X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786113014030

Well Details

Well ID: 0786113014030
Loading map...
Location: 03/14-30-078-11W6/0
Location Alias: 03/14-30-78-11 W6M
Location Alias 2: 03/14-30-078-11 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 11
Section: 30
County/Municipality: Saddle Hills County
Well Name: BIR 14-36 HZ 103 PCOUPES 14-30-78-11
Operator Name: Birchcliff Energy Ltd.
License Number: 0488457
License Date: 2018-03-06
License Status: Issued
Spud Date: 2018-04-23
Final Drill Date: 2018-05-04
Well Total Depth: 4600.00 m
Surface Hole Latitude: 55.807250
Surface Hole Longitude: -119.726025

For data sources see[1][2]

Well History

Date Event
2018-03-06 Obtained License
2018-04-24 Surface Casing Operation Performed
2018-04-25 Direction Drilling Operation Performed - Deviate
2018-04-29 Direction Drilling Operation Performed - Horizontal
2018-04-30 Well Log Performed
2018-05-04 Finished Drilling
2018-05-04 Well Log Performed
2018-05-04 Well Mode changed to Drilled and Cased
2018-05-05 Production Casing Operation Performed
2018-05-05 Well Log Performed
2018-05-06 Rig Released
2018-06-10 Perforation Treatment Performed - Jet Perforation
2018-06-21 Perforation Treatment Performed - Fractured
2018-06-21 Perforation Treatment Performed - Jet Perforation
2018-06-22 Perforation Treatment Performed - Fractured
2018-06-22 Perforation Treatment Performed - Jet Perforation
2018-06-23 Perforation Treatment Performed - Jet Perforation
2018-07-01 Perforation Treatment Performed - Fractured
2018-07-02 Perforation Treatment Performed - Fractured
2018-07-02 Perforation Treatment Performed - Jet Perforation
2018-07-03 Perforation Treatment Performed - Fractured
2018-07-03 Perforation Treatment Performed - Jet Perforation
2018-07-04 Perforation Treatment Performed - Fractured
2018-07-04 Perforation Treatment Performed - Jet Perforation
2018-07-05 Perforation Treatment Performed - Fractured
2018-07-05 Perforation Treatment Performed - Jet Perforation
2018-07-06 Perforation Treatment Performed - Fractured
2018-07-06 Perforation Treatment Performed - Jet Perforation
2018-07-07 Perforation Treatment Performed - Fractured
2018-07-07 Perforation Treatment Performed - Jet Perforation
2018-07-08 Perforation Treatment Performed - Fractured
2018-07-08 Perforation Treatment Performed - Jet Perforation
2018-07-23 Well Log Performed
2018-08-16 Well Began Production
2018-08-16 Well Fluid changed to Crude Oil
2018-08-16 Well Mode changed to Flowing
2019-04-29 Well Fluid changed to Crude Oil
2019-04-29 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-04-23 Ensign Drilling Inc. 555 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-04-25 673.00 Deviate (5 - 79 degrees)
2018-04-29 2238.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-06-10 Perforation 4548.40 4549.40 12
2018-06-22 Perforation 4410.50 4410.80 3
2018-07-06 Fracture 2974.50 3025.80 0
2018-07-06 Perforation 2957.50 2957.80 3
2018-07-06 Perforation 2940.50 2940.80 3
2018-07-06 Perforation 2923.50 2923.80 3
2018-07-06 Perforation 2906.50 2906.80 3
2018-07-06 Fracture 2906.50 2957.80 0
2018-07-06 Perforation 2889.50 2889.80 3
2018-07-06 Perforation 2872.50 2872.80 3
2018-07-06 Perforation 2855.50 2855.80 3
2018-07-06 Perforation 2838.50 2838.80 3
2018-06-22 Fracture 4410.50 4461.80 0
2018-07-06 Fracture 2838.50 2889.80 0
2018-07-06 Perforation 2821.50 2821.80 3
2018-07-06 Perforation 2804.50 2804.80 3
2018-07-06 Perforation 2787.50 2787.80 3
2018-07-06 Perforation 2770.50 2770.80 3
2018-07-06 Fracture 2770.50 2821.80 0
2018-07-06 Perforation 2753.50 2753.80 3
2018-07-06 Perforation 2736.50 2736.80 3
2018-07-06 Perforation 2719.50 2719.80 3
2018-07-06 Perforation 2702.50 2702.80 3
2018-06-23 Perforation 4393.50 4393.80 3
2018-07-07 Fracture 2702.50 2753.80 0
2018-07-07 Perforation 2685.50 2685.80 3
2018-07-07 Perforation 2668.50 2668.80 3
2018-07-07 Perforation 2651.50 2651.80 3
2018-07-07 Perforation 2634.50 2634.80 3
2018-07-07 Fracture 2634.50 2685.80 0
2018-07-07 Perforation 2617.50 2617.80 3
2018-07-07 Perforation 2600.50 2600.80 3
2018-07-07 Perforation 2583.50 2583.80 3
2018-07-07 Perforation 2566.50 2566.80 3
2018-06-23 Perforation 4376.50 4376.80 3
2018-07-07 Fracture 2566.50 2617.80 0
2018-07-07 Perforation 2549.50 2549.80 3
2018-07-07 Perforation 2532.50 2532.80 3
2018-07-07 Perforation 2515.50 2515.80 3
2018-07-07 Perforation 2498.50 2498.80 3
2018-07-07 Fracture 2498.50 2549.80 0
2018-07-07 Perforation 2481.50 2481.80 3
2018-07-07 Perforation 2464.50 2464.80 3
