X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786122806000

Well Details

Well ID: 0786122806000
Loading map...
Location: 00/06-28-078-12W6/0
Location Alias: 00/06-28-78-12 W6M
Location Alias 2: 00/06-28-078-12 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 12
Section: 28
County/Municipality: Saddle Hills County
Well Name: BIR 10-31 HZ PCOUPES 6-28-78-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0487238
License Date: 2017-12-15
License Status: Issued
Spud Date: 2018-01-07
Final Drill Date: 2018-01-21
Well Total Depth: 5412.00 m
Surface Hole Latitude: 55.804869
Surface Hole Longitude: -119.843905

For data sources see[1][2]

Well History

Date Event
2017-12-15 Obtained License
2018-01-08 Surface Casing Operation Performed
2018-01-10 Direction Drilling Operation Performed - Deviate
2018-01-14 Direction Drilling Operation Performed - Horizontal
2018-01-18 Kick Occurred
2018-01-21 Finished Drilling
2018-01-21 Well Log Performed
2018-01-21 Well Mode changed to Drilled and Cased
2018-01-22 Production Casing Operation Performed
2018-01-22 Well Log Performed
2018-01-23 Kick Occurred
2018-01-24 Rig Released
2018-03-24 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-24 Perforation Treatment Performed - Open-Hole Completion
2018-03-25 Perforation Treatment Performed - Multi-Stage Fracture
2018-03-26 Perforation Treatment Performed - Multi-Stage Fracture
2018-04-01 Well Fluid changed to Gas
2018-04-01 Well Mode changed to Testing
2018-04-08 Well Began Production
2018-04-08 Well Fluid changed to Gas
2018-04-08 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-01-07 Trinidad Drilling Ltd. 438 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-01-10 833.50 Deviate (5 - 79 degrees)
2018-01-14 2247.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-03-24 Open Hole/Barefoot Completion 5409.00 5412.00 0
2018-03-24 Multi-Stage Fracture 4857.40 4858.30 0
2018-03-24 Multi-Stage Fracture 4775.70 4776.60 0
2018-03-24 Multi-Stage Fracture 4706.30 4707.20 0
2018-03-24 Multi-Stage Fracture 4635.80 4636.70 0
2018-03-24 Multi-Stage Fracture 4565.50 4566.40 0
2018-03-24 Multi-Stage Fracture 4494.80 4495.70 0
2018-03-24 Multi-Stage Fracture 4423.40 4424.30 0
2018-03-24 Multi-Stage Fracture 4353.40 4354.30 0
2018-03-24 Multi-Stage Fracture 4283.20 4284.10 0
2018-03-24 Multi-Stage Fracture 4212.30 4213.20 0
2018-03-24 Multi-Stage Fracture 5397.70 5399.00 0
2018-03-24 Multi-Stage Fracture 4141.90 4142.80 0
2018-03-25 Multi-Stage Fracture 4071.30 4072.20 0
2018-03-25 Multi-Stage Fracture 4000.60 4001.50 0
2018-03-25 Multi-Stage Fracture 3929.50 3930.40 0
2018-03-25 Multi-Stage Fracture 3858.80 3859.70 0
2018-03-25 Multi-Stage Fracture 3788.10 3789.00 0
2018-03-25 Multi-Stage Fracture 3705.90 3706.80 0
2018-03-25 Multi-Stage Fracture 3636.50 3637.40 0
2018-03-25 Multi-Stage Fracture 3566.60 3567.50 0
2018-03-25 Multi-Stage Fracture 3496.20 3497.10 0
2018-03-24 Multi-Stage Fracture 5344.10 5345.00 0
2018-03-25 Multi-Stage Fracture 3425.90 3426.80 0
2018-03-25 Multi-Stage Fracture 3355.60 3356.50 0
2018-03-25 Multi-Stage Fracture 3285.20 3286.10 0
2018-03-25 Multi-Stage Fracture 3214.90 3215.80 0
2018-03-25 Multi-Stage Fracture 3144.30 3145.20 0
2018-03-25 Multi-Stage Fracture 3073.80 3074.70 0
2018-03-25 Multi-Stage Fracture 3002.90 3003.80 0
2018-03-25 Multi-Stage Fracture 2932.10 2933.00 0
2018-03-26 Multi-Stage Fracture 2861.00 2861.90 0
2018-03-26 Multi-Stage Fracture 2790.10 2791.00 0
2018-03-24 Multi-Stage Fracture 5274.40 5275.30 0
2018-03-26 Multi-Stage Fracture 2648.70 2649.60 0
2018-03-26 Multi-Stage Fracture 2578.10 2579.00 0
2018-03-26 Multi-Stage Fracture 2507.10 2508.00 0
2018-03-26 Multi-Stage Fracture 2436.40 2437.30 0
2018-03-26 Multi-Stage Fracture 2365.60 2366.50 0
2018-03-26 Multi-Stage Fracture 2317.80 2318.70 0
2018-03-24 Multi-Stage Fracture 5204.90 5205.80 0
2018-03-24 Multi-Stage Fracture 5135.00 5135.90 0
2018-03-24 Multi-Stage Fracture 5065.60 5066.50 0
2018-03-24 Multi-Stage Fracture 4995.70 4996.60 0
2018-03-24 Multi-Stage Fracture 4927.10 4928.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-03-24 2018-03-26 2,169 17,541 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 84.064 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 9.5101 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 6.3371 N/A
SaniFrac 8844 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0104 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0104 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0104 N/A
Polyethylene glycol 25322-68-3 100 0.0104 N/A
Sodium bromide 7647-15-6 100 0.0104 N/A
DynaRate 6104 Calfrac Friction Reducer Ammonium Chloride 12125-02-9 100 0.0781 N/A
Hydrotreated Kerosene 64742-47-8 100 0.0781 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0781 N/A
Oleamide Trade Secret 100 0.0781 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-03-20 2018-03-30 Recycled Fracturing Water (treated at well site) 1961
2018-03-26 2018-03-27 Surface Water - Runoff 314
2018-03-21 2018-03-22 Surface Water - Runoff 2301
2018-03-22 2018-03-23 Surface Water - Runoff 1892
2018-03-24 2018-03-25 Surface Water - Runoff 1898
2018-03-23 2018-03-24 Surface Water - Runoff 2737
2018-03-25 2018-03-28 Surface Water - Runoff 2335
2018-03-26 2018-03-27 Surface Water - Runoff 1559
2018-03-28 2018-03-29 Surface Water - Runoff 2201
2018-03-28 2018-03-29 Surface Water - Runoff 308

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 5787 0.0 0.0 0.0
2019 7909 0.0 0.0 0.0
2020 1961 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-01-18 Kick 4012.00 4012.00
2018-01-23 Kick 3233.00 3233.00
2018-04-19 No Incident Encountered 0.00 0.00

For data sources see[10]

References