If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786120613002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.734879,"lon":-119.85676,"icon":""}]} |
Location: 00/13-06-078-12W6/2 | |
Location Alias: 00/13-06-78-12 W6M | |
Location Alias 2: 00/13-06-078-12 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 12 | |
Section: 06 | |
County/Municipality: Saddle Hills County | |
Well Name: BIRCHCLIFF PCOUPES 13-6-78-12 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0163017 | |
License Date: 1993-12-09 | |
License Status: Suspension | |
Spud Date: 1994-01-02 | |
Final Drill Date: 1994-01-06 | |
Well Total Depth: 726.00 m | |
Surface Hole Latitude: 55.734879 | |
Surface Hole Longitude: -119.856760 |
Date | Event |
---|---|
1993-12-09 | Obtained License |
1994-01-02 | Well Log Performed |
1994-01-04 | Surface Casing Operation Performed |
1994-01-06 | Finished Drilling |
1994-01-06 | Well Log Performed |
1994-01-06 | Well Mode changed to Drilled and Cased |
1994-01-07 | Drill Stem Test Performed |
1994-01-08 | Drill Stem Test Performed |
1994-01-09 | Production Casing Operation Performed |
1994-01-09 | Rig Released |
1994-06-06 | Well Log Performed |
1994-06-07 | Perforation Treatment Performed - Jet Perforation |
1994-06-07 | Well Log Performed |
1994-06-09 | Perforation Treatment Performed - Jet Perforation |
1994-08-24 | Well Began Production |
1994-08-24 | Well Fluid changed to Gas |
1994-08-24 | Well Mode changed to Flowing |
2004-03-09 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1994-06-07 | Perforation | 437.50 | 440.00 | 14 |
1994-06-09 | Perforation | 589.00 | 592.00 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1994 | 2900 | 0.0 | 0.0 | 0.0 |
1995 | 8413 | 0.0 | 0.0 | 0.0 |
1996 | 8221 | 0.0 | 0.0 | 0.0 |
1997 | 7822 | 0.0 | 0.0 | 0.0 |
1998 | 8610 | 0.0 | 0.0 | 0.0 |
1999 | 8272 | 0.0 | 0.0 | 0.0 |
2000 | 8211 | 0.0 | 0.0 | 0.0 |
2001 | 8159 | 0.0 | 0.0 | 0.0 |
2002 | 8524 | 0.0 | 0.0 | 0.0 |
2003 | 5245 | 0.0 | 0.0 | 0.0 |
2004 | 1046 | 0.0 | 0.0 | 0.0 |
For data sources see[5]