X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786113014020

Well Details

Well ID: 0786113014020
Loading map...
Location: 02/14-30-078-11W6/0
Location Alias: 02/14-30-78-11 W6M
Location Alias 2: 02/14-30-078-11 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 11
Section: 30
County/Municipality: Saddle Hills County
Well Name: BIR 14-36 HZ 102 PCOUPES 14-30-78-11
Operator Name: Birchcliff Energy Ltd.
License Number: 0488456
License Date: 2018-03-06
License Status: Issued
Spud Date: 2018-05-06
Final Drill Date: 2018-05-15
Well Total Depth: 4480.00 m
Surface Hole Latitude: 55.807300
Surface Hole Longitude: -119.725892

For data sources see[1][2]

Well History

Date Event
2018-03-06 Obtained License
2018-05-07 Surface Casing Operation Performed
2018-05-08 Direction Drilling Operation Performed - Deviate
2018-05-12 Direction Drilling Operation Performed - Horizontal
2018-05-12 Well Log Performed
2018-05-15 Finished Drilling
2018-05-15 Well Log Performed
2018-05-15 Well Mode changed to Drilled and Cased
2018-05-16 Production Casing Operation Performed
2018-05-16 Rig Released
2018-05-16 Well Log Performed
2018-06-11 Perforation Treatment Performed - Jet Perforation
2018-06-21 Perforation Treatment Performed - Jet Perforation
2018-06-21 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-22 Perforation Treatment Performed - Jet Perforation
2018-06-22 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-23 Perforation Treatment Performed - Jet Perforation
2018-06-23 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-24 Perforation Treatment Performed - Jet Perforation
2018-06-24 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-25 Perforation Treatment Performed - Jet Perforation
2018-06-25 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-26 Perforation Treatment Performed - Jet Perforation
2018-06-26 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-27 Perforation Treatment Performed - Jet Perforation
2018-06-27 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-28 Perforation Treatment Performed - Jet Perforation
2018-06-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-29 Perforation Treatment Performed - Jet Perforation
2018-06-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-30 Perforation Treatment Performed - Multi-Stage Fracture
2018-08-07 Well Log Performed
2018-08-12 Well Began Production
2018-08-12 Well Fluid changed to Crude Oil
2018-08-12 Well Mode changed to Flowing
2019-04-29 Well Fluid changed to Crude Oil
2019-04-29 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2018-05-08 676.80 Deviate (5 - 79 degrees)
2018-05-12 2279.90 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-06-11 Perforation 4433.70 4434.70 12
2018-06-22 Perforation 4314.50 4314.80 3
2018-06-27 Perforation 3025.50 3025.80 3
2018-06-27 Perforation 3008.50 3008.80 3
2018-06-27 Multi-Stage Fracture 3008.50 3059.80 0
2018-06-27 Perforation 2991.50 2991.80 3
2018-06-27 Perforation 2974.50 2974.80 3
2018-06-27 Perforation 2957.50 2957.80 3
2018-06-27 Perforation 2940.50 2940.80 3
2018-06-27 Multi-Stage Fracture 2940.50 2991.80 0
2018-06-28 Perforation 2923.50 2923.80 3
2018-06-28 Perforation 2906.50 2906.80 3
2018-06-22 Perforation 4297.50 4297.80 3
2018-06-28 Perforation 2889.50 2889.80 3
2018-06-28 Perforation 2872.50 2872.80 3
2018-06-28 Multi-Stage Fracture 2872.50 2923.80 0
2018-06-28 Perforation 2855.50 2855.80 3
2018-06-28 Perforation 2838.50 2838.80 3
2018-06-28 Perforation 2821.50 2821.80 3
2018-06-28 Perforation 2804.50 2804.80 3
2018-06-28 Multi-Stage Fracture 2804.50 2855.80 0
2018-06-28 Perforation 2787.50 2787.80 3
2018-06-28 Perforation 2770.50 2770.80 3
2018-06-22 Multi-Stage Fracture 4297.50 4348.80 0
2018-06-28 Perforation 2753.50 2753.80 3
2018-06-28 Perforation 2736.50 2736.80 3
2018-06-28 Multi-Stage Fracture 2736.50 2787.80 0
2018-06-28 Perforation 2719.50 2719.80 3
2018-06-28 Perforation 2702.50 2702.80 3
2018-06-28 Perforation 2685.50 2685.80 3
2018-06-28 Perforation 2668.50 2668.80 3
2018-06-29 Multi-Stage Fracture 2668.50 2719.80 0
2018-06-29 Perforation 2651.50 2651.80 3
2018-06-29 Perforation 2634.50 2634.80 3
2018-06-23 Perforation 4280.50 4280.80 3
2018-06-29 Perforation 2617.50 2617.80 3
2018-06-29 Perforation 2600.50 2600.80 3
2018-06-29 Multi-Stage Fracture 2600.50 2651.80 0
2018-06-29 Perforation 2583.50 2583.80 3
2018-06-29 Perforation 2566.50 2566.80 3
2018-06-29 Perforation 2549.50 2549.80 3
2018-06-29 Perforation 2532.50 2532.80 3
2018-06-29 Multi-Stage Fracture 2532.50 2583.80 0
2018-06-29 Perforation 2515.50 2515.80 3
2018-06-29 Perforation 2498.50 2498.80 3
2018-06-23 Perforation 4263.50 4263.80 3
2018-06-29 Perforation 2481.50 2481.80 3
2018-06-29 Perforation 2464.50 2464.80 3
