X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786122613030

Well Details

Well ID: 0786122613030
Loading map...
Location: 03/13-26-078-12W6/0
Location Alias: 03/13-26-78-12 W6M
Location Alias 2: 03/13-26-078-12 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 12
Section: 26
County/Municipality: Saddle Hills County
Well Name: BIR 103 PCOUPES 13-26-78-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0469161
License Date: 2014-08-15
License Status: Issued
Spud Date: 2014-11-18
Final Drill Date: 2014-12-01
Well Total Depth: 4890.00 m
Surface Hole Latitude: 55.802894
Surface Hole Longitude: -119.794430

For data sources see[1][2]

Well History

Date Event
2014-08-15 Obtained License
2014-11-18 Direction Drilling Operation Performed - Deviate
2014-11-19 Surface Casing Operation Performed
2014-11-25 Direction Drilling Operation Performed - Horizontal
2014-11-26 Well Log Performed
2014-12-01 Finished Drilling
2014-12-01 Well Log Performed
2014-12-01 Well Mode changed to Drilled and Cased
2014-12-03 Production Casing Operation Performed
2014-12-04 Perforation Treatment Performed - Open-Hole Completion
2014-12-04 Rig Released
2015-01-13 Perforation Treatment Performed - Multi-Stage Fracture
2015-01-14 Perforation Treatment Performed - Fractured
2015-01-14 Perforation Treatment Performed - Jet Perforation
2015-01-14 Perforation Treatment Performed - Multi-Stage Fracture
2015-01-15 Perforation Treatment Performed - Fractured
2015-01-15 Perforation Treatment Performed - Jet Perforation
2015-01-16 Perforation Treatment Performed - Fractured
2015-01-16 Perforation Treatment Performed - Jet Perforation
2015-01-17 Perforation Treatment Performed - Fractured
2015-01-17 Perforation Treatment Performed - Jet Perforation
2015-01-18 Perforation Treatment Performed - Fractured
2015-01-18 Perforation Treatment Performed - Jet Perforation
2015-01-19 Perforation Treatment Performed - Fractured
2015-01-19 Perforation Treatment Performed - Jet Perforation
2015-01-20 Perforation Treatment Performed - Fractured
2015-01-20 Perforation Treatment Performed - Jet Perforation
2015-04-26 Well Began Production
2015-04-26 Well Fluid changed to Crude Oil
2015-04-26 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-11-18 Precision Drilling Corporation 529 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-11-18 328.00 Deviate (5 - 79 degrees)
2014-11-25 2494.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-12-04 Open Hole/Barefoot Completion 4883.50 4890.00 0
2015-01-14 Perforation 4367.00 4367.50 3
2015-01-19 Perforation 2844.00 2844.50 3
2015-01-19 Fracture 2844.00 2924.50 0
2015-01-19 Perforation 2824.00 2824.50 3
2015-01-19 Perforation 2804.00 2804.50 3
2015-01-19 Perforation 2784.00 2784.50 3
2015-01-19 Perforation 2764.00 2764.50 3
2015-01-19 Perforation 2744.00 2744.50 3
2015-01-19 Fracture 2744.00 2824.50 0
2015-01-19 Perforation 2724.00 2724.50 3
2015-01-19 Perforation 2704.00 2704.50 3
2015-01-14 Perforation 4347.00 4347.50 3
2015-01-19 Perforation 2684.00 2684.50 3
2015-01-19 Perforation 2664.00 2664.50 3
2015-01-19 Perforation 2644.00 2644.50 3
2015-01-19 Fracture 2644.00 2724.50 0
2015-01-20 Perforation 2634.00 2634.50 3
2015-01-20 Perforation 2604.00 2604.50 3
2015-01-20 Perforation 2584.00 2584.50 3
2015-01-20 Perforation 2564.00 2564.50 3
2015-01-20 Perforation 2543.00 2543.50 3
2015-01-20 Fracture 2543.00 2634.50 0
2015-01-14 Perforation 4327.00 4327.50 3
2015-01-14 Fracture 4327.00 4387.50 0
2015-01-15 Perforation 4307.00 4307.50 3
2015-01-15 Perforation 4287.00 4287.50 3
2015-01-15 Perforation 4267.00 4267.50 3
2015-01-15 Perforation 4247.00 4247.50 3
2015-01-15 Fracture 4247.00 4307.50 0
