X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786130808000

Well Details

Well ID: 0786130808000
Loading map...
Location: 00/08-08-078-13W6/0
Location Alias: 00/08-08-78-13 W6M
Location Alias 2: 00/08-08-078-13 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 13
Section: 08
County/Municipality: Saddle Hills County
Well Name: BIRCHCLIFF HZ PCOUPES 8-8-78-13
Operator Name: Birchcliff Energy Ltd.
License Number: 0474829
License Date: 2015-03-03
License Status: Issued
Spud Date: 2015-03-17
Final Drill Date: 2015-05-14
Well Total Depth: 4999.00 m
Surface Hole Latitude: 55.733367
Surface Hole Longitude: -119.931503

For data sources see[1][2]

Well History

Date Event
2015-03-03 Obtained License
2015-03-19 Surface Casing Operation Performed
2015-03-19 Well Log Performed
2015-04-28 Direction Drilling Operation Performed - Deviate
2015-05-07 Direction Drilling Operation Performed - Horizontal
2015-05-14 Finished Drilling
2015-05-14 Well Log Performed
2015-05-14 Well Mode changed to Drilled and Cased
2015-05-15 Well Log Performed
2015-05-18 Liner Casing Operation Performed
2015-05-18 Production Casing Operation Performed
2015-05-18 Rig Released
2015-07-10 Well Log Performed
2015-07-11 Perforation Treatment Performed - Multi-Stage Fracture
2015-07-11 Perforation Treatment Performed - Open-Hole Completion
2015-07-19 Perforation Treatment Performed - Multi-Stage Fracture
2015-07-20 Perforation Treatment Performed - Multi-Stage Fracture
2015-07-28 Well Began Production
2015-07-28 Well Fluid changed to Gas
2015-07-28 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-03-17 Canelson Drilling Inc. 39 N/A Set Surface
2015-04-28 Canelson Drilling Inc. 39 N/A Resumption

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-04-28 910.60 Deviate (5 - 79 degrees)
2015-05-07 2544.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-07-11 Open Hole/Barefoot Completion 4988.50 4999.00 0
2015-07-20 Multi-Stage Fracture 3999.30 4000.10 0
2015-07-20 Multi-Stage Fracture 3868.30 3869.10 0
2015-07-20 Multi-Stage Fracture 3738.10 3738.90 0
2015-07-20 Multi-Stage Fracture 3607.30 3608.10 0
2015-07-20 Multi-Stage Fracture 3476.50 3477.30 0
2015-07-20 Multi-Stage Fracture 3346.00 3346.80 0
2015-07-20 Multi-Stage Fracture 3215.50 3216.30 0
2015-07-20 Multi-Stage Fracture 3084.60 3085.40 0
2015-07-20 Multi-Stage Fracture 2953.50 2954.30 0
2015-07-20 Multi-Stage Fracture 2822.60 2823.40 0
2015-07-11 Multi-Stage Fracture 4971.30 4972.10 0
2015-07-20 Multi-Stage Fracture 2692.60 2693.40 0
2015-07-20 Multi-Stage Fracture 2561.60 2562.40 0
2015-07-19 Multi-Stage Fracture 4915.30 4916.10 0
2015-07-19 Multi-Stage Fracture 4784.60 4785.40 0
2015-07-19 Multi-Stage Fracture 4653.20 4654.00 0
2015-07-19 Multi-Stage Fracture 4522.70 4523.50 0
2015-07-19 Multi-Stage Fracture 4391.90 4392.70 0
2015-07-19 Multi-Stage Fracture 4260.90 4261.70 0
2015-07-19 Multi-Stage Fracture 4129.90 4130.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-07-11 2015-07-20 2,411 7,254 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 82.2961 N/A
FRAC SAND. 30/50 WHITE Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 10.2069 N/A
FRAC SAND. 40/70 WHITE Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 4.5397 N/A
Preferred Pearl RC. 30/50 Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 2.2722 N/A
Polyurethane Resin Not Available 100 2.2723 N/A
2K7 Solution W-M Baker Hughes Bactericide/Biocide 2-Bromo-2-nitropropane-1.3-diol 52-51-7 100 0.0787 N/A
Methanol 67-56-1 100 0.0787 N/A
Water 7732-18-5 100 0.0787 N/A
Breaker N Baker Hughes Breaker Sodium persulphate 7775-27-1 100 0.0029 N/A
Nitrogen Baker Hughes Energizing Fluid Nitrogen 7727-37-9 100 0.4729 N/A
MaxPerm-20A Baker Hughes Friction Reducer Non-hazardous 9014 100 0.1302 N/A
Oxyalkylated alcohol 9014 100 0.1302 N/A
Petroleum distillates 64742-47-8 100 0.1302 N/A
Polyacrylate 9014 100 0.1302 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-04-10 2015-06-06 Recycled Fracturing Water (treated at well site) 1033
2015-07-02 2015-07-18 Recycled Fracturing Water (treated at well site) 1306
2015-07-09 2015-07-16 Surface Water - Runoff 4456
2015-07-03 2015-07-19 Surface Water - Runoff 428

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 2973 0.0 0.0 0.0
2016 8651 0.0 0.0 0.0
2017 8604 0.0 0.0 0.0
2018 8197 0.0 0.0 0.0
2019 8418 0.0 0.0 0.0
2020 2172 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-05-18 No Incident Encountered 0.00 0.00
2015-08-03 No Incident Encountered 0.00 0.00

For data sources see[10]

References