X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786132213000

Well Details

Well ID: 0786132213000
Loading map...
Location: 00/13-22-078-13W6/0
Location Alias: 00/13-22-78-13 W6M
Location Alias 2: 00/13-22-078-13 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 13
Section: 22
County/Municipality: Saddle Hills County
Well Name: BIRCHCLIFF 3-23 PCOUPES 13-22-78-13
Operator Name: Birchcliff Energy Ltd.
License Number: 0477713
License Date: 2015-11-17
License Status: Issued
Spud Date: 2016-01-07
Final Drill Date: 2016-01-22
Well Total Depth: 4842.00 m
Surface Hole Latitude: 55.766862
Surface Hole Longitude: -119.903242

For data sources see[1][2]

Well History

Date Event
2015-11-17 Obtained License
2016-01-07 Surface Casing Operation Performed
2016-01-09 Direction Drilling Operation Performed - Deviate
2016-01-16 Direction Drilling Operation Performed - Horizontal
2016-01-20 Production Casing Operation Performed
2016-01-22 Finished Drilling
2016-01-22 Well Log Performed
2016-01-22 Well Mode changed to Drilled and Cased
2016-01-25 Rig Released
2016-03-01 Perforation Treatment Performed - Multi-Stage Fracture
2016-03-01 Perforation Treatment Performed - Open-Hole Completion
2016-03-02 Perforation Treatment Performed - Multi-Stage Fracture
2016-03-05 Well Fluid changed to Gas
2016-03-05 Well Mode changed to Testing
2016-03-10 Well Began Production
2016-03-10 Well Fluid changed to Gas
2016-03-10 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-01-07 Trinidad Drilling Ltd. 439 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-01-09 767.40 Deviate (5 - 79 degrees)
2016-01-16 2374.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-03-01 Open Hole/Barefoot Completion 4840.00 4842.00 0
2016-03-02 Multi-Stage Fracture 4122.70 4123.50 0
2016-03-02 Multi-Stage Fracture 4029.60 4030.40 0
2016-03-02 Multi-Stage Fracture 3936.40 3937.20 0
2016-03-02 Multi-Stage Fracture 3843.30 3844.10 0
2016-03-02 Multi-Stage Fracture 3750.60 3751.40 0
2016-03-02 Multi-Stage Fracture 3645.00 3645.80 0
2016-03-02 Multi-Stage Fracture 3552.90 3553.70 0
2016-03-02 Multi-Stage Fracture 3459.80 3460.60 0
2016-03-02 Multi-Stage Fracture 3366.70 3367.50 0
2016-03-02 Multi-Stage Fracture 3273.80 3274.60 0
2016-03-01 Multi-Stage Fracture 4828.70 4829.50 0
2016-03-02 Multi-Stage Fracture 3180.90 3181.70 0
2016-03-02 Multi-Stage Fracture 3088.00 3088.80 0
2016-03-02 Multi-Stage Fracture 2994.90 2995.70 0
2016-03-02 Multi-Stage Fracture 2901.80 2902.60 0
2016-03-02 Multi-Stage Fracture 2809.40 2810.20 0
2016-03-02 Multi-Stage Fracture 2716.20 2717.00 0
2016-03-02 Multi-Stage Fracture 2623.90 2624.70 0
2016-03-02 Multi-Stage Fracture 2531.30 2532.10 0
2016-03-02 Multi-Stage Fracture 2438.20 2439.00 0
2016-03-02 Multi-Stage Fracture 2382.90 2383.70 0
2016-03-01 Multi-Stage Fracture 4771.70 4772.50 0
2016-03-01 Multi-Stage Fracture 4678.70 4679.50 0
2016-03-02 Multi-Stage Fracture 4585.70 4586.50 0
2016-03-02 Multi-Stage Fracture 4492.60 4493.40 0
2016-03-02 Multi-Stage Fracture 4399.50 4400.30 0
2016-03-02 Multi-Stage Fracture 4307.50 4308.30 0
2016-03-02 Multi-Stage Fracture 4215.70 4216.50 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-03-01 2016-03-02 2,280 11,938 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 84.1748 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 9.3345 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 6.2178 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0094 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0089 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 0.621 N/A
DWP-641 Calfrac Friction Reducer Ammonium chloride 12125-02-9 100 0.0809 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0802 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0799 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-02-29 2016-03-02 Recycled Fracturing Water (treated at well site) 928
2016-02-29 2016-03-03 Oilfield Produced Water 402
2015-12-03 2015-12-05 Surface Water - Runoff 6868
2015-12-02 2015-12-03 Surface Water - Runoff 3742

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 6285 0.0 0.0 0.0
2017 8243 0.0 0.0 0.0
2018 8239 0.0 0.0 0.0
2019 8691 0.0 0.0 0.0
2020 2149 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-01-25 No Incident Encountered 0.00 0.00
2016-03-02 No Incident Encountered 0.00 0.00

For data sources see[10]

References