If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786113013020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.807152,"lon":-119.726292,"icon":""}]} |
Location: 02/13-30-078-11W6/0 | |
Location Alias: 02/13-30-78-11 W6M | |
Location Alias 2: 02/13-30-078-11 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 11 | |
Section: 30 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 13-36 HZ 102 PCOUPES 13-30-78-11 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0487780 | |
License Date: 2018-01-23 | |
License Status: Issued | |
Spud Date: 2018-03-29 | |
Final Drill Date: 2018-04-08 | |
Well Total Depth: 4340.00 m | |
Surface Hole Latitude: 55.807152 | |
Surface Hole Longitude: -119.726292 |
Date | Event |
---|---|
2018-01-23 | Obtained License |
2018-03-30 | Surface Casing Operation Performed |
2018-04-01 | Direction Drilling Operation Performed - Deviate |
2018-04-04 | Direction Drilling Operation Performed - Horizontal |
2018-04-05 | Well Log Performed |
2018-04-08 | Finished Drilling |
2018-04-08 | Well Log Performed |
2018-04-08 | Well Mode changed to Drilled and Cased |
2018-04-09 | Production Casing Operation Performed |
2018-04-09 | Well Log Performed |
2018-04-10 | Rig Released |
2018-06-10 | Perforation Treatment Performed - Jet Perforation |
2018-06-21 | Perforation Treatment Performed - Fractured |
2018-06-22 | Perforation Treatment Performed - Fractured |
2018-06-22 | Perforation Treatment Performed - Jet Perforation |
2018-06-23 | Perforation Treatment Performed - Fractured |
2018-06-23 | Perforation Treatment Performed - Jet Perforation |
2018-06-24 | Perforation Treatment Performed - Fractured |
2018-06-24 | Perforation Treatment Performed - Jet Perforation |
2018-06-25 | Perforation Treatment Performed - Fractured |
2018-06-25 | Perforation Treatment Performed - Jet Perforation |
2018-06-26 | Perforation Treatment Performed - Fractured |
2018-06-26 | Perforation Treatment Performed - Jet Perforation |
2018-06-27 | Perforation Treatment Performed - Fractured |
2018-06-27 | Perforation Treatment Performed - Jet Perforation |
2018-07-20 | Well Log Performed |
2018-08-08 | Well Began Production |
2018-08-08 | Well Fluid changed to Crude Oil |
2018-08-08 | Well Mode changed to Flowing |
2019-04-28 | Well Fluid changed to Crude Oil |
2019-04-28 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2018-03-29 | Ensign Drilling Inc. | 555 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2018-04-01 | 650.20 | Deviate (5 - 79 degrees) |
2018-04-04 | 2287.60 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-06-10 | Perforation | 4289.20 | 4290.20 | 12 |
2018-06-23 | Perforation | 4072.80 | 4073.10 | 3 |
2018-06-23 | Fracture | 4072.80 | 4185.60 | 0 |
2018-06-24 | Perforation | 4035.30 | 4035.60 | 3 |
2018-06-24 | Perforation | 3997.80 | 3998.10 | 3 |
2018-06-24 | Perforation | 3960.30 | 3960.60 | 3 |
2018-06-24 | Perforation | 3922.80 | 3923.10 | 3 |
2018-06-24 | Fracture | 3922.80 | 4035.60 | 0 |
2018-06-24 | Perforation | 3885.30 | 3885.60 | 3 |
