X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786123511000

Well Details

Well ID: 0786123511000
Loading map...
Location: 00/11-35-078-12W6/0
Location Alias: 00/11-35-78-12 W6M
Location Alias 2: 00/11-35-078-12 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 12
Section: 35
County/Municipality: Saddle Hills County
Well Name: BIR PCOUPES 11-35-78-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0453610
License Date: 2013-01-15
License Status: Amended
Spud Date: 2013-04-15
Final Drill Date: 2013-05-01
Well Total Depth: 5083.00 m
Surface Hole Latitude: 55.784838
Surface Hole Longitude: -119.713593

For data sources see[1][2]

Well History

Date Event
2013-01-15 Obtained License
2013-04-16 Surface Casing Operation Performed
2013-04-18 Direction Drilling Operation Performed - Deviate
2013-04-22 Direction Drilling Operation Performed - Horizontal
2013-04-23 Intermediate Casing Operation Performed
2013-05-01 Finished Drilling
2013-05-01 Well Mode changed to Drilled and Cased
2013-05-03 Liner Casing Operation Performed
2013-05-04 Perforation Treatment Performed - Open-Hole Completion
2013-05-04 Rig Released
2013-07-22 Well Log Performed
2013-08-06 Perforation Treatment Performed - Multi-Stage Fracture
2013-08-07 Perforation Treatment Performed - Multi-Stage Fracture
2013-10-26 Well Began Production
2013-10-26 Well Fluid changed to Crude Oil
2013-10-26 Well Mode changed to Flowing
2018-07-23 Well Fluid changed to Crude Oil
2018-07-23 Well Mode changed to Gas Lift
2019-05-31 Well Fluid changed to Crude Oil
2019-05-31 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-04-15 Trinidad Drilling Ltd. 45 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-04-18 1959.00 Deviate (5 - 79 degrees)
2013-04-22 2235.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-05-04 Open Hole/Barefoot Completion 5063.00 5083.00 0
2013-08-06 Multi-Stage Fracture 4082.10 4083.40 0
2013-08-06 Multi-Stage Fracture 3967.70 3969.00 0
2013-08-06 Multi-Stage Fracture 3853.20 3854.50 0
2013-08-07 Multi-Stage Fracture 3738.70 3740.00 0
2013-08-07 Multi-Stage Fracture 3624.40 3625.60 0
2013-08-07 Multi-Stage Fracture 3510.00 3511.20 0
2013-08-07 Multi-Stage Fracture 3395.70 3397.00 0
2013-08-07 Multi-Stage Fracture 3281.20 3282.40 0
2013-08-07 Multi-Stage Fracture 3166.70 3168.00 0
2013-08-07 Multi-Stage Fracture 3052.30 3053.50 0
2013-08-06 Multi-Stage Fracture 4997.00 5012.10 0
2013-08-07 Multi-Stage Fracture 2937.70 2938.90 0
2013-08-07 Multi-Stage Fracture 2823.20 2824.40 0
2013-08-07 Multi-Stage Fracture 2708.80 2710.00 0
2013-08-07 Multi-Stage Fracture 2594.30 2595.60 0
2013-08-07 Multi-Stage Fracture 2479.80 2481.10 0
2013-08-07 Multi-Stage Fracture 2365.50 2366.70 0
2013-08-06 Multi-Stage Fracture 4885.30 4886.50 0
2013-08-06 Multi-Stage Fracture 4772.10 4773.30 0
2013-08-06 Multi-Stage Fracture 4659.30 4660.60 0
2013-08-06 Multi-Stage Fracture 4545.60 4546.90 0
2013-08-06 Multi-Stage Fracture 4432.70 4433.90 0
2013-08-06 Multi-Stage Fracture 4310.90 4312.20 0
2013-08-06 Multi-Stage Fracture 4196.60 4197.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-08-06 2013-08-07 2,171 9,743 N/A
2 2013-08-06 2013-08-06 2,171 506 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 80.459 N/A
Sand (30/50) Trican silica crystalline 14808-60-7 100 15.3181 N/A
Sand (40/70) Trican silica crystalline 14808-60-7 100 4.1498 N/A
2 Water Not Available 100 83.1446 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-08-06 2013-08-07 Surface Water - River 10207

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 717 0.0 0.0 0.0
2014 7714 0.0 0.0 0.0
2015 8497 0.0 0.0 0.0
2016 8502 0.0 0.0 0.0
2017 8196 0.0 0.0 0.0
2018 8204 0.0 0.0 0.0
2019 8681 0.0 0.0 0.0
2020 2102 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-05-04 No Incident Encountered 0.00 0.00
2013-08-18 No Incident Encountered 0.00 0.00

For data sources see[10]

References