X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786113013000

Well Details

Well ID: 0786113013000
Loading map...
Location: 00/13-30-078-11W6/0
Location Alias: 00/13-30-78-11 W6M
Location Alias 2: 00/13-30-078-11 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 11
Section: 30
County/Municipality: Saddle Hills County
Well Name: BIR 14-36 HZ PCOUPES 13-30-78-11
Operator Name: Birchcliff Energy Ltd.
License Number: 0487779
License Date: 2018-01-23
License Status: Issued
Spud Date: 2018-04-10
Final Drill Date: 2018-04-21
Well Total Depth: 4187.00 m
Surface Hole Latitude: 55.807201
Surface Hole Longitude: -119.726158

For data sources see[1][2]

Well History

Date Event
2018-01-23 Obtained License
2018-04-12 Surface Casing Operation Performed
2018-04-13 Direction Drilling Operation Performed - Deviate
2018-04-17 Direction Drilling Operation Performed - Horizontal
2018-04-17 Well Log Performed
2018-04-21 Finished Drilling
2018-04-21 Production Casing Operation Performed
2018-04-21 Well Log Performed
2018-04-21 Well Mode changed to Drilled and Cased
2018-04-23 Rig Released
2018-06-11 Perforation Treatment Performed - Jet Perforation
2018-06-21 Perforation Treatment Performed - Jet Perforation
2018-06-21 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-22 Perforation Treatment Performed - Jet Perforation
2018-06-22 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-27 Perforation Treatment Performed - Jet Perforation
2018-06-27 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-28 Perforation Treatment Performed - Jet Perforation
2018-06-28 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-29 Perforation Treatment Performed - Jet Perforation
2018-06-29 Perforation Treatment Performed - Multi-Stage Fracture
2018-06-30 Perforation Treatment Performed - Jet Perforation
2018-06-30 Perforation Treatment Performed - Multi-Stage Fracture
2018-07-01 Perforation Treatment Performed - Jet Perforation
2018-07-01 Perforation Treatment Performed - Multi-Stage Fracture
2018-07-22 Well Log Performed
2018-08-12 Well Began Production
2018-08-12 Well Fluid changed to Crude Oil
2018-08-12 Well Mode changed to Flowing
2019-04-28 Well Fluid changed to Crude Oil
2019-04-28 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-04-10 Ensign Drilling Inc. 555 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-04-13 816.30 Deviate (5 - 79 degrees)
2018-04-17 2190.10 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-06-11 Perforation 4138.00 4139.00 12
2018-06-22 Perforation 3941.50 3941.80 3
2018-06-22 Multi-Stage Fracture 3941.50 4016.80 0
2018-06-22 Perforation 3916.50 3916.80 3
2018-06-22 Perforation 3891.50 3891.80 3
2018-06-22 Perforation 3866.50 3866.80 3
2018-06-22 Perforation 3841.50 3841.80 3
2018-06-27 Multi-Stage Fracture 3841.50 3916.80 0
2018-06-27 Perforation 3816.50 3816.80 3
2018-06-27 Perforation 3791.50 3791.80 3
2018-06-27 Perforation 3766.50 3766.80 3
2018-06-21 Perforation 4116.50 4116.80 3
2018-06-27 Perforation 3741.50 3741.80 3
2018-06-27 Multi-Stage Fracture 3741.50 3816.80 0
2018-06-27 Perforation 3716.50 3716.80 3
2018-06-27 Perforation 3691.50 3691.80 3
2018-06-27 Perforation 3666.50 3666.80 3
2018-06-27 Perforation 3641.50 3641.80 3
2018-06-28 Multi-Stage Fracture 3641.50 3716.80 0
2018-06-28 Perforation 3616.50 3616.80 3
2018-06-28 Perforation 3591.50 3591.80 3
2018-06-28 Perforation 3566.50 3566.80 3
2018-06-21 Perforation 4091.50 4091.80 3
