If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786113007030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.767068,"lon":-119.645938,"icon":""}]} |
Location: 03/07-30-078-11W6/0 | |
Location Alias: 03/07-30-78-11 W6M | |
Location Alias 2: 03/07-30-078-11 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 11 | |
Section: 30 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 103 PCOUPES 7-30-78-11 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0461268 | |
License Date: 2013-11-20 | |
License Status: Amended | |
Spud Date: 2014-03-23 | |
Final Drill Date: 2014-04-08 | |
Well Total Depth: 5308.00 m | |
Surface Hole Latitude: 55.767068 | |
Surface Hole Longitude: -119.645938 |
Date | Event |
---|---|
2013-11-20 | Obtained License |
2014-03-24 | Direction Drilling Operation Performed - Deviate |
2014-03-24 | Surface Casing Operation Performed |
2014-03-29 | Direction Drilling Operation Performed - Horizontal |
2014-03-30 | Intermediate Casing Operation Performed |
2014-04-08 | Finished Drilling |
2014-04-08 | Well Mode changed to Drilled and Cased |
2014-04-10 | Perforation Treatment Performed - Open-Hole Completion |
2014-04-10 | Production Casing Operation Performed |
2014-04-11 | Rig Released |
2014-04-30 | Well Log Performed |
2014-05-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-05-19 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-05-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-07-16 | Well Began Production |
2014-07-16 | Well Fluid changed to Crude Oil |
2014-07-16 | Well Mode changed to Flowing |
2019-03-01 | Well Fluid changed to Crude Oil |
2019-03-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-03-23 | Trinidad Drilling Ltd. | 45 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-03-24 | 135.00 | Deviate (5 - 79 degrees) |
2014-03-29 | 2486.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-04-10 | Open Hole/Barefoot Completion | 5298.00 | 5308.00 | 0 |
2014-05-19 | Multi-Stage Fracture | 4610.10 | 4611.40 | 0 |
2014-05-19 | Multi-Stage Fracture | 4525.90 | 4527.20 | 0 |
2014-05-19 | Multi-Stage Fracture | 4453.10 | 4454.40 | 0 |
2014-05-19 | Multi-Stage Fracture | 4366.90 | 4368.10 | 0 |
2014-05-19 | Multi-Stage Fracture | 4280.50 | 4281.70 | 0 |
2014-05-19 | Multi-Stage Fracture | 4208.50 | 4209.80 | 0 |
2014-05-19 | Multi-Stage Fracture | 4122.10 | 4123.40 | 0 |
2014-05-19 | Multi-Stage Fracture | 4049.50 | 4050.80 | 0 |
2014-05-20 | Multi-Stage Fracture | 3963.10 | 3964.30 | 0 |
2014-05-20 | Multi-Stage Fracture | 3876.80 | 3878.00 | 0 |
2014-05-18 | Multi-Stage Fracture | 5244.30 | 5260.00 | 0 