X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786131308002

Well Details

Well ID: 0786131308002
Loading map...
Location: 00/08-13-078-13W6/2
Location Alias: 00/08-13-78-13 W6M
Location Alias 2: 00/08-13-078-13 W6/02
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 13
Section: 13
County/Municipality: Saddle Hills County
Well Name: BIR 03-23 HZ PCOUPES 8-13-78-13
Operator Name: Birchcliff Energy Ltd.
License Number: 0482076
License Date: 2016-12-21
License Status: Amended
Spud Date: 2017-07-08
Final Drill Date: 2017-08-07
Well Total Depth: 5076.00 m
Surface Hole Latitude: 55.767238
Surface Hole Longitude: -119.902561

For data sources see[1][2]

Well History

Date Event
2016-12-21 Obtained License
2017-07-09 Surface Casing Operation Performed
2017-07-30 Direction Drilling Operation Performed - Horizontal
2017-08-07 Finished Drilling
2017-08-07 Well Log Performed
2017-08-07 Well Mode changed to Drilled and Cased
2017-08-08 Well Log Performed
2017-08-09 Production Casing Operation Performed
2017-08-10 Rig Released
2017-09-10 Perforation Treatment Performed - Multi-Stage Fracture
2017-09-10 Perforation Treatment Performed - Open-Hole Completion
2017-09-11 Perforation Treatment Performed - Multi-Stage Fracture
2017-10-01 Well Fluid changed to Gas
2017-10-01 Well Mode changed to Testing
2017-10-27 Well Began Production
2017-10-27 Well Fluid changed to Gas
2017-10-27 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2017-07-30 807.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-09-10 Open Hole/Barefoot Completion 5073.00 5076.00 0
2017-09-11 Multi-Stage Fracture 4426.90 4427.80 0
2017-09-11 Multi-Stage Fracture 4344.20 4345.10 0
2017-09-11 Multi-Stage Fracture 4261.70 4262.60 0
2017-09-11 Multi-Stage Fracture 4165.80 4166.70 0
2017-09-11 Multi-Stage Fracture 4083.40 4084.30 0
2017-09-11 Multi-Stage Fracture 4000.80 4001.70 0
2017-09-11 Multi-Stage Fracture 3918.20 3919.10 0
2017-09-11 Multi-Stage Fracture 3836.10 3837.00 0
2017-09-11 Multi-Stage Fracture 3753.50 3754.30 0
2017-09-11 Multi-Stage Fracture 3670.70 3671.60 0
2017-09-10 Multi-Stage Fracture 5061.60 5062.90 0
2017-09-11 Multi-Stage Fracture 3588.20 3589.10 0
2017-09-11 Multi-Stage Fracture 3506.00 3506.90 0
2017-09-11 Multi-Stage Fracture 3423.50 3424.40 0
2017-09-11 Multi-Stage Fracture 3340.80 3341.70 0
2017-09-11 Multi-Stage Fracture 3258.30 3259.20 0
2017-09-11 Multi-Stage Fracture 3162.50 3163.40 0
2017-09-11 Multi-Stage Fracture 3079.90 3080.80 0
2017-09-11 Multi-Stage Fracture 3000.70 3001.60 0
2017-09-11 Multi-Stage Fracture 2918.30 2919.20 0
2017-09-11 Multi-Stage Fracture 2835.70 2836.60 0
2017-09-10 Multi-Stage Fracture 5002.20 5003.10 0
2017-09-11 Multi-Stage Fracture 2753.50 2754.40 0
2017-09-11 Multi-Stage Fracture 2672.80 2673.70 0
2017-09-11 Multi-Stage Fracture 2590.30 2591.20 0
2017-09-10 Multi-Stage Fracture 4923.50 4924.40 0
2017-09-10 Multi-Stage Fracture 4833.70 4834.60 0
2017-09-10 Multi-Stage Fracture 4751.00 4751.90 0
2017-09-10 Multi-Stage Fracture 4672.70 4673.60 0
2017-09-10 Multi-Stage Fracture 4590.00 4590.90 0
2017-09-11 Multi-Stage Fracture 4507.20 4508.10 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-09-10 2017-09-11 2,282 12,837 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 83.7742 N/A
FRAC SAND. 30/50 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 9.6434 N/A
FRAC SAND. 40/70 WHITE BJ Services Crystalline Silica (Quartz) 14808-60-7 100 6.4289 N/A
2K7 Solution W-M BJ Services Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0294 N/A
Methanol 67-56-1 100 0.0294 N/A
Water 7732-18-5 100 0.0294 N/A
Breaker N BJ Services Breaker Sodium persulphate 7775-27-1 100 0.004 N/A
FRP-1 BJ Services Friction Reducer Ammonium sulfate 7783-20-2 100 0.0998 N/A
Non-hazardous Not Available 100 0.0998 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-01-09 2017-09-16 Recycled Fracturing Water (treated at well site) 236
2017-09-02 2017-09-16 Recycled Fracturing Water (treated at well site) 648
2017-09-10 2017-09-15 Recycled Fracturing Water (treated at well site) 468
2017-08-22 2017-08-25 Recycled Fracturing Water (treated at well site) 175
2017-09-08 2017-09-15 Surface Water - Runoff 4266
2017-09-14 2017-09-16 Surface Water - Runoff 2126
2017-09-12 2017-09-13 Surface Water - Runoff 761
2017-09-08 2017-09-16 Surface Water - Runoff 4429

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 1184 0.0 0.0 0.0
2018 8543 0.0 0.0 0.0
2019 8662 0.0 0.0 0.0
2020 2146 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-08-10 No Incident Encountered 0.00 0.00
2017-09-11 No Incident Encountered 0.00 0.00

For data sources see[9]

References