X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786113009020

Well Details

Well ID: 0786113009020
Loading map...
Location: 02/09-30-078-11W6/0
Location Alias: 02/09-30-78-11 W6M
Location Alias 2: 02/09-30-078-11 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 11
Section: 30
County/Municipality: Saddle Hills County
Well Name: BIR 102 PCOUPES 9-30-78-11
Operator Name: Birchcliff Energy Ltd.
License Number: 0458472
License Date: 2013-08-09
License Status: Amended
Spud Date: 2013-11-28
Final Drill Date: 2013-12-19
Well Total Depth: 5817.00 m
Surface Hole Latitude: 55.767518
Surface Hole Longitude: -119.645968

For data sources see[1][2]

Well History

Date Event
2013-08-09 Obtained License
2013-11-28 Direction Drilling Operation Performed - Deviate
2013-11-29 Surface Casing Operation Performed
2013-12-06 Direction Drilling Operation Performed - Horizontal
2013-12-07 Intermediate Casing Operation Performed
2013-12-09 Well Log Performed
2013-12-10 Well Log Performed
2013-12-19 Finished Drilling
2013-12-19 Well Mode changed to Drilled and Cased
2013-12-20 Well Log Performed
2013-12-21 Well Log Performed
2014-01-01 Liner Casing Operation Performed
2014-01-02 Rig Released
2014-05-01 Well Log Performed
2014-05-12 Perforation Treatment Performed - Multi-Stage Fracture
2014-05-13 Perforation Treatment Performed - Multi-Stage Fracture
2014-05-14 Perforation Treatment Performed - Multi-Stage Fracture
2014-05-15 Perforation Treatment Performed - Multi-Stage Fracture
2014-07-19 Well Began Production
2014-07-19 Well Fluid changed to Crude Oil
2014-07-19 Well Mode changed to Flowing
2019-03-01 Well Fluid changed to Crude Oil
2019-03-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-11-28 Trinidad Drilling Ltd. 45E N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-11-28 160.00 Deviate (5 - 79 degrees)
2013-12-06 2364.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-05-12 Multi-Stage Fracture 5753.40 5768.20 0
2014-05-13 Multi-Stage Fracture 4870.60 4871.90 0
2014-05-13 Multi-Stage Fracture 4759.90 4761.10 0
2014-05-13 Multi-Stage Fracture 4661.40 4662.60 0
2014-05-13 Multi-Stage Fracture 4562.20 4563.40 0
2014-05-13 Multi-Stage Fracture 4466.10 4467.40 0
2014-05-13 Multi-Stage Fracture 4371.30 4372.50 0
2014-05-14 Multi-Stage Fracture 4274.40 4275.70 0
2014-05-14 Multi-Stage Fracture 4177.80 4179.00 0
2014-05-14 Multi-Stage Fracture 4067.20 4068.50 0
2014-05-14 Multi-Stage Fracture 3969.90 3971.10 0
2014-05-12 Multi-Stage Fracture 5656.40 5657.60 0
2014-05-14 Multi-Stage Fracture 3873.40 3874.60 0
2014-05-14 Multi-Stage Fracture 3776.30 3777.50 0
2014-05-14 Multi-Stage Fracture 3679.50 3680.70 0
2014-05-14 Multi-Stage Fracture 3582.50 3583.80 0
2014-05-14 Multi-Stage Fracture 3472.20 3473.50 0
2014-05-14 Multi-Stage Fracture 3374.50 3375.70 0
2014-05-14 Multi-Stage Fracture 3277.30 3278.50 0
2014-05-14 Multi-Stage Fracture 3180.30 3181.60 0
2014-05-14 Multi-Stage Fracture 3084.10 3085.30 0
2014-05-14 Multi-Stage Fracture 2975.60 2976.90 0
2014-05-12 Multi-Stage Fracture 5561.70 5562.90 0
2014-05-14 Multi-Stage Fracture 2880.90 2882.20 0
2014-05-14 Multi-Stage Fracture 2787.70 2788.90 0
2014-05-15 Multi-Stage Fracture 2690.50 2691.70 0
2014-05-15 Multi-Stage Fracture 2584.40 2585.70 0
2014-05-15 Multi-Stage Fracture 2488.00 2489.20 0
2014-05-12 Multi-Stage Fracture 5457.70 5458.90 0
2014-05-12 Multi-Stage Fracture 5364.30 5365.50 0
2014-05-12 Multi-Stage Fracture 5268.80 5270.00 0
2014-05-13 Multi-Stage Fracture 5158.40 5159.60 0
2014-05-13 Multi-Stage Fracture 5062.40 5063.60 0
2014-05-13 Multi-Stage Fracture 4967.00 4968.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-05-12 2014-05-15 2,167 13,763 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 79.263 N/A
Prime Plus 30/50 Trican hexamethylenetetramine 100-97-0 100 3.3514 N/A
silica crystalline 14808-60-7 100 3.3514 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 17.3257 N/A
ASPEN-FR-27 Aspen Polymers Friction Reducer Ethylene Glycol 107-21-1 100 0.0017 N/A
Non-Hazardous Not Available 100 0.058 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-05-12 2014-05-12 Surface Water - Runoff 13583

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 3663 0.0 0.0 0.0
2015 8439 0.0 0.0 0.0
2016 8332 0.0 0.0 0.0
2017 8249 0.0 0.0 0.0
2018 8620 0.0 0.0 0.0
2019 8110 0.0 0.0 0.0
2020 2150 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-01-02 No Incident Encountered 0.00 0.00
2014-05-22 No Incident Encountered 0.00 0.00

For data sources see[10]

References