2018-06-24 | Perforation | 3847.80 | 3848.10 | 3 |
2018-06-24 | Perforation | 3810.30 | 3810.60 | 3 |
2018-06-21 | Fracture | 4289.20 | 4290.20 | 0 |
2018-06-24 | Perforation | 3772.80 | 3773.10 | 3 |
2018-06-24 | Fracture | 3772.80 | 3885.60 | 0 |
2018-06-24 | Perforation | 3735.30 | 3735.60 | 3 |
2018-06-24 | Perforation | 3697.80 | 3698.10 | 3 |
2018-06-24 | Perforation | 3660.30 | 3660.60 | 3 |
2018-06-24 | Perforation | 3622.80 | 3623.10 | 3 |
2018-06-24 | Fracture | 3622.80 | 3735.60 | 0 |
2018-06-24 | Perforation | 3591.50 | 3591.80 | 3 |
2018-06-24 | Perforation | 3566.50 | 3566.80 | 3 |
2018-06-24 | Perforation | 3541.50 | 3541.80 | 3 |
2018-06-22 | Perforation | 4266.50 | 4266.80 | 10 |
2018-06-24 | Perforation | 3516.50 | 3516.80 | 3 |
2018-06-24 | Fracture | 3516.50 | 3591.80 | 0 |
2018-06-24 | Perforation | 3491.50 | 3491.80 | 3 |
2018-06-24 | Perforation | 3466.50 | 3466.80 | 3 |
2018-06-24 | Perforation | 3441.50 | 3441.80 | 3 |
2018-06-25 | Fracture | 3441.50 | 3491.80 | 0 |
2018-06-25 | Perforation | 3416.50 | 3416.80 | 3 |
2018-06-25 | Perforation | 3391.50 | 3391.80 | 3 |
2018-06-25 | Perforation | 3366.50 | 3366.80 | 3 |
2018-06-25 | Perforation | 3341.50 | 3341.80 | 3 |
2018-06-22 | Perforation | 4241.50 | 4241.80 | 3 |
2018-06-25 | Fracture | 3341.50 | 3416.80 | 0 |
2018-06-25 | Perforation | 3316.50 | 3316.80 | 3 |
2018-06-25 | Perforation | 3291.50 | 3291.80 | 3 |
2018-06-25 | Perforation | 3266.50 | 3266.80 | 3 |
2018-06-25 | Fracture | 3266.50 | 3316.80 | 0 |
2018-06-25 | Perforation | 3241.50 | 3241.80 | 3 |
2018-06-25 | Perforation | 3216.50 | 3216.80 | 3 |
2018-06-25 | Perforation | 3191.50 | 3191.80 | 3 |
2018-06-25 | Perforation | 3166.50 | 3166.80 | 3 |
2018-06-25 | Fracture | 3166.50 | 3241.80 | 0 |
2018-06-22 | Perforation | 4216.50 | 4216.80 | 3 |
2018-06-25 | Perforation | 3141.50 | 3141.80 | 3 |
2018-06-25 | Perforation | 3116.50 | 3116.80 | 3 |
2018-06-25 | Perforation | 3091.50 | 3091.80 | 3 |
2018-06-25 | Fracture | 3091.50 | 3141.80 | 0 |
2018-06-26 | Perforation | 3066.50 | 3066.80 | 3 |
2018-06-26 | Perforation | 3041.50 | 3041.80 | 3 |
2018-06-26 | Perforation | 3016.50 | 3016.80 | 3 |
2018-06-26 | Perforation | 2991.50 | 2991.80 | 3 |
2018-06-26 | Fracture | 2991.50 | 3066.80 | 0 |
2018-06-26 | Perforation | 2966.50 | 2966.80 | 3 |
2018-06-22 | Fracture | 4216.50 | 4266.80 | 0 |
2018-06-26 | Perforation | 2941.50 | 2941.80 | 3 |
2018-06-26 | Perforation | 2916.50 | 2916.80 | 3 |
2018-06-26 | Fracture | 2916.50 | 2966.80 | 0 |
2018-06-26 | Perforation | 2891.50 | 2891.80 | 3 |
2018-06-26 | Perforation | 2866.50 | 2866.80 | 3 |
2018-06-26 | Perforation | 2841.50 | 2841.80 | 3 |
2018-06-26 | Perforation | 2816.50 | 2816.80 | 3 |
2018-06-26 | Fracture | 2816.50 | 2891.80 | 0 |
2018-06-26 | Perforation | 2791.50 | 2791.80 | 3 |
2018-06-26 | Perforation | 2766.50 | 2766.80 | 3 |
2018-06-23 | Perforation | 4185.30 | 4185.60 | 3 |
2018-06-26 | Perforation | 2741.50 | 2741.80 | 3 |
2018-06-26 | Fracture | 2741.50 | 2791.80 | 0 |
