X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786132214020

Well Details

Well ID: 0786132214020
Loading map...
Location: 02/14-22-078-13W6/0
Location Alias: 02/14-22-78-13 W6M
Location Alias 2: 02/14-22-078-13 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 13
Section: 22
County/Municipality: Saddle Hills County
Well Name: BIRCHCLIFF HZ 02 PCOUPES 14-22-78-13
Operator Name: Birchcliff Energy Ltd.
License Number: 0477778
License Date: 2015-11-19
License Status: Issued
Spud Date: 2016-01-26
Final Drill Date: 2016-02-09
Well Total Depth: 4894.00 m
Surface Hole Latitude: 55.766916
Surface Hole Longitude: -119.903376

For data sources see[1][2]

Well History

Date Event
2015-11-19 Obtained License
2016-01-27 Surface Casing Operation Performed
2016-01-28 Direction Drilling Operation Performed - Deviate
2016-02-03 Direction Drilling Operation Performed - Horizontal
2016-02-03 Well Log Performed
2016-02-09 Finished Drilling
2016-02-09 Well Log Performed
2016-02-09 Well Mode changed to Drilled and Cased
2016-02-11 Production Casing Operation Performed
2016-02-12 Rig Released
2016-03-03 Perforation Treatment Performed - Multi-Stage Fracture
2016-03-03 Perforation Treatment Performed - Open-Hole Completion
2016-03-04 Perforation Treatment Performed - Multi-Stage Fracture
2016-03-05 Well Fluid changed to Gas
2016-03-05 Well Mode changed to Testing
2016-03-09 Well Began Production
2016-03-09 Well Fluid changed to Gas
2016-03-09 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-01-26 Trinidad Drilling Ltd. 39 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-01-28 725.50 Deviate (5 - 79 degrees)
2016-02-03 2408.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-03-03 Open Hole/Barefoot Completion 4888.00 4894.00 0
2016-03-03 Multi-Stage Fracture 4156.70 4157.50 0
2016-03-03 Multi-Stage Fracture 4063.60 4064.40 0
2016-03-04 Multi-Stage Fracture 3970.50 3971.30 0
2016-03-04 Multi-Stage Fracture 3877.30 3878.10 0
2016-03-04 Multi-Stage Fracture 3784.40 3785.20 0
2016-03-04 Multi-Stage Fracture 3678.70 3679.50 0
2016-03-04 Multi-Stage Fracture 3585.60 3586.40 0
2016-03-04 Multi-Stage Fracture 3493.30 3494.10 0
2016-03-04 Multi-Stage Fracture 3400.20 3401.00 0
2016-03-04 Multi-Stage Fracture 3307.10 3307.90 0
2016-03-03 Multi-Stage Fracture 4876.70 4877.50 0
2016-03-04 Multi-Stage Fracture 3201.40 3202.20 0
2016-03-04 Multi-Stage Fracture 3108.40 3109.20 0
2016-03-04 Multi-Stage Fracture 3016.30 3017.10 0
2016-03-04 Multi-Stage Fracture 2923.60 2924.40 0
2016-03-04 Multi-Stage Fracture 2830.50 2831.30 0
2016-03-04 Multi-Stage Fracture 2724.70 2725.50 0
2016-03-04 Multi-Stage Fracture 2632.40 2633.20 0
2016-03-04 Multi-Stage Fracture 2539.30 2540.10 0
2016-03-04 Multi-Stage Fracture 2446.50 2447.30 0
2016-03-04 Multi-Stage Fracture 2391.30 2392.10 0
2016-03-03 Multi-Stage Fracture 4832.80 4833.60 0
2016-03-03 Multi-Stage Fracture 4727.50 4728.30 0
2016-03-03 Multi-Stage Fracture 4634.40 4635.20 0
2016-03-03 Multi-Stage Fracture 4541.30 4542.10 0
2016-03-03 Multi-Stage Fracture 4488.10 4488.90 0
2016-03-03 Multi-Stage Fracture 4355.00 4355.80 0
2016-03-03 Multi-Stage Fracture 4249.60 4250.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-03-03 2016-03-04 2,282 9,430 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 81.0028 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 11.2375 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 7.4839 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0118 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0113 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 0.2165 N/A
DWP-641 Calfrac Friction Reducer Ammonium chloride 12125-02-9 100 0.0859 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0851 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0848 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-02-29 2016-03-02 Recycled Fracturing Water (treated at well site) 844
2015-12-01 2015-12-02 Surface Water - Runoff 2810
2015-12-02 2015-12-03 Surface Water - Runoff 2258
2016-01-26 2016-03-04 Surface Water - Runoff 3518

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 5987 0.0 0.0 0.0
2017 7065 0.0 0.0 0.0
2018 7668 0.0 0.0 0.0
2019 8603 0.0 0.0 0.0
2020 2147 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-02-12 No Incident Encountered 0.00 0.00
2016-03-04 No Incident Encountered 0.00 0.00

For data sources see[10]

References