2018-06-28 Perforation 3541.50 3541.80 3
2018-06-28 Multi-Stage Fracture 3541.50 3616.80 0
2018-06-28 Perforation 3516.50 3516.80 3
2018-06-28 Perforation 3491.50 3491.80 3
2018-06-28 Perforation 3466.50 3466.80 3
2018-06-28 Perforation 3441.50 3441.80 3
2018-06-28 Multi-Stage Fracture 3441.50 3516.80 0
2018-06-28 Perforation 3416.50 3416.80 3
2018-06-28 Perforation 3391.50 3391.80 3
2018-06-28 Perforation 3366.50 3366.80 3
2018-06-21 Perforation 4066.50 4066.80 3
2018-06-28 Perforation 3341.50 3341.80 3
2018-06-28 Multi-Stage Fracture 3341.50 3416.80 0
2018-06-29 Perforation 3316.50 3316.80 3
2018-06-29 Perforation 3291.50 3291.80 3
2018-06-29 Perforation 3266.50 3266.80 3
2018-06-29 Perforation 3241.50 3241.80 3
2018-06-29 Multi-Stage Fracture 3241.50 3316.80 0
2018-06-29 Perforation 3216.50 3216.80 3
2018-06-29 Perforation 3191.50 3191.80 3
2018-06-29 Perforation 3166.50 3166.80 3
2018-06-21 Perforation 4041.50 4041.80 3
2018-06-29 Perforation 3141.50 3141.80 3
2018-06-29 Multi-Stage Fracture 3141.50 3216.80 0
2018-06-29 Perforation 3116.50 3116.80 3
2018-06-29 Perforation 3091.50 3091.80 3
2018-06-29 Perforation 3066.50 3066.80 3
2018-06-29 Perforation 3041.50 3041.80 3
2018-06-29 Multi-Stage Fracture 3041.50 3116.80 0
2018-06-29 Perforation 3016.50 3016.80 3
2018-06-29 Perforation 2991.50 2991.80 3
2018-06-29 Perforation 2966.50 2966.80 3
2018-06-21 Multi-Stage Fracture 4041.50 4116.80 0
2018-06-29 Perforation 2941.50 2941.60 3
2018-06-29 Multi-Stage Fracture 2941.50 3016.80 0
2018-06-29 Perforation 2916.50 2916.80 3
2018-06-29 Perforation 2891.50 2891.80 3
2018-06-29 Perforation 2866.50 2866.80 3
2018-06-29 Perforation 2841.50 2841.80 3
2018-06-29 Multi-Stage Fracture 2841.50 2916.80 0
2018-06-29 Perforation 2816.50 2816.80 3
2018-06-29 Perforation 2791.50 2791.80 3
2018-06-29 Perforation 2766.50 2766.80 3
2018-06-22 Perforation 4016.50 4016.80 3
2018-06-29 Perforation 2741.40 2741.80 3
2018-06-30 Multi-Stage Fracture 2741.50 2816.80 0
2018-06-30 Perforation 2716.50 2716.80 3
2018-06-30 Perforation 2691.50 2691.80 3
2018-06-30 Perforation 2666.50 2666.80 3
2018-06-30 Perforation 2641.50 2641.80 3
2018-06-30 Multi-Stage Fracture 2641.50 2716.80 0
2018-06-30 Perforation 2616.50 2616.80 3
2018-06-30 Perforation 2591.50 2591.80 3
2018-06-30 Perforation 2566.50 2566.80 3
2018-06-22 Perforation 3991.50 3991.80 3
2018-06-30 Perforation 2541.50 2541.80 3
2018-06-30 Multi-Stage Fracture 2541.50 2616.80 0
2018-06-30 Perforation 2516.50 2516.80 3
2018-06-30 Perforation 2491.50 2491.80 3
2018-06-30 Perforation 2466.50 2466.80 3
2018-06-30 Perforation 2441.50 2441.80 3
2018-07-01 Multi-Stage Fracture 2441.50 2516.80 0
2018-07-01 Perforation 2416.50 2416.80 3
2018-07-01 Perforation 2391.50 2391.80 3
2018-07-01 Perforation 2366.50 2366.80 3
2018-06-22 Perforation 3966.50 3966.80 3
2018-07-01 Perforation 2341.50 2341.80 3
2018-07-01 Multi-Stage Fracture 2341.50 2416.80 0
2018-07-01 Perforation 2316.50 2316.80 3
2018-07-01 Perforation 2291.50 2291.80 3
2018-07-01 Perforation 2266.50 2266.80 3
2018-07-01 Perforation 2241.50 2241.80 3
2018-07-01 Multi-Stage Fracture 2241.50 2316.80 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 2207 0.0 0.0 0.0
2019 7518 0.0 0.0 0.0
2020 2164 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-04-23 No Incident Encountered 0.00 0.00
2018-07-22 No Incident Encountered 0.00 0.00

For data sources see[8]

References