2018-06-26 | Perforation | 2716.50 | 2716.80 | 3 |
2018-06-26 | Perforation | 2691.50 | 2691.80 | 3 |
2018-06-26 | Perforation | 2666.50 | 2666.80 | 3 |
2018-06-26 | Perforation | 2641.50 | 2741.80 | 3 |
2018-06-27 | Fracture | 2641.50 | 2716.80 | 0 |
2018-06-27 | Perforation | 2616.50 | 2616.80 | 3 |
2018-06-27 | Perforation | 2591.50 | 2591.80 | 3 |
2018-06-27 | Perforation | 2566.50 | 2566.80 | 3 |
2018-06-23 | Perforation | 4147.80 | 4148.10 | 3 |
2018-06-27 | Perforation | 2541.50 | 2541.80 | 3 |
2018-06-27 | Fracture | 2541.50 | 2616.80 | 0 |
2018-06-27 | Perforation | 2516.50 | 2516.80 | 3 |
2018-06-27 | Perforation | 2491.50 | 2491.80 | 3 |
2018-06-27 | Perforation | 2466.50 | 2466.80 | 3 |
2018-06-27 | Perforation | 2441.50 | 2441.80 | 3 |
2018-06-27 | Fracture | 2441.50 | 2516.80 | 0 |
2018-06-27 | Perforation | 2416.50 | 2416.80 | 3 |
2018-06-27 | Perforation | 2391.50 | 2391.80 | 3 |
2018-06-27 | Perforation | 2366.50 | 2366.80 | 3 |
2018-06-23 | Perforation | 4110.30 | 4110.60 | 3 |
2018-06-27 | Perforation | 2341.50 | 2341.80 | 3 |
2018-06-27 | Fracture | 2341.50 | 2416.80 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2018-06-21 | 2018-06-27 | 2,122 | 12,153 | N/A |
2 | 2018-06-22 | 2018-06-27 | 2,122 | 0 | N/A |
3 | 2018-06-21 | 2018-06-21 | 2,122 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 82.8763 | N/A | |||
15% HCl | Calfrac | Acid | Hydrochloric acid | 7647-01-0 | 100 | 0.4476 | N/A | |
Water | 7732-18-5 | 100 | 0.4476 | N/A | ||||
SaniFrac 8844 | Calfrac | Bactericide/Biocide | Acetamide. 2.2-dibromo-2-cyano | 10222-01-2 | 100 | 0.0101 | N/A | |
Acetonitrile. 2.2-dibromo | 3252-43-5 | 100 | 0.0102 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0101 | N/A | ||||
Polyethylene glycol | 25322-68-3 | 100 | 0.0101 | N/A | ||||
Sodium bromide | 7647-15-6 | 100 | 0.0101 | N/A | ||||
DAP-111 | Calfrac | Corrosion Inhibitor | Hydroxylated hydrocarbon | 8676 | 100 | 0.006 | N/A | |
Inorganic salt | 8676 | 100 | 0.006 | N/A | ||||
Water | 7732-18-5 | 100 | 0.006 | N/A | ||||
DWP-641 | Calfrac | Friction Reducer | Ammonium chloride | 12125-02-9 | 100 | 0.0829 | N/A | |
Distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0829 | N/A | ||||
Non-Hazardous Ingredients | Trade Secret | 100 | 0.0829 | N/A | ||||
2 | 30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 17.2221 | N/A | |
3 | 40/70 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 4.3514 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2018-04-28 | 2018-05-18 | Recycled Fracturing Water (treated at well site) | 641 |
2018-04-28 | 2018-05-18 | Recycled Fracturing Water (treated at well site) | 693 |
2018-06-22 | 2018-07-08 | Surface Water - Runoff | 10815 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2018 | 2256 | 0.0 | 0.0 | 0.0 |
2019 | 8116 | 0.0 | 0.0 | 0.0 |
2020 | 2117 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-04-10 | No Incident Encountered | 0.00 | 0.00 |
2018-07-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]