Hole Latitude: 55.793875 | |
Surface Hole Longitude: -119.923482 |
Date | Event |
---|---|
2017-09-15 | Obtained License |
2017-12-01 | Surface Casing Operation Performed |
2018-02-01 | Direction Drilling Operation Performed - Deviate |
2018-02-07 | Direction Drilling Operation Performed - Horizontal |
2018-02-12 | Finished Drilling |
2018-02-12 | Well Log Performed |
2018-02-12 | Well Mode changed to Drilled and Cased |
2018-02-13 | Production Casing Operation Performed |
2018-02-13 | Well Log Performed |
2018-02-15 | Rig Released |
2018-03-01 | Well Fluid changed to Gas |
2018-03-01 | Well Mode changed to Testing |
2018-03-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-08 | Perforation Treatment Performed - Open-Hole Completion |
2018-03-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-23 | Well Began Production |
2018-03-23 | Well Fluid changed to Gas |
2018-03-23 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-11-30 | Precision Drilling Corporation | 543 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-02-01 | 680.80 | Deviate (5 - 79 degrees) |
2018-02-07 | 2494.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-03-08 | Open Hole/Barefoot Completion | 5072.00 | 5075.00 | 0 |
2018-03-08 | Multi-Stage Fracture | 4604.80 | 4605.70 | 0 |
2018-03-09 | Multi-Stage Fracture | 4545.70 | 4546.60 | 0 |
2018-03-09 | Multi-Stage Fracture | 4486.60 | 4487.50 | 0 |
2018-03-09 | Multi-Stage Fracture | 4427.40 | 4428.30 | 0 |
2018-03-09 | Multi-Stage Fracture | 4368.50 | 4369.40 | 0 |
2018-03-09 | Multi-Stage Fracture | 4309.40 | 4310.30 | 0 |
2018-03-09 | Multi-Stage Fracture | 4261.40 | 4262.30 | 0 |
2018-03-09 | Multi-Stage Fracture | 4191.30 | 4192.20 | 0 |
2018-03-09 | Multi-Stage Fracture | 4143.70 | 4144.60 | 0 |
2018-03-09 | Multi-Stage Fracture | 4084.20 | 4085.10 | 0 |
2018-03-08 | Multi-Stage Fracture | 5060.00 | 5061.30 | 0 |
2018-03-09 | Multi-Stage Fracture | 4024.30 | 4025.20 | 0 |
2018-03-09 | Multi-Stage Fracture | 3964.90 | 3965.80 | 0 |
2018-03-09 | Multi-Stage Fracture | 3905.60 | 3906.50 | 0 |
2018-03-09 | Multi-Stage Fracture | 3846.20 | 3847.10 | 0 |
2018-03-09 | Multi-Stage Fracture | 3787.20 | 3788.10 | 0 |
2018-03-09 | Multi-Stage Fracture | 3727.90 | 3728.80 | 0 |
2018-03-09 | Multi-Stage Fracture | 3668.40 | 3669.30 | 0 |
2018-03-09 | Multi-Stage Fracture | 3609.40 | 3610.30 | 0 |
2018-03-10 | Multi-Stage Fracture | 3550.20 | 3551.10 | 0 |
2018-03-10 | Multi-Stage Fracture | 3491.00 | 3491.90 | 0 |
2018-03-08 | Multi-Stage Fracture | 5018.20 | 5019.10 | 0 |
2018-03-10 | Multi-Stage Fracture | 3431.80 | 3432.70 | 0 |
2018-03-10 | Multi-Stage Fracture | 3372.90 | 3373.80 | 0 |
2018-03-10 | Multi-Stage Fracture | 3325.10 | 3326.00 | 0 |
2018-03-10 | Multi-Stage Fracture | 3265.70 | 3266.60 | 0 |
2018-03-10 | Multi-Stage Fracture | 3206.70 | 3207.60 | 0 |
2018-03-10 | Multi-Stage Fracture | 3147.40 | 3148.30 | 0 |
2018-03-10 | Multi-Stage Fracture | 3087.90 | 3088.80 | 0 |
2018-03-10 | Multi-Stage Fracture | 3028.70 | 3029.60 | 0 |
2018-03-10 | Multi-Stage Fracture | 2969.90 | 2970.80 | 0 |
2018-03-10 | Multi-Stage Fracture | 2910.80 | 2911.70 | 0 |
2018-03-08 | Multi-Stage Fracture | 4959.50 | 4960.40 | 0 |
2018-03-10 | Multi-Stage Fracture | 2851.40 | 2852.30 | 0 |
2018-03-10 | Multi-Stage Fracture | 2733.60 | 2734.50 | 0 |
2018-03-10 | Multi-Stage Fracture | 2674.30 | 2675.20 | 0 |
2018-03-10 | Multi-Stage Fracture | 2615.10 | 2616.00 | 0 |
2018-03-10 | Multi-Stage Fracture | 2555.90 | 2556.80 | 0 |
2018-03-10 | Multi-Stage Fracture | 2519.50 | 2520.40 | 0 |
2018-03-08 | Multi-Stage Fracture | 4900.30 | 4901.20 | 0 |
2018-03-08 | Multi-Stage Fracture | 4841.70 | 4842.60 | 0 |
2018-03-08 | Multi-Stage Fracture | 4782.80 | 4783.70 | 0 |
2018-03-08 | Multi-Stage Fracture | 4723.50 | 4724.40 | 0 |
2018-03-08 | Multi-Stage Fracture | 4664.40 | 4665.30 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-03-08 | 2018-03-10 | 2,371 | 14,495 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 84.345 | N/A | |||
30/50 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 10.392 | N/A | ||
40/70 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 5.196 | N/A | ||
Econocide B1008 (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0082 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0082 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0082 | N/A | ||||
SBO-1 (Breaker) | Step Energy Services | Breaker | Disodium peroxydisulfate | 7775-27-1 | 100 | 0.0084 | N/A | |
SFR-106 (Friction Reducer) | Step Energy Services | Friction Reducer | Ethoxylated Alcohol | 78330-21-9 | 100 | 0.0533 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.0533 | N/A | ||||
Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.0533 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-03-13 | 2018-03-14 | Surface Water - Runoff | 3254 |
2018-03-10 | 2018-03-14 | Surface Water - Runoff | 5620 |
2018-03-08 | 2018-03-17 | Surface Water - Runoff | 5620 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 5392 | 0.0 | 0.0 | 0.0 |
2019 | 8629 | 0.0 | 0.0 | 0.0 |
2020 | 2173 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-02-15 | No Incident Encountered | 0.00 | 0.00 |
2018-04-10 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]