X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786121116030

Well Details

Well ID: 0786121116030
Loading map...
Location: 03/16-11-078-12W6/0
Location Alias: 03/16-11-78-12 W6M
Location Alias 2: 03/16-11-078-12 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 12
Section: 11
County/Municipality: Saddle Hills County
Well Name: BIRCHCLIFF HZ PCOUPES 16-11-78-12
Operator Name: Birchcliff Energy Ltd.
License Number: 0468751
License Date: 2014-07-30
License Status: Issued
Spud Date: 2014-10-09
Final Drill Date: 2014-12-03
Well Total Depth: 4435.00 m
Surface Hole Latitude: 55.740524
Surface Hole Longitude: -119.705615

For data sources see[1][2]

Well History

Date Event
2014-07-30 Obtained License
2014-10-10 Surface Casing Operation Performed
2014-11-23 Direction Drilling Operation Performed - Deviate
2014-11-27 Direction Drilling Operation Performed - Horizontal
2014-12-03 Finished Drilling
2014-12-03 Well Log Performed
2014-12-03 Well Mode changed to Drilled and Cased
2014-12-04 Well Log Performed
2014-12-05 Liner Casing Operation Performed
2014-12-05 Production Casing Operation Performed
2014-12-05 Well Fluid changed to Gas
2014-12-05 Well Mode changed to Testing
2014-12-06 Rig Released
2014-12-16 Perforation Treatment Performed - Multi-Stage Fracture
2014-12-16 Perforation Treatment Performed - Open-Hole Completion
2014-12-20 Well Began Production
2014-12-20 Well Fluid changed to Gas
2014-12-20 Well Mode changed to Flowing
2016-08-26 Well Fluid changed to Gas
2016-08-26 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-10-09 Chinook Drilling Inc. 14 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-11-23 1949.00 Deviate (5 - 79 degrees)
2014-11-27 2410.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-12-16 Open Hole/Barefoot Completion 4432.00 4435.00 0
2014-12-16 Multi-Stage Fracture 3608.90 3609.70 0
2014-12-16 Multi-Stage Fracture 3512.40 3513.20 0
2014-12-16 Multi-Stage Fracture 3401.50 3402.30 0
2014-12-16 Multi-Stage Fracture 3291.30 3292.10 0
2014-12-16 Multi-Stage Fracture 3185.80 3186.60 0
2014-12-16 Multi-Stage Fracture 3077.30 3078.10 0
2014-12-16 Multi-Stage Fracture 2972.50 2973.30 0
2014-12-16 Multi-Stage Fracture 2866.40 2867.20 0
2014-12-16 Multi-Stage Fracture 2758.00 2758.80 0
2014-12-16 Multi-Stage Fracture 2661.80 2662.60 0
2014-12-16 Multi-Stage Fracture 4420.60 4421.40 0
2014-12-16 Multi-Stage Fracture 2553.50 2554.30 0
2014-12-16 Multi-Stage Fracture 2446.10 2446.90 0
2014-12-16 Multi-Stage Fracture 4356.00 4356.80 0
2014-12-16 Multi-Stage Fracture 4258.10 4258.90 0
2014-12-16 Multi-Stage Fracture 4150.30 4151.10 0
2014-12-16 Multi-Stage Fracture 4045.30 4046.10 0
2014-12-16 Multi-Stage Fracture 3937.90 3938.70 0
2014-12-16 Multi-Stage Fracture 3828.60 3829.40 0
2014-12-16 Multi-Stage Fracture 3718.80 3719.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-12-16 2014-12-16 2,258 4,470 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 2.0439 N/A
potassium chloride 7447-40-7 100 77.6582 N/A
water Not Available 100 77.6582 N/A
Pearl RCS 30/50 Trican polyurethane resin Trade Secret 100 3.8958 N/A
silica crystalline 14808-60-7 100 3.8958 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 9.9668 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 6.576 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0408 N/A
dibromoacetonitrile 3252-43-5 100 0.0408 N/A
non-hazardous ingredients Not Available 100 0.0408 N/A
polyethylene glycol 25322-68-3 100 0.0408 N/A
sodium bromide 7647-15-6 100 0.0408 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0076 N/A
FE-7 Trican Conductivity Enhancer non-hazardous ingredients Not Available 100 0.0283 N/A
pine terpene 9287 100 0.0283 N/A
propylene glycol 57-55-6 100 0.0283 N/A
quaternary amine 9287 100 0.0283 N/A
GFR-1 Trican Friction Reducer non-hazardous ingredients Not Available 100 0.1279 N/A
SS-5 Trican Surfactant aliphatic alcohol 8985 100 0.0439 N/A
aminofunctional polymer 8985 100 0.0439 N/A
distillates (petroleum). sweet medium 64741-86-2 100 0.0439 N/A
isopropanol 67-63-0 100 0.0439 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-12-06 2014-12-16 Groundwater - Saline 559
2014-12-10 2014-12-11 Oilfield Produced Water 55
2014-12-06 2014-12-06 Surface Water - Runoff 480
2014-12-14 2014-12-16 Surface Water - Runoff 1449
2014-12-05 2014-12-10 Surface Water - Runoff 1255
2014-12-05 2014-12-16 Surface Water - Runoff 672

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 189 0.0 0.0 0.0
2015 7718 0.0 0.0 0.0
2016 5031 0.0 0.0 0.0
2017 7811 0.0 0.0 0.0
2018 7823 0.0 0.0 0.0
2019 8543 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-12-06 No Incident Encountered 0.00 0.00
2014-12-18 No Incident Encountered 0.00 0.00

For data sources see[10]

References