X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786122709022

Well Details

Well ID: 0786122709022
Loading map...
Location: 02/09-27-078-12W6/2
Location Alias: 02/09-27-78-12 W6M
Location Alias 2: 02/09-27-078-12 W6/02
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 12
Section: 27
County/Municipality: Saddle Hills County
Well Name: BIR PCOUPES 10-33-78-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0469158
License Date: 2014-08-15
License Status: Amended
Spud Date: 2014-09-12
Final Drill Date: 2014-10-05
Well Total Depth: 4791.00 m
Surface Hole Latitude: 55.803068
Surface Hole Longitude: -119.794795

For data sources see[1][2]

Well History

Date Event
2014-08-15 Obtained License
2014-09-12 Direction Drilling Operation Performed - Deviate
2014-09-13 Surface Casing Operation Performed
2014-09-23 Direction Drilling Operation Performed - Horizontal
2014-10-05 Finished Drilling
2014-10-05 Well Log Performed
2014-10-05 Well Mode changed to Drilled and Cased
2014-10-11 Perforation Treatment Performed - Open-Hole Completion
2014-10-11 Production Casing Operation Performed
2014-10-11 Rig Released
2015-01-24 Perforation Treatment Performed - Multi-Stage Fracture
2015-01-25 Perforation Treatment Performed - Fractured
2015-01-25 Perforation Treatment Performed - Jet Perforation
2015-01-25 Perforation Treatment Performed - Multi-Stage Fracture
2015-01-26 Perforation Treatment Performed - Fractured
2015-01-26 Perforation Treatment Performed - Jet Perforation
2015-01-27 Perforation Treatment Performed - Fractured
2015-01-27 Perforation Treatment Performed - Jet Perforation
2015-01-28 Perforation Treatment Performed - Fractured
2015-01-28 Perforation Treatment Performed - Jet Perforation
2015-01-29 Perforation Treatment Performed - Fractured
2015-01-29 Perforation Treatment Performed - Jet Perforation
2015-01-30 Perforation Treatment Performed - Fractured
2015-01-30 Perforation Treatment Performed - Jet Perforation
2015-01-31 Perforation Treatment Performed - Fractured
2015-01-31 Perforation Treatment Performed - Jet Perforation
2015-02-01 Perforation Treatment Performed - Fractured
2015-02-01 Perforation Treatment Performed - Jet Perforation
2015-02-02 Perforation Treatment Performed - Jet Perforation
2015-04-21 Well Began Production
2015-04-21 Well Fluid changed to Crude Oil
2015-04-21 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2014-09-12 287.00 Deviate (5 - 79 degrees)
2014-09-23 1810.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-10-11 Open Hole/Barefoot Completion 4780.00 4791.00 0
2015-01-25 Perforation 4201.00 4201.50 3
2015-01-31 Perforation 2702.00 2702.50 3
2015-01-31 Perforation 2682.00 2682.50 3
2015-01-31 Fracture 2682.00 2762.50 0
2015-02-01 Perforation 2662.00 2662.50 3
2015-02-01 Perforation 2642.00 2642.50 3
2015-02-01 Perforation 2622.00 2622.50 3
2015-02-01 Perforation 2602.00 2602.50 3
2015-02-01 Perforation 2582.00 2582.50 3
2015-02-01 Fracture 2582.00 2662.50 0
2015-02-01 Perforation 2562.00 2562.50 3
2015-01-25 Perforation 4181.00 4181.50 3
2015-02-01 Perforation 2542.00 2542.50 3
2015-02-01 Perforation 2522.00 2522.50 3
2015-02-01 Perforation 2502.00 2502.50 3
2015-02-01 Perforation 2481.00 2481.50 3
2015-02-01 Fracture 2481.00 2562.50 0
2015-02-01 Perforation 2462.00 2462.50 3
2015-02-01 Perforation 2442.00 2442.50 3
2015-02-01 Perforation 2422.00 2422.50 3
2015-02-01 Perforation 2401.00 2401.50 3
2015-02-01 Perforation 2382.00 2382.50 3
2015-01-25 Perforation 4161.00 4161.50 3
2015-02-01 Fracture 2382.00 2462.50 0
2015-02-02 Perforation 2162.00 2162.70 15
2015-01-25 Fracture 4161.00 4221.50 0
2015-01-26 Perforation 4141.00 4141.50 3
2015-01-26 Perforation 4121.00 4121.50 3
2015-01-26 Perforation 4101.00 4101.50 3
