X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786130914020

Well Details

Well ID: 0786130914020
Loading map...
Location: 02/14-09-078-13W6/0
Location Alias: 02/14-09-78-13 W6M
Location Alias 2: 02/14-09-078-13 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 13
Section: 09
County/Municipality: Saddle Hills County
Well Name: BIRCHCLIFF HZ 102 PCOUPES 14-9-78-13
Operator Name: Birchcliff Energy Ltd.
License Number: 0444506
License Date: 2012-02-27
License Status: Issued
Spud Date: 2012-04-30
Final Drill Date: 2012-05-22
Well Total Depth: 4610.00 m
Surface Hole Latitude: 55.737953
Surface Hole Longitude: -119.923774

For data sources see[1][2]

Well History

Date Event
2012-02-27 Obtained License
2012-05-02 Surface Casing Operation Performed
2012-05-07 Well Log Performed
2012-05-08 Direction Drilling Operation Performed - Deviate
2012-05-12 Direction Drilling Operation Performed - Horizontal
2012-05-22 Finished Drilling
2012-05-22 Well Log Performed
2012-05-22 Well Mode changed to Drilled and Cased
2012-05-25 Liner Casing Operation Performed
2012-05-25 Production Casing Operation Performed
2012-05-25 Rig Released
2012-06-29 Well Log Performed
2012-07-01 Well Fluid changed to Gas
2012-07-01 Well Mode changed to Testing
2012-07-06 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-06 Perforation Treatment Performed - Open-Hole Completion
2012-07-07 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-08 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-09 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-12 Perforation Treatment Performed - Multi-Stage Fracture
2012-08-29 Well Began Production
2012-08-29 Well Fluid changed to Gas
2012-08-29 Well Mode changed to Flowing
2018-07-01 Well Fluid changed to Gas
2018-07-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-04-30 Savanna Drilling Corp. 637 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-05-08 2123.00 Deviate (5 - 79 degrees)
2012-05-12 2500.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-07-06 Open Hole/Barefoot Completion 4605.00 4610.00 0
2012-07-08 Multi-Stage Fracture 3515.00 3515.80 0
2012-07-08 Multi-Stage Fracture 3386.50 3387.30 0
2012-07-08 Multi-Stage Fracture 3250.10 3250.90 0
2012-07-08 Multi-Stage Fracture 3121.80 3122.60 0
2012-07-09 Multi-Stage Fracture 2980.40 2981.20 0
2012-07-09 Multi-Stage Fracture 2850.10 2850.90 0
2012-07-09 Multi-Stage Fracture 2714.60 2715.40 0
2012-07-12 Multi-Stage Fracture 2581.00 2581.80 0
2012-07-06 Multi-Stage Fracture 4583.00 4583.80 0
2012-07-06 Multi-Stage Fracture 4458.50 4459.30 0
2012-07-06 Multi-Stage Fracture 4323.10 4323.90 0
2012-07-07 Multi-Stage Fracture 4193.50 4194.30 0
2012-07-07 Multi-Stage Fracture 4052.00 4052.80 0
2012-07-07 Multi-Stage Fracture 3921.70 3922.50 0
2012-07-07 Multi-Stage Fracture 3787.30 3788.10 0
2012-07-08 Multi-Stage Fracture 3657.30 3658.10 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 3053 0.0 0.0 0.0
2013 8657 0.0 0.0 0.0
2014 8674 0.0 0.0 0.0
2015 6297 0.0 0.0 0.0
2016 8559 0.0 0.0 0.0
2017 6848 0.0 0.0 0.0
2018 7473 0.0 0.0 0.0
2019 8559 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-05-25 No Incident Encountered 0.00 0.00
2012-07-26 No Incident Encountered 0.00 0.00

For data sources see[8]

References