2018-06-29 Multi-Stage Fracture 2464.50 2515.80 0
2018-06-29 Perforation 2447.50 2447.80 3
2018-06-29 Perforation 2430.50 2430.80 3
2018-06-29 Perforation 2413.50 2413.80 3
2018-06-29 Perforation 2396.50 2396.80 3
2018-06-29 Multi-Stage Fracture 2396.50 2447.80 0
2018-06-29 Perforation 2379.50 2379.80 3
2018-06-29 Perforation 2362.50 2362.80 3
2018-06-23 Perforation 4246.50 4246.80 3
2018-06-29 Perforation 2345.50 2345.80 3
2018-06-29 Perforation 2328.50 2328.80 3
2018-06-29 Multi-Stage Fracture 2328.50 2379.80 0
2018-06-29 Perforation 2311.50 2311.80 3
2018-06-29 Perforation 2294.50 2294.80 3
2018-06-29 Perforation 2277.50 2277.80 3
2018-06-29 Perforation 2260.50 2260.80 3
2018-06-30 Multi-Stage Fracture 2260.50 2311.80 0
2018-06-23 Multi-Stage Fracture 4246.50 4280.80 0
2018-06-23 Perforation 4229.50 4229.80 3
2018-06-23 Perforation 4212.50 4212.80 3
2018-06-23 Perforation 4195.50 4195.80 3
2018-06-21 Perforation 4416.50 4416.80 3
2018-06-23 Perforation 4178.50 4178.80 3
2018-06-24 Multi-Stage Fracture 4178.50 4229.80 0
2018-06-24 Perforation 4161.50 4161.80 3
2018-06-24 Perforation 4144.50 4144.80 3
2018-06-24 Perforation 4127.50 4127.80 3
2018-06-24 Multi-Stage Fracture 4127.50 4161.80 0
2018-06-24 Perforation 4100.30 4100.60 3
2018-06-24 Perforation 4062.80 4063.10 3
2018-06-24 Perforation 4025.30 4025.60 3
2018-06-24 Perforation 3987.80 3988.10 3
2018-06-21 Perforation 4399.50 4399.80 3
2018-06-24 Multi-Stage Fracture 3987.80 4100.60 0
2018-06-24 Perforation 3960.50 3960.80 3
2018-06-24 Perforation 3943.50 3943.80 3
2018-06-24 Perforation 3926.50 3926.80 3
2018-06-24 Perforation 3909.50 3909.80 3
2018-06-24 Multi-Stage Fracture 3909.50 3960.80 0
2018-06-24 Perforation 3892.50 3892.80 3
2018-06-24 Perforation 3875.50 3875.80 3
2018-06-24 Perforation 3858.50 3858.80 3
2018-06-24 Perforation 3841.50 3841.80 3
2018-06-21 Perforation 4382.50 4382.80 3
2018-06-24 Multi-Stage Fracture 3841.50 3892.80 0
2018-06-25 Perforation 3824.50 3824.80 3
2018-06-25 Perforation 3807.50 3807.80 3
2018-06-25 Perforation 3790.50 3790.80 3
2018-06-25 Perforation 3773.50 3773.80 3
2018-06-25 Multi-Stage Fracture 3773.50 3824.80 0
2018-06-25 Perforation 3756.50 3756.80 3
2018-06-25 Perforation 3739.50 3739.80 3
2018-06-25 Perforation 3722.50 3722.80 3
2018-06-25 Perforation 3705.50 3705.80 3
2018-06-21 Perforation 4365.50 4365.80 3
2018-06-25 Multi-Stage Fracture 3705.50 3756.80 0
2018-06-25 Perforation 3688.50 3688.80 3
2018-06-25 Perforation 3671.50 3671.80 3
2018-06-25 Perforation 3654.50 3654.80 3
2018-06-25 Perforation 3637.50 3637.80 3
2018-06-25 Multi-Stage Fracture 3637.50 3688.80 0
2018-06-25 Perforation 3620.50 3620.80 3
2018-06-25 Perforation 3603.50 3603.80 3
2018-06-25 Perforation 3586.50 3586.80 3
2018-06-25 Perforation 3569.50 3569.80 3
2018-06-21 Multi-Stage Fracture 4116.50 4365.80 0
2018-06-25 Multi-Stage Fracture 3569.50 3620.80 0
2018-06-26 Perforation 3552.50 3552.80 3
2018-06-26 Perforation 3535.50 3535.80 3
2018-06-26 Perforation 3518.50 3518.80 3
2018-06-26 Perforation 3501.50 3501.80 3
2018-06-26 Multi-Stage Fracture 3501.50 3552.80 0
2018-06-26 Perforation 3484.50 3484.80 3
2018-06-26 Perforation 3467.50 3467.80 3
2018-06-26 Perforation 3450.50 3450.80 3
2018-06-26 Multi-Stage Fracture 3450.50 3484.80 0
2018-06-21 Multi-Stage Fracture 4365.50 4416.80 0
2018-06-26 Perforation 3433.50 3433.80 4
2018-06-26 Perforation 3416.50 3416.80 3
2018-06-26 Perforation 3399.50 3399.80 3
2018-06-26 Perforation 3382.50 3382.80 3
2018-06-26 Multi-Stage Fracture 3382.50 3433.80 0
2018-06-26 Perforation 3365.50 3365.80 3
2018-06-26 Perforation 3348.50 3348.80 3
2018-06-26 Perforation 3331.50 3331.80 3
2018-06-26 Multi-Stage Fracture 3331.50 3365.80 0
2018-06-26 Perforation 3314.50 3314.80 3
2018-06-22 Perforation 4348.50 4348.80 3
2018-06-26 Perforation 3297.50 3297.80 3
2018-06-26 Perforation 3280.50 3280.80 3
2018-06-26 Perforation 3263.50 3263.80 3
2018-06-26 Multi-Stage Fracture 3263.50 3314.80 0
2018-06-27 Perforation 3246.50 3246.80 3
2018-06-27 Perforation 3229.50 3229.80 3
2018-06-27 Perforation 3212.50 3212.80 3
2018-06-27 Multi-Stage Fracture 3212.50 3246.80 0
2018-06-27 Perforation 3195.50 3195.80 3
2018-06-27 Perforation 3178.50 3178.80 3
2018-06-22 Perforation 4331.50 4331.80 3
2018-06-27 Perforation 3161.50 3161.80 3
2018-06-27 Perforation 3144.50 3144.80 3
2018-06-27 Multi-Stage Fracture 3144.50 3195.80 0
2018-06-27 Perforation 3127.50 3127.80 3
2018-06-27 Perforation 3110.50 3110.80 3
2018-06-27 Perforation 3093.50 3093.80 3
2018-06-27 Perforation 3076.50 3076.80 3
2018-06-27 Multi-Stage Fracture 3076.50 3127.80 0
2018-06-27 Perforation 3059.50 3059.80 3
2018-06-27 Perforation 3042.50 3042.80 3