2015-01-26 Perforation 4081.00 4081.50 3
2015-01-26 Fracture 4081.00 4141.50 0
2015-01-27 Perforation 4061.00 4061.50 3
2015-01-24 Multi-Stage Fracture 4723.50 4737.80 0
2015-01-27 Perforation 4041.00 4041.50 3
2015-01-27 Perforation 4021.00 4021.50 3
2015-01-27 Perforation 4001.00 4001.50 3
2015-01-27 Perforation 3981.00 3981.50 3
2015-01-27 Fracture 3981.00 4061.50 0
2015-01-28 Perforation 3961.00 3961.50 3
2015-01-28 Perforation 3941.00 3941.50 3
2015-01-28 Perforation 3921.00 3921.50 3
2015-01-28 Perforation 3901.00 3901.50 3
2015-01-28 Perforation 3881.00 3881.50 3
2015-01-24 Multi-Stage Fracture 4646.40 4704.40 0
2015-01-28 Fracture 3881.00 3961.50 0
2015-01-28 Perforation 3861.00 3861.50 3
2015-01-28 Perforation 3841.00 3841.50 3
2015-01-28 Perforation 3821.00 3821.50 3
2015-01-28 Perforation 3801.00 3801.50 3
2015-01-28 Perforation 3781.00 3781.50 3
2015-01-28 Fracture 3781.00 3861.50 0
2015-01-28 Perforation 3761.00 3761.50 3
2015-01-28 Perforation 3741.00 3741.50 3
2015-01-28 Perforation 3721.00 3721.50 3
2015-01-24 Multi-Stage Fracture 4568.70 4646.40 0
2015-01-28 Perforation 3701.00 3701.50 3
2015-01-28 Perforation 3681.00 3681.50 3
2015-01-29 Fracture 3681.00 3761.50 0
2015-01-29 Perforation 3661.00 3661.50 3
2015-01-29 Perforation 3641.00 3641.50 3
2015-01-29 Perforation 3621.00 3621.50 3
2015-01-29 Perforation 3601.00 3601.50 3
2015-01-29 Perforation 3581.00 3581.50 3
2015-01-29 Fracture 3581.00 3661.50 0
2015-01-29 Perforation 3561.00 3561.50 3
2015-01-24 Multi-Stage Fracture 4491.30 4549.80 0
2015-01-29 Perforation 3541.00 3541.50 3
2015-01-29 Perforation 3521.00 3521.50 3
2015-01-29 Perforation 3501.00 3501.50 3
2015-01-29 Perforation 3481.00 3481.50 3
2015-01-29 Fracture 3481.00 3561.50 0
2015-01-30 Perforation 3461.00 3461.50 3
2015-01-30 Perforation 3441.00 3441.50 3
2015-01-30 Perforation 3421.00 3441.50 3
2015-01-30 Perforation 3401.00 3401.50 3
2015-01-30 Perforation 3381.00 3381.50 3
2015-01-24 Multi-Stage Fracture 4414.50 4472.50 0
2015-01-30 Fracture 3381.00 3461.50 0
2015-01-30 Perforation 3361.00 3361.50 3
2015-01-30 Perforation 3342.00 3342.50 3
2015-01-30 Perforation 3322.00 3322.50 3
2015-01-30 Perforation 3302.00 3302.50 3
2015-01-30 Perforation 3282.00 3282.50 3
2015-01-30 Fracture 3282.00 3361.50 0
2015-01-30 Perforation 3262.00 3262.50 3
2015-01-30 Perforation 3242.00 3242.50 3
2015-01-30 Perforation 3222.00 3222.50 3
2015-01-24 Multi-Stage Fracture 4337.10 4395.10 0
2015-01-30 Perforation 3202.00 3202.50 3
2015-01-30 Perforation 3182.00 3182.50 3
2015-01-30 Fracture 3182.00 3262.50 0
2015-01-30 Perforation 3162.00 3162.50 3
2015-01-30 Perforation 3142.00 3142.50 3
2015-01-30 Perforation 3122.00 3122.50 3
2015-01-30 Perforation 3102.00 3102.50 3
2015-01-30 Perforation 3082.00 3082.50 3
2015-01-30 Fracture 3082.00 3162.50 0
2015-01-31 Perforation 3062.00 3062.50 3
2015-01-25 Multi-Stage Fracture 4240.90 4318.40 0
2015-01-31 Perforation 3042.00 3042.50 3
2015-01-31 Perforation 3022.00 3022.50 3
2015-01-31 Perforation 3003.00 3003.50 3
2015-01-31 Perforation 2982.00 2982.50 3
2015-01-31 Fracture 2982.00 3062.50 0
2015-01-31 Perforation 2961.00 2961.50 3
2015-01-31 Perforation 2942.00 2942.50 3
2015-01-31 Perforation 2922.00 2922.50 3
2015-01-31 Perforation 2902.00 2902.50 3
2015-01-31 Perforation 2882.00 2882.50 3
2015-01-25 Perforation 4221.00 4221.50 3
2015-01-31 Fracture 2882.00 2961.50 0
2015-01-31 Perforation 2862.00 2862.50 3
2015-01-31 Perforation 2842.00 2842.50 3
2015-01-31 Perforation 2822.00 2822.50 3
2015-01-31 Perforation 2802.00 2802.50 3
2015-01-31 Perforation 2781.00 2781.50 3
2015-01-31 Fracture 2781.00 2862.50 0
2015-01-31 Perforation 2762.00 2762.50 3
2015-01-31 Perforation 2742.00 2742.50 3
2015-01-31 Perforation 2722.00 2722.50 3

