If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786122805000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.804869,"lon":-119.844224,"icon":""}]} |
Location: 00/05-28-078-12W6/0 | |
Location Alias: 00/05-28-78-12 W6M | |
Location Alias 2: 00/05-28-078-12 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 12 | |
Section: 28 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 10-31 HZ PCOUPES 5-28-78-12 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0487237 | |
License Date: 2017-12-15 | |
License Status: Issued | |
Spud Date: 2018-01-03 | |
Final Drill Date: 2018-02-17 | |
Well Total Depth: 5486.00 m | |
Surface Hole Latitude: 55.804869 | |
Surface Hole Longitude: -119.844224 |
Date | Event |
---|---|
2017-12-15 | Obtained License |
2018-01-04 | Surface Casing Operation Performed |
2018-02-07 | Direction Drilling Operation Performed - Deviate |
2018-02-11 | Direction Drilling Operation Performed - Horizontal |
2018-02-15 | Kick Occurred |
2018-02-17 | Finished Drilling |
2018-02-17 | Well Log Performed |
2018-02-17 | Well Mode changed to Drilled and Cased |
2018-02-18 | Well Log Performed |
2018-02-19 | Production Casing Operation Performed |
2018-02-21 | Rig Released |
2018-03-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-21 | Perforation Treatment Performed - Open-Hole Completion |
2018-03-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-03-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2018-04-01 | Well Fluid changed to Gas |
2018-04-01 | Well Mode changed to Testing |
2018-04-02 | Well Began Production |
2018-04-02 | Well Fluid changed to Gas |
2018-04-02 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-01-03 | Trinidad Drilling Ltd. | 438 | N/A | Set Surface |
2018-02-07 | Trinidad Drilling Ltd. | 438 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-02-07 | 725.40 | Deviate (5 - 79 degrees) |
2018-02-11 | 2352.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-03-21 | Open Hole/Barefoot Completion | 5463.00 | 5466.00 | 0 |
2018-03-22 | Multi-Stage Fracture | 4901.80 | 4902.70 | 0 |
2018-03-22 | Multi-Stage Fracture | 4830.80 | 4831.70 | 0 |
2018-03-22 | Multi-Stage Fracture | 4760.80 | 4761.70 | 0 |
2018-03-22 | Multi-Stage Fracture | 4690.40 | 4691.30 | 0 |
2018-03-22 | Multi-Stage Fracture | 4619.80 | 4620.70 | 0 |
2018-03-22 | Multi-Stage Fracture | 4549.00 | 4549.90 | 0 |
2018-03-22 | Multi-Stage Fracture | 4478.00 | 4478.90 | 0 |
2018-03-22 | Multi-Stage Fracture | 4407.50 | 4408.40 | 0 |
2018-03-22 | Multi-Stage Fracture | 4337.20 | 4338.10 | 0 |
2018-03-22 | Multi-Stage Fracture | 4266.50 | 4267.40 | 0 |
2018-03-21 | Multi-Stage Fracture | 5450.90 | 5452.20 | 0 |
2018-03-22 | Multi-Stage Fracture | 4196.50 | 4197.40 | 0 |
2018-03-22 | Multi-Stage Fracture | 4126.10 | 4127.00 | 0 |
2018-03-22 | Multi-Stage Fracture | 4055.40 | 4056.30 | 0 |
2018-03-22 | Multi-Stage Fracture | 3973.30 | 3974.20 | 0 |
2018-03-22 | Multi-Stage Fracture | 3902.70 | 3903.60 | 0 |
2018-03-23 | Multi-Stage Fracture | 3832.50 | 3833.40 | 0 |
2018-03-23 | Multi-Stage Fracture | 3762.10 | 3763.00 | 0 |
2018-03-23 | Multi-Stage Fracture | 3691.20 | 3692.10 | 0 |
2018-03-23 | Multi-Stage Fracture | 3620.90 | 3621.80 | 0 |
2018-03-23 | Multi-Stage Fracture | 3550.40 | 3551.30 | 0 |
