If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786122708000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.772627,"lon":-119.732989,"icon":""}]} |
Location: 00/08-27-078-12W6/0 | |
Location Alias: 00/08-27-78-12 W6M | |
Location Alias 2: 00/08-27-078-12 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 12 | |
Section: 27 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR PCOUPES 8-27-78-12 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0462865 | |
License Date: 2013-12-20 | |
License Status: Issued | |
Spud Date: 2014-02-26 | |
Final Drill Date: 2014-03-15 | |
Well Total Depth: 4917.00 m | |
Surface Hole Latitude: 55.772627 | |
Surface Hole Longitude: -119.732989 |
Date | Event |
---|---|
2013-12-20 | Obtained License |
2014-02-26 | Direction Drilling Operation Performed - Deviate |
2014-02-27 | Surface Casing Operation Performed |
2014-03-07 | Direction Drilling Operation Performed - Horizontal |
2014-03-08 | Intermediate Casing Operation Performed |
2014-03-15 | Finished Drilling |
2014-03-15 | Well Mode changed to Drilled and Cased |
2014-03-16 | Liner Casing Operation Performed |
2014-03-16 | Perforation Treatment Performed - Open-Hole Completion |
2014-03-18 | Rig Released |
2014-04-17 | Well Log Performed |
2014-04-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-04-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-04-29 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-06-29 | Well Began Production |
2014-06-29 | Well Fluid changed to Crude Oil |
2014-06-29 | Well Mode changed to Flowing |
2019-02-19 | Well Fluid changed to Crude Oil |
2019-02-19 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-02-26 | Precision Drilling Corporation | 534 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-02-26 | 207.00 | Deviate (5 - 79 degrees) |
2014-03-07 | 2336.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-03-16 | Open Hole/Barefoot Completion | 4905.00 | 4917.00 | 0 |
2014-04-28 | Multi-Stage Fracture | 4211.80 | 4213.00 | 0 |
2014-04-28 | Multi-Stage Fracture | 4140.20 | 4141.40 | 0 |
2014-04-28 | Multi-Stage Fracture | 4057.10 | 4058.40 | 0 |
2014-04-28 | Multi-Stage Fracture | 3985.10 | 3986.30 | 0 |
2014-04-28 | Multi-Stage Fracture | 3900.20 | 3901.40 | 0 |
2014-04-28 | Multi-Stage Fracture | 3815.70 | 3816.90 | 0 |
2014-04-28 | Multi-Stage Fracture | 3745.20 | 3746.40 | 0 |
2014-04-28 | Multi-Stage Fracture | 3662.70 | 3663.90 | 0 |
2014-04-28 | Multi-Stage Fracture | 3580.80 | 3582.10 | 0 |
2014-04-28 | Multi-Stage Fracture | 3498.30 | 3499.60 | 0 |
2014-04-27 | Multi-Stage Fracture | 4852.40 | 4868.10 | 0 |
2014-04-28 | Multi-Stage Fracture | 3414.80 | 3416.10 | 0 |
2014-04-28 | Multi-Stage Fracture | 3345.50 | 3346.80 | 0 |
2014-04-29 | Multi-Stage Fracture | 3262.70 | 3263.90 | 0 |
2014-04-29 | Multi-Stage Fracture | 3178.60 | 3179.90 | 0 |
2014-04-29 | Multi-Stage Fracture | 3107.80 | 3109.00 | 0 |
2014-04-29 | Multi-Stage Fracture | 3025.10 | 3026.30 | 0 |
2014-04-29 | Multi-Stage Fracture | 2945.40 | 2946.60 | 0 |
2014-04-29 | Multi-Stage Fracture | 2861.80 | 2863.00 | 0 |
2014-04-29 | Multi-Stage Fracture | 2782.50 | 2783.70 | 0 |
2014-04-29 | Multi-Stage Fracture | 2706.20 | 2707.40 | 0 |
2014-04-27 | Multi-Stage Fracture | 4779.50 | 4780.70 | 0 |
2014-04-29 | Multi-Stage Fracture | 2623.70 | 2624.90 | 0 |
2014-04-29 | Multi-Stage Fracture | 2540.40 | 2541.60 | 0 |
2014-04-29 | Multi-Stage Fracture | 2471.40 | 2472.60 | 0 |
2014-04-27 | Multi-Stage Fracture | 4694.30 | 4695.60 | 0 |
2014-04-27 | Multi-Stage Fracture | 4621.40 | 4622.60 | 0 |
2014-04-27 | Multi-Stage Fracture | 4535.90 | 4537.20 | 0 |
2014-04-27 | Multi-Stage Fracture | 4462.90 | 4464.20 | 0 |
2014-04-27 | Multi-Stage Fracture | 4377.60 | 4378.90 | 0 |
2014-04-27 | Multi-Stage Fracture | 4294.40 | 4295.60 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-04-27 | 2014-04-29 | 2,226 | 11,798 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | 7732-18-5 | 100 | 78.5851 | N/A | |||
Garnet 30/50 | encana | polyurethane resin | Not Available | 100 | 5.5525 | N/A | ||
silica crystalline | 14808-60-7 | 100 | 5.5525 | N/A | ||||
Sand 30/50 | encana | silica crystalline | 14808-60-7 | 100 | 15.8071 | N/A | ||
ASPEN-FR-27 | Aspen Polymers | Friction Reducer | Ethylene Glycol | 107-21-1 | 100 | 0.0016 | N/A | |
Non-Hazardous | Not Available | 100 | 0.0534 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-04-27 | 2014-04-27 | Surface Water - Runoff | 12055 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 2310 | 0.0 | 0.0 | 0.0 |
2015 | 8439 | 0.0 | 0.0 | 0.0 |
2016 | 8469 | 0.0 | 0.0 | 0.0 |
2017 | 8216 | 0.0 | 0.0 | 0.0 |
2018 | 8388 | 0.0 | 0.0 | 0.0 |
2019 | 8571 | 0.0 | 0.0 | 0.0 |
2020 | 2160 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-03-18 | No Incident Encountered | 0.00 | 0.00 |
2014-04-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]