X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786131716000

Well Details

Well ID: 0786131716000
Loading map...
Location: 00/16-17-078-13W6/0
Location Alias: 00/16-17-78-13 W6M
Location Alias 2: 00/16-17-078-13 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 13
Section: 17
County/Municipality: Saddle Hills County
Well Name: BIRCHCLIFF HZ PCOUPES 16-17-78-13
Operator Name: Birchcliff Energy Ltd.
License Number: 0474964
License Date: 2015-03-11
License Status: Issued
Spud Date: 2015-04-23
Final Drill Date: 2015-05-05
Well Total Depth: 4174.00 m
Surface Hole Latitude: 55.755107
Surface Hole Longitude: -119.940728

For data sources see[1][2]

Well History

Date Event
2015-03-11 Obtained License
2015-04-24 Surface Casing Operation Performed
2015-04-28 Direction Drilling Operation Performed - Deviate
2015-04-30 Direction Drilling Operation Performed - Horizontal
2015-04-30 Well Log Performed
2015-05-05 Finished Drilling
2015-05-05 Well Log Performed
2015-05-05 Well Mode changed to Drilled and Cased
2015-05-07 Liner Casing Operation Performed
2015-05-07 Production Casing Operation Performed
2015-05-09 Rig Released
2015-06-29 Perforation Treatment Performed - Multi-Stage Fracture
2015-06-29 Perforation Treatment Performed - Open-Hole Completion
2015-06-30 Perforation Treatment Performed - Multi-Stage Fracture
2015-07-01 Perforation Treatment Performed - Multi-Stage Fracture
2015-07-01 Well Fluid changed to Gas
2015-07-01 Well Mode changed to Testing
2015-07-03 Well Began Production
2015-07-03 Well Fluid changed to Gas
2015-07-03 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-04-23 Ensign Drilling Inc. 111 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-04-28 741.50 Deviate (5 - 79 degrees)
2015-04-30 2372.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-06-29 Open Hole/Barefoot Completion 4166.00 4174.00 0
2015-06-30 Multi-Stage Fracture 2959.00 2959.80 0
2015-07-01 Multi-Stage Fracture 2813.50 2814.30 0
2015-07-01 Multi-Stage Fracture 2680.50 2681.30 0
2015-07-01 Multi-Stage Fracture 2535.00 2535.80 0
2015-07-01 Multi-Stage Fracture 2402.00 2402.80 0
2015-06-29 Multi-Stage Fracture 4154.70 4155.50 0
2015-06-29 Multi-Stage Fracture 4079.60 4080.40 0
2015-06-30 Multi-Stage Fracture 3803.00 3803.80 0
2015-06-30 Multi-Stage Fracture 3658.30 3659.10 0
2015-06-30 Multi-Stage Fracture 3526.40 3527.20 0
2015-06-30 Multi-Stage Fracture 3381.60 3382.40 0
2015-06-30 Multi-Stage Fracture 3236.80 3237.60 0
2015-06-30 Multi-Stage Fracture 3104.80 3105.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-06-29 2015-06-29 2,269 0 N/A
2 2015-06-29 2015-07-01 2,269 6,899 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 6.1033 N/A
2 potassium chloride 7447-40-7 100 86.3129 N/A
water Not Available 100 86.3129 N/A
Prime Plus 40/70 Trican hexamethylenetetramine 100-97-0 100 1.7 N/A
silica crystalline 14808-60-7 100 1.7 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 11.4707 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0213 N/A
dibromoacetonitrile 3252-43-5 100 0.0213 N/A
non-hazardous ingredients Not Available 100 0.0213 N/A
polyethylene glycol 25322-68-3 100 0.0213 N/A
sodium bromide 7647-15-6 100 0.0213 N/A
GFR-3D Trican Friction Reducer non-hazardous ingredients Not Available 100 0.0254 N/A
sodium chloride 7647-14-5 100 0.0254 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-05-30 2015-06-16 Recycled Fracturing Water (treated at well site) 232
2015-05-30 2015-06-16 Recycled Fracturing Water (treated at well site) 232
2015-06-26 2015-06-30 Surface Water - Runoff 5892
2015-06-26 2015-06-30 Surface Water - Runoff 525
2015-05-31 2015-06-27 Groundwater - Saline 267

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 3639 0.0 0.0 0.0
2016 8481 0.0 0.0 0.0
2017 8281 0.0 0.0 0.0
2018 7663 0.0 0.0 0.0
2019 8534 0.0 0.0 0.0
2020 2154 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-05-09 No Incident Encountered 0.00 0.00
2015-07-05 No Incident Encountered 0.00 0.00

For data sources see[10]

References