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-01-24 2015-02-01 2,158 130 N/A
2 2015-01-25 2015-02-01 2,158 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric acid 7647-01-0 100 0.7562 N/A
Lease Water Not Available 100 83.5007 N/A
Water 7732-18-5 100 0.7562 N/A
SAND - PREMIUM WHITE Halliburton Crystalline silica. quartz 14808-60-7 100 12.3509 N/A
SSA-2 Halliburton Crystalline silica. quartz 14808-60-7 100 3.3262 N/A
FR-66 Halliburton Friction Reducer Ammonium chloride 12125-02-9 100 0.0655 N/A
Hydrotreated light petroleum distillate 64742-47-8 100 0.0655 N/A
Inert ingredient(s) Not Available 100 0.0655 N/A
Proprietary ingredient(s) Trade Secret 100 0.0657 N/A
Sodium chloride 7647-14-5 100 0.0655 N/A
2 AP Breaker Halliburton Breaker Ammonium persulfate 7727-54-0 100 0.0003 N/A
LGC-36 UC Halliburton Gelling Agent Naphtha. hydrotreated heavy 64742-48-9 100 0.0468 N/A
Proprietary ingredient(s) Trade Secret 100 0.0468 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-02-02 2015-02-02 Surface Water - Runoff 7754
2015-02-02 2015-02-02 Surface Water - Runoff 7754

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 4185 0.0 0.0 0.0
2016 8635 0.0 0.0 0.0
2017 8284 0.0 0.0 0.0
2018 8522 0.0 0.0 0.0
2019 8503 0.0 0.0 0.0
2020 2114 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-10-11 No Incident Encountered 0.00 0.00
2015-02-02 No Incident Encountered 0.00 0.00

For data sources see[9]

References