2018-07-07 Perforation 2447.50 2447.80 3
2018-07-07 Perforation 2430.50 2430.80 3
2018-06-23 Perforation 4359.50 4359.80 3
2018-07-07 Fracture 2430.50 2481.80 0
2018-07-07 Perforation 2413.50 2413.80 3
2018-07-07 Perforation 2396.50 2396.80 3
2018-07-07 Perforation 2379.50 2379.80 3
2018-07-07 Perforation 2362.50 2362.80 3
2018-07-07 Fracture 2362.50 2413.80 0
2018-07-07 Perforation 2345.50 2345.80 3
2018-07-07 Perforation 2328.50 2328.80 3
2018-07-07 Perforation 2311.50 2311.80 3
2018-07-07 Perforation 2294.50 2294.80 3
2018-06-23 Perforation 4342.50 4342.80 3
2018-07-07 Fracture 2294.50 2345.80 0
2018-07-08 Perforation 2277.50 2277.80 3
2018-07-08 Perforation 2260.50 2260.80 3
2018-07-08 Perforation 2243.50 2243.80 3
2018-07-08 Perforation 2226.50 2226.80 3
2018-07-08 Fracture 2226.50 2277.80 0
2018-07-01 Fracture 4342.50 4393.80 0
2018-07-02 Perforation 4325.50 4325.80 3
2018-07-02 Perforation 4308.50 4308.80 3
2018-07-02 Perforation 4291.50 4291.80 3
2018-06-21 Perforation 4529.50 4529.80 3
2018-07-02 Perforation 4274.50 4274.80 3
2018-07-02 Fracture 4274.50 4325.80 0
2018-07-02 Perforation 4257.50 4257.80 3
2018-07-02 Perforation 4240.50 4240.80 3
2018-07-02 Perforation 4223.50 4223.80 3
2018-07-02 Perforation 4206.50 4206.80 3
2018-07-02 Fracture 4206.50 4257.80 0
2018-07-02 Perforation 4189.50 4189.80 3
2018-07-02 Perforation 4172.50 4172.80 3
2018-07-02 Perforation 4155.50 4155.80 3
2018-06-21 Perforation 4512.50 4512.80 3
2018-07-02 Perforation 4138.50 4138.80 3
2018-07-02 Fracture 4138.50 4189.80 0
2018-07-02 Perforation 4121.50 4121.80 3
2018-07-02 Perforation 4104.50 4104.80 3
2018-07-02 Perforation 4087.50 4087.80 3
2018-07-02 Fracture 4087.50 4121.80 0
2018-07-02 Perforation 4060.30 4060.60 3
2018-07-02 Perforation 4022.80 4023.10 3
2018-07-02 Perforation 3985.30 3985.60 3
2018-07-02 Perforation 3947.80 3948.10 3
2018-06-21 Perforation 4495.50 4495.80 3
2018-07-03 Fracture 3947.80 4060.60 0
2018-07-03 Perforation 3910.30 3910.60 3
2018-07-03 Perforation 3872.80 3873.10 3
2018-07-03 Perforation 3835.30 3835.60 3
2018-07-03 Perforation 3797.80 3798.10 3
2018-07-03 Fracture 3797.80 3910.60 0
2018-07-03 Perforation 3760.30 3760.60 3
2018-07-03 Perforation 3722.80 3723.10 3
2018-07-03 Perforation 3685.30 3685.60 3
2018-07-03 Perforation 3647.80 3648.10 3
2018-06-21 Perforation 4478.50 4478.80 3
2018-07-03 Fracture 3647.80 3760.60 0
2018-07-03 Perforation 3620.50 3620.80 3
2018-07-03 Perforation 3603.50 3603.80 3
2018-07-03 Perforation 3586.50 3586.80 3
2018-07-03 Perforation 3569.50 3569.80 3
2018-07-03 Fracture 3569.50 3620.80 0
2018-07-03 Perforation 3552.50 3552.80 3
2018-07-03 Perforation 3535.50 3535.80 3
2018-07-03 Perforation 3518.50 3518.80 3
2018-07-03 Fracture 3518.50 3552.80 0
2018-06-21 Fracture 4478.50 4529.80 0
2018-07-03 Perforation 3501.50 3501.80 3
2018-07-03 Perforation 3484.50 3484.80 3
2018-07-03 Perforation 3467.50 3467.80 3
2018-07-03 Perforation 3450.50 3450.80 3
2018-07-03 Fracture 3450.50 3501.80 0
2018-07-04 Perforation 3433.50 3433.80 3
2018-07-04 Perforation 3416.50 3416.80 3
2018-07-04 Perforation 3399.50 3399.80 3
2018-07-04 Fracture 3399.50 3433.80 0
2018-07-04 Perforation 3382.50 3382.80 3
2018-06-22 Perforation 4461.50 4461.80 3
2018-07-04 Perforation 3365.50 3365.80 3
2018-07-04 Perforation 3348.50 3348.80 3
2018-07-04 Perforation 3331.50 3331.80 3
2018-07-04 Fracture 3331.50 3382.80 0
2018-07-04 Perforation 3314.50 3314.80 3
2018-07-04 Perforation 3297.50 3297.80 3
2018-07-04 Perforation 3280.50 3280.80 3
2018-07-04 Fracture 3280.50 3314.80 0
2018-07-04 Perforation 3263.50 3263.80 3
2018-07-04 Perforation 3246.50 3246.80 3
2018-06-22 Perforation 4444.50 4444.80 3
2018-07-04 Perforation 3229.50 3229.80 3
2018-07-04 Perforation 3212.50 3212.80 3
2018-07-05 Fracture 3212.50 3263.80 0
2018-07-05 Perforation 3195.50 3195.80 3
2018-07-05 Perforation 3178.50 3178.80 3
2018-07-05 Perforation 3161.50 3161.80 3
2018-07-05 Fracture 3161.50 3195.80 0
2018-07-05 Perforation 3144.50 3144.80 3
2018-07-05 Perforation 3127.50 3127.80 3
2018-07-05 Perforation 3110.50 3110.80 3
2018-06-22 Perforation 4427.50 4427.80 3
2018-07-05 Perforation 3093.50 3093.80 3
2018-07-05 Fracture 3093.50 3144.80 0
2018-07-05 Perforation 3076.50 3076.80 3
2018-07-05 Perforation 3059.50 3059.80 3
2018-07-05 Perforation 3042.50 3042.80 3
2018-07-05 Fracture 3042.50 3076.80 0
2018-07-05 Perforation 3025.50 3025.80 3
2018-07-05 Perforation 3008.50 3008.80 3
2018-07-05 Perforation 2991.50 2991.80 3
2018-07-05 Perforation 2974.50 2974.80 3

