If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786132316020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.793785,"lon":-119.923481,"icon":""}]} |
Location: 02/16-23-078-13W6/0 | |
Location Alias: 02/16-23-78-13 W6M | |
Location Alias 2: 02/16-23-078-13 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 13 | |
Section: 23 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 15-27 HZ 102 PCOUPES 16-23-78-13 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0485455 | |
License Date: 2017-09-15 | |
License Status: Amended | |
Spud Date: 2017-12-02 | |
Final Drill Date: 2018-01-29 | |
Well Total Depth: 5226.00 m | |
Surface Hole Latitude: 55.793785 | |
Surface Hole Longitude: -119.923481 |
Date | Event |
---|---|
2017-09-15 | Obtained License |
2017-12-03 | Surface Casing Operation Performed |
2018-01-17 | Direction Drilling Operation Performed - Deviate |
2018-01-23 | Direction Drilling Operation Performed - Horizontal |
2018-01-29 | Finished Drilling |
2018-01-29 | Production Casing Operation Performed |
2018-01-29 | Well Log Performed |
2018-01-29 | Well Mode changed to Drilled and Cased |
2018-01-31 | Rig Released |
2018-03-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-13 | Perforation Treatment Performed - Open-Hole Completion |
2018-03-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-04-01 | Well Fluid changed to Gas |
2018-04-01 | Well Mode changed to Testing |
2018-04-02 | Well Began Production |
2018-04-02 | Well Fluid changed to Gas |
2018-04-02 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2017-12-02 | Precision Drilling Corporation | 543 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-01-17 | 684.30 | Deviate (5 - 79 degrees) |
2018-01-23 | 2462.10 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-03-13 | Open Hole/Barefoot Completion | 5209.00 | 5226.00 | 0 |
2018-03-13 | Multi-Stage Fracture | 4708.60 | 4709.50 | 0 |
2018-03-13 | Multi-Stage Fracture | 4649.20 | 4650.10 | 0 |
2018-03-13 | Multi-Stage Fracture | 4590.40 | 4591.30 | 0 |
2018-03-13 | Multi-Stage Fracture | 4531.40 | 4532.30 | 0 |
2018-03-13 | Multi-Stage Fracture | 4460.90 | 4461.80 | 0 |
2018-03-13 | Multi-Stage Fracture | 4402.00 | 4402.90 | 0 |
2018-03-13 | Multi-Stage Fracture | 4342.90 | 4343.80 | 0 |
2018-03-13 | Multi-Stage Fracture | 4284.40 | 4285.30 | 0 |
2018-03-14 | Multi-Stage Fracture | 4213.30 | 4214.20 | 0 |
2018-03-14 | Multi-Stage Fracture | 4154.00 | 4154.90 | 0 |
2018-03-13 | Multi-Stage Fracture | 5197.70 | 5199.00 | 0 |
2018-03-14 | Multi-Stage Fracture | 4094.40 | 4095.30 | 0 |
2018-03-14 | Multi-Stage Fracture | 4035.40 | 4036.30 | 0 |
2018-03-14 | Multi-Stage Fracture | 3964.90 | 3965.80 | 0 |
2018-03-14 | Multi-Stage Fracture | 3905.40 | 3906.30 | 0 |
2018-03-14 | Multi-Stage Fracture | 3846.50 | 3847.40 | 0 |
2018-03-14 | Multi-Stage Fracture | 3787.40 | 3788.30 | 0 |
2018-03-14 | Multi-Stage Fracture | 3728.20 | 3729.10 | 0 |
2018-03-14 | Multi-Stage Fracture | 3657.40 | 3658.30 | 0 |
2018-03-14 | Multi-Stage Fracture | 3598.30 | 3599.20 | 0 |
2018-03-14 | Multi-Stage Fracture | 3538.70 | 3539.60 | 0 |
2018-03-13 | Multi-Stage Fracture | 5155.60 | 5156.50 | 0 |
2018-03-14 | Multi-Stage Fracture | 3479.20 | 3480.10 | 0 |
2018-03-14 | Multi-Stage Fracture | 3408.40 | 3409.30 | 0 |
2018-03-14 | Multi-Stage Fracture | 3349.50 | 3350.40 | 0 |
2018-03-14 | Multi-Stage Fracture | 3290.10 | 3291.00 | 0 |
2018-03-14 | Multi-Stage Fracture | 3231.20 | 3232.10 | 0 |
2018-03-14 | Multi-Stage Fracture | 3160.70 | 3161.60 | 0 |
2018-03-14 | Multi-Stage Fracture | 3101.90 | 3102.80 | 0 |
2018-03-14 | Multi-Stage Fracture | 3042.50 | 3043.40 | 0 |
2018-03-14 | Multi-Stage Fracture | 2983.20 | 2984.10 | 0 |
2018-03-14 | Multi-Stage Fracture | 2923.90 | 2924.80 | 0 |
2018-03-13 | Multi-Stage Fracture | 5096.90 | 5097.80 | 0 |
2018-03-14 | Multi-Stage Fracture | 2864.40 | 2865.30 | 0 |
2018-03-15 | Multi-Stage Fracture | 2805.20 | 2806.10 | 0 |
2018-03-15 | Multi-Stage Fracture | 2734.60 | 2735.50 | 0 |
2018-03-15 | Multi-Stage Fracture | 2676.20 | 2677.10 | 0 |
2018-03-15 | Multi-Stage Fracture | 2612.80 | 2613.70 | 0 |
2018-03-15 | Multi-Stage Fracture | 2558.00 | 2558.90 | 0 |
2018-03-15 | Multi-Stage Fracture | 2499.00 | 2499.90 | 0 |
2018-03-13 | Multi-Stage Fracture | 5037.60 | 5038.50 | 0 |
2018-03-13 | Multi-Stage Fracture | 4967.50 | 4968.40 | 0 |
2018-03-13 | Multi-Stage Fracture | 4897.50 | 4898.40 | 0 |
2018-03-13 | Multi-Stage Fracture | 4838.20 | 4839.10 | 0 |
2018-03-13 | Multi-Stage Fracture | 4779.30 | 4780.20 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-03-13 | 2018-03-15 | 2,377 | 14,476 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | 7732-18-5 | 100 | 84.0616 | N/A | |||
30/50 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 10.5739 | N/A | ||
40/70 Import Sand | Step Energy Services | Crystalline Silica | 14808-60-7 | 100 | 5.2869 | N/A | ||
Econocide B1008 (Biocide) | Step Energy Services | Bactericide/Biocide | 2-bromo-2-nitro.3-diol | 52-51-7 | 100 | 0.0081 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0081 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0081 | N/A | ||||
SBO-1 (Breaker) | Step Energy Services | Breaker | Disodium peroxydisulfate | 7775-27-1 | 100 | 0.0083 | N/A | |
SFR-106 (Friction Reducer) | Step Energy Services | Friction Reducer | Ethoxylated Alcohol | 78330-21-9 | 100 | 0.061 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.061 | N/A | ||||
Petroleum distillates. hydrotreated light | 64742-47-8 | 100 | 0.061 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-03-13 | 2018-03-14 | Surface Water - Runoff | 3250 |
2018-03-10 | 2018-03-14 | Surface Water - Runoff | 5613 |
2018-03-08 | 2018-03-17 | Surface Water - Runoff | 5613 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 5953 | 0.0 | 0.0 | 0.0 |
2019 | 8627 | 0.0 | 0.0 | 0.0 |
2020 | 2171 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-01-31 | No Incident Encountered | 0.00 | 0.00 |
2018-04-01 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]