2015-01-15 Perforation 4227.00 4227.50 3
2015-01-13 Multi-Stage Fracture 4826.20 4840.40 0
2015-01-15 Perforation 4207.00 4207.50 3
2015-01-15 Perforation 4187.00 4187.50 3
2015-01-15 Perforation 4167.00 4167.50 3
2015-01-15 Perforation 4147.00 4147.50 3
2015-01-15 Fracture 4147.00 4227.50 0
2015-01-15 Perforation 4127.00 4127.50 3
2015-01-15 Perforation 4107.00 4107.50 3
2015-01-15 Perforation 4087.00 4087.50 3
2015-01-15 Perforation 4067.00 4067.50 3
2015-01-15 Perforation 4047.00 4047.50 3
2015-01-13 Multi-Stage Fracture 4768.30 4807.00 0
2015-01-15 Fracture 4047.00 4127.50 0
2015-01-16 Perforation 4027.00 4027.50 3
2015-01-16 Perforation 4007.00 4007.50 3
2015-01-16 Perforation 3986.00 3986.50 3
2015-01-16 Perforation 3966.00 3966.50 3
2015-01-16 Perforation 3946.00 3946.50 3
2015-01-16 Fracture 3946.00 4027.50 0
2015-01-16 Perforation 3926.00 3926.50 3
2015-01-16 Perforation 3906.00 3906.50 3
2015-01-16 Perforation 3886.00 3886.50 3
2015-01-13 Multi-Stage Fracture 4713.70 4752.80 0
2015-01-16 Perforation 3866.00 3866.50 3
2015-01-16 Perforation 3846.00 3846.50 3
2015-01-16 Fracture 3846.00 3926.50 0
2015-01-16 Perforation 3826.00 3826.50 3
2015-01-16 Perforation 3806.00 3806.50 3
2015-01-16 Perforation 3786.00 3786.50 3
2015-01-16 Perforation 3766.00 3766.50 3
2015-01-16 Perforation 3746.00 3746.50 3
2015-01-16 Fracture 3746.00 3826.50 0
2015-01-17 Perforation 3726.00 3726.50 3
2015-01-13 Multi-Stage Fracture 4637.20 4694.40 0
2015-01-17 Perforation 3706.00 3706.50 3
2015-01-17 Perforation 3686.00 3686.50 3
2015-01-17 Perforation 3666.00 3666.50 3
2015-01-17 Perforation 3646.00 3646.50 3
2015-01-17 Fracture 3646.00 3726.50 0
2015-01-17 Perforation 3626.00 3626.50 3
2015-01-17 Perforation 3606.00 3606.50 3
2015-01-17 Perforation 3586.00 3586.50 3
2015-01-17 Perforation 3566.00 3566.50 3
2015-01-17 Perforation 3546.00 3546.50 3
2015-01-14 Multi-Stage Fracture 4559.70 4617.90 0
2015-01-17 Fracture 3546.00 3626.50 0
2015-01-17 Perforation 3526.00 3536.50 3
2015-01-17 Perforation 3505.00 3505.50 3
2015-01-17 Perforation 3485.00 3585.50 3
2015-01-17 Perforation 3464.00 3464.50 3
2015-01-17 Fracture 3464.00 3536.50 0
2015-01-17 Perforation 3425.00 3425.50 3
2015-01-17 Perforation 3405.00 3405.50 3
2015-01-17 Perforation 3385.00 3385.50 3
2015-01-17 Perforation 3365.00 3365.50 3
2015-01-14 Multi-Stage Fracture 4483.30 4540.90 0
2015-01-17 Perforation 3345.00 3345.50 3
2015-01-18 Fracture 3345.00 3425.50 0
2015-01-18 Perforation 3325.00 3325.50 3
2015-01-18 Perforation 3305.00 3305.50 3
2015-01-18 Perforation 3285.00 3285.50 3
2015-01-18 Perforation 3265.00 3265.50 3
2015-01-18 Perforation 3245.00 3245.50 3
2015-01-18 Fracture 3245.00 3325.50 0
2015-01-18 Perforation 3225.00 3225.50 3
2015-01-18 Perforation 3205.00 3205.50 3
2015-01-14 Multi-Stage Fracture 4407.30 4464.40 0
2015-01-18 Perforation 3185.00 3185.50 3
2015-01-18 Perforation 3165.00 3165.50 3
2015-01-18 Perforation 3145.00 3145.50 3
2015-01-18 Fracture 3145.00 3225.50 0
2015-01-18 Perforation 3125.00 3125.50 3
2015-01-18 Perforation 3105.00 3105.50 3
2015-01-18 Perforation 3085.00 3085.50 3
2015-01-18 Perforation 3065.00 3065.50 3
2015-01-18 Perforation 3045.00 3045.50 3
2015-01-18 Fracture 3045.00 3125.50 0
2015-01-14 Perforation 4387.00 4387.50 3
2015-01-19 Perforation 3024.00 3024.50 3
2015-01-19 Perforation 3004.00 3004.50 3
2015-01-19 Perforation 2984.00 2984.50 3
2015-01-19 Perforation 2964.00 2964.50 3
2015-01-19 Perforation 2944.00 2944.50 3
2015-01-19 Fracture 2944.00 3024.50 0
2015-01-19 Perforation 2924.00 2924.50 3
2015-01-19 Perforation 2904.00 2904.50 3
2015-01-19 Perforation 2884.00 2884.50 3
2015-01-19 Perforation 2864.00 2864.50 3