2018-03-21 | Multi-Stage Fracture | 5397.80 | 5398.70 | 0 |
2018-03-23 | Multi-Stage Fracture | 3479.90 | 3480.80 | 0 |
2018-03-23 | Multi-Stage Fracture | 3409.00 | 3409.90 | 0 |
2018-03-23 | Multi-Stage Fracture | 3338.50 | 3339.40 | 0 |
2018-03-23 | Multi-Stage Fracture | 3267.70 | 3268.60 | 0 |
2018-03-23 | Multi-Stage Fracture | 3197.00 | 3197.90 | 0 |
2018-03-23 | Multi-Stage Fracture | 3126.50 | 3127.40 | 0 |
2018-03-23 | Multi-Stage Fracture | 3055.00 | 3055.90 | 0 |
2018-03-23 | Multi-Stage Fracture | 2984.50 | 2985.40 | 0 |
2018-03-23 | Multi-Stage Fracture | 2913.90 | 2914.80 | 0 |
2018-03-23 | Multi-Stage Fracture | 2843.10 | 2844.00 | 0 |
2018-03-21 | Multi-Stage Fracture | 5326.50 | 5327.40 | 0 |
2018-03-23 | Multi-Stage Fracture | 2772.50 | 2773.40 | 0 |
2018-03-23 | Multi-Stage Fracture | 2702.00 | 2702.90 | 0 |
2018-03-23 | Multi-Stage Fracture | 2631.70 | 2632.60 | 0 |
2018-03-23 | Multi-Stage Fracture | 2561.30 | 2562.20 | 0 |
2018-03-23 | Multi-Stage Fracture | 2479.50 | 2480.40 | 0 |
2018-03-23 | Multi-Stage Fracture | 2408.60 | 2409.50 | 0 |
2018-03-23 | Multi-Stage Fracture | 2361.00 | 2361.90 | 0 |
2018-03-21 | Multi-Stage Fracture | 5255.50 | 5256.40 | 0 |
2018-03-21 | Multi-Stage Fracture | 5185.10 | 5186.00 | 0 |
2018-03-22 | Multi-Stage Fracture | 5114.40 | 5115.30 | 0 |
2018-03-22 | Multi-Stage Fracture | 5043.30 | 5044.20 | 0 |
2018-03-22 | Multi-Stage Fracture | 4972.40 | 4973.30 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-03-21 | 2018-03-23 | 2,184 | 18,297 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 84.2963 | N/A | |||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 9.3715 | N/A | ||
40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 6.2477 | N/A | ||
SaniFrac 8844 | Calfrac | Bactericide/Biocide | Acetamide. 2.2-dibromo-2-cyano | 10222-01-2 | 100 | 0.0107 | N/A | |
Acetonitrile. 2.2-dibromo | 3252-43-5 | 100 | 0.0107 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0107 | N/A | ||||
Polyethylene glycol | 25322-68-3 | 100 | 0.0107 | N/A | ||||
Sodium bromide | 7647-15-6 | 100 | 0.0107 | N/A | ||||
DynaRate 6104 | Calfrac | Friction Reducer | Ammonium Chloride | 12125-02-9 | 100 | 0.0735 | N/A | |
Hydrotreated Kerosene | 64742-47-8 | 100 | 0.0735 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0735 | N/A | ||||
Oleamide | Trade Secret | 100 | 0.0735 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-03-20 | 2018-03-30 | Recycled Fracturing Water (treated at well site) | 1961 |
2018-03-26 | 2018-03-27 | Surface Water - Runoff | 314 |
2018-03-21 | 2018-03-22 | Surface Water - Runoff | 2301 |
2018-03-22 | 2018-03-23 | Surface Water - Runoff | 1892 |
2018-03-24 | 2018-03-25 | Surface Water - Runoff | 1898 |
2018-03-23 | 2018-03-24 | Surface Water - Runoff | 2737 |
2018-03-25 | 2018-03-28 | Surface Water - Runoff | 2335 |
2018-03-26 | 2018-03-27 | Surface Water - Runoff | 1559 |
2018-03-28 | 2018-03-29 | Surface Water - Runoff | 2201 |
2018-03-28 | 2018-03-29 | Surface Water - Runoff | 308 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 5813 | 0.0 | 0.0 | 0.0 |
2019 | 8463 | 0.0 | 0.0 | 0.0 |
2020 | 1823 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-02-15 | Kick | 4410.00 | 4410.00 |
2018-04-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]