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-06-21 2018-07-08 2,040 16,175 N/A
2 2018-07-02 2018-07-08 2,040 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 83.7387 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 10.8771 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 4.712 N/A
15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 0.5589 N/A
Water 7732-18-5 100 0.5589 N/A
SaniFrac 8844 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0106 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0106 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0106 N/A
Polyethylene glycol 25322-68-3 100 0.0106 N/A
Sodium bromide 7647-15-6 100 0.0106 N/A
DWP-641 Calfrac Friction Reducer Ammonium chloride 12125-02-9 100 0.0977 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0977 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0977 N/A
2 DAP-111 Calfrac Corrosion Inhibitor Hydroxylated hydrocarbon 8676 100 0.005 N/A
Inorganic salt 8676 100 0.005 N/A
Water 7732-18-5 100 0.005 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-04-28 2018-05-18 Recycled Fracturing Water (treated at well site) 853
2018-04-28 2018-05-18 Recycled Fracturing Water (treated at well site) 922
2018-06-22 2018-07-08 Surface Water - Runoff 14394

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 2272 0.0 0.0 0.0
2019 8193 0.0 0.0 0.0
2020 2104 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-05-06 No Incident Encountered 0.00 0.00
2018-07-23 No Incident Encountered 0.00 0.00

For data sources see[10]

References