X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786130809022

Well Details

Well ID: 0786130809022
Loading map...
Location: 02/09-08-078-13W6/2
Location Alias: 02/09-08-78-13 W6M
Location Alias 2: 02/09-08-078-13 W6/02
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 13
Section: 08
County/Municipality: Saddle Hills County
Well Name: BIR 11-03 HZ 102 PCOUPES 9-8-78-13
Operator Name: Birchcliff Energy Ltd.
License Number: 0478875
License Date: 2016-01-22
License Status: Amended
Spud Date: 2016-04-24
Final Drill Date: 2016-05-16
Well Total Depth: 4724.00 m
Surface Hole Latitude: 55.733076
Surface Hole Longitude: -119.932000

For data sources see[1][2]

Well History

Date Event
2016-01-22 Obtained License
2016-04-25 Surface Casing Operation Performed
2016-05-09 Direction Drilling Operation Performed - Horizontal
2016-05-13 Well Log Performed
2016-05-16 Finished Drilling
2016-05-16 Well Mode changed to Drilled and Cased
2016-05-17 Well Log Performed
2016-05-18 Production Casing Operation Performed
2016-05-19 Rig Released
2016-10-17 Perforation Treatment Performed - Multi-Stage Fracture
2016-10-17 Perforation Treatment Performed - Open-Hole Completion
2016-10-18 Perforation Treatment Performed - Multi-Stage Fracture
2016-10-28 Well Began Production
2016-10-28 Well Fluid changed to Gas
2016-10-28 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2016-05-09 1764.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-10-17 Open Hole/Barefoot Completion 4713.00 4724.00 0
2016-10-18 Multi-Stage Fracture 3717.40 3718.30 0
2016-10-18 Multi-Stage Fracture 3586.50 3587.40 0
2016-10-18 Multi-Stage Fracture 3455.70 3456.60 0
2016-10-18 Multi-Stage Fracture 3325.30 3326.20 0
2016-10-18 Multi-Stage Fracture 3194.40 3195.30 0
2016-10-18 Multi-Stage Fracture 3064.30 3065.20 0
2016-10-18 Multi-Stage Fracture 2934.10 2935.00 0
2016-10-18 Multi-Stage Fracture 2790.50 2791.40 0
2016-10-18 Multi-Stage Fracture 2659.60 2660.50 0
2016-10-18 Multi-Stage Fracture 2528.60 2529.50 0
2016-10-17 Multi-Stage Fracture 4701.70 4703.00 0
2016-10-18 Multi-Stage Fracture 2397.60 2398.50 0
2016-10-18 Multi-Stage Fracture 2329.70 2330.60 0
2016-10-18 Multi-Stage Fracture 4644.60 4645.50 0
2016-10-18 Multi-Stage Fracture 4513.70 4514.60 0
2016-10-18 Multi-Stage Fracture 4382.90 4383.80 0
2016-10-18 Multi-Stage Fracture 4239.80 4240.70 0
2016-10-18 Multi-Stage Fracture 4109.20 4110.10 0
2016-10-18 Multi-Stage Fracture 3978.30 3979.20 0
2016-10-18 Multi-Stage Fracture 3847.90 3848.80 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-10-17 2016-10-18 2,216 8,132 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 83.8964 N/A
FRAC SAND. 30/50 WHITE Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 9.2993 N/A
FRAC SAND. 40/70 WHITE Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 6.1937 N/A
2K7 Solution W-M Baker Hughes Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.019 N/A
Methanol 67-56-1 100 0.019 N/A
Water 7732-18-5 100 0.019 N/A
Breaker N Baker Hughes Breaker Sodium persulphate 7775-27-1 100 0.0059 N/A
Nitrogen Baker Hughes Energizing Fluid Nitrogen 7727-37-9 100 0.4544 N/A
MaxPerm-20A Baker Hughes Friction Reducer Non-hazardous 9014 100 0.1311 N/A
Oxyalkylated alcohol 9014 100 0.1311 N/A
Petroleum distillates 64742-47-8 100 0.131 N/A
Polyacrylate 9014 100 0.131 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-02-26 2016-02-27 Recycled Fracturing Water (treated at well site) 35
2016-03-04 2016-03-16 Recycled Fracturing Water (treated at well site) 245
2016-03-04 2016-03-16 Recycled Fracturing Water (treated at well site) 245
2016-02-26 2016-02-27 Surface Water - Runoff 35
2016-03-03 2016-03-11 Groundwater - Saline 211
2016-10-05 2016-10-17 Recycled Fracturing Water (treated at independent stand-alone facility) 249
2016-04-09 2016-04-10 Surface Water - Runoff 871
2016-04-09 2016-04-10 Surface Water - Runoff 2417
2016-04-08 2016-04-09 Surface Water - Runoff 432
2016-04-14 2016-04-16 Surface Water - Runoff 1370
2016-04-10 2016-04-12 Surface Water - Runoff 857
2016-04-16 2016-04-17 Surface Water - Runoff 673
2016-09-18 2016-09-22 Recycled Fracturing Water (treated at well site) 111
2016-09-18 2016-09-22 Recycled Fracturing Water (treated at well site) 111
2016-09-18 2016-09-22 Recycled Fracturing Water (treated at well site) 111
2016-09-18 2016-09-22 Recycled Fracturing Water (treated at well site) 111

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 1354 0.0 0.0 0.0
2017 8210 0.0 0.0 0.0
2018 8367 0.0 0.0 0.0
2019 8497 0.0 0.0 0.0
2020 2136 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-05-19 No Incident Encountered 0.00 0.00
2016-10-18 No Incident Encountered 0.00 0.00

For data sources see[9]

References