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-01-13 2015-01-20 2,158 135 N/A
2 2015-01-14 2015-01-19 2,158 0 N/A
3 2015-01-13 2015-01-13 2,158 0 N/A
4 2015-01-20 2015-01-20 2,158 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric acid 7647-01-0 100 0.8135 N/A
Lease Water 7732-18-5 100 84.3991 N/A
Water 7732-18-5 100 0.8075 N/A
SAND - PREMIUM WHITE Halliburton Crystalline silica. quartz 14808-60-7 100 12.1775 N/A
SSA-2 Halliburton Crystalline silica. quartz 14808-60-7 100 0.1107 N/A
FR-66 Halliburton Friction Reducer Ammonium chloride 12125-02-9 100 1.6485 N/A
Ethoxylated alcohols 9068 100 1.6485 N/A
Fatty nitrogen derived amides 9068 100 1.6916 N/A
Hydrotreated light petroleum distillate 64742-47-8 100 1.6815 N/A
Inert ingredient(s) Trade Secret 100 1.7577 N/A
Proprietary ingredient(s) Trade Secret 100 1.6819 N/A
2 AP Breaker Halliburton Breaker Ammonium persulfate 7727-54-0 100 0.0002 N/A
LGC-36 UC - Canada Halliburton Gelling Agent Naphtha. hydrotreated heavy 8947 100 0.6042 N/A
Proprietary ingredient(s) Trade Secret 100 0.6042 N/A
3 K-35 Halliburton Buffer Sodium carbonate 497-19-8 100 0.0014 N/A
4 METHANOL Halliburton Solvent Methanol 67-56-1 100 0.2745 N/A
Water 7732-18-5 100 0.2745 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-01-13 2015-01-16 Surface Water - Runoff 10062
2015-01-17 2015-01-20 Surface Water - Runoff 5700

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 5645 0.0 0.0 0.0
2016 8657 0.0 0.0 0.0
2017 8284 0.0 0.0 0.0
2018 8610 0.0 0.0 0.0
2019 8666 0.0 0.0 0.0
2020 2104 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-12-04 No Incident Encountered 0.00 0.00
2015-01-20 No Incident Encountered 0.00 0.00

For data sources see[10]

References