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-06-21 2018-06-30 2,124 17,858 N/A
2 2018-06-25 2018-06-25 2,124 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 84.5923 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 14.7794 N/A
15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 0.5211 N/A
Water 7732-18-5 100 0.5211 N/A
SaniFrac 8844 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.011 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.011 N/A
Non-Hazardous Ingredients Trade Secret 100 0.011 N/A
Polyethylene glycol 25322-68-3 100 0.011 N/A
Sodium bromide 7647-15-6 100 0.011 N/A
DWP-641 Calfrac Friction Reducer Ammonium chloride 12125-02-9 100 0.0951 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.0951 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0951 N/A
2 DAP-111 Calfrac Corrosion Inhibitor Hydroxylated hydrocarbon 8676 100 0.0071 N/A
Inorganic salt 8676 100 0.0071 N/A
Water 7732-18-5 100 0.0071 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-04-28 2018-05-18 Recycled Fracturing Water (treated at well site) 938
2018-04-28 2018-05-18 Recycled Fracturing Water (treated at well site) 1015
2018-06-22 2018-07-08 Surface Water - Runoff 15839

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 2250 0.0 0.0 0.0
2019 8228 0.0 0.0 0.0
2020 2164 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-05-16 No Incident Encountered 0.00 0.00
2018-06-30 No Incident Encountered 0.00 0.00
2018-08-12 No Incident Encountered 0.00 0.00

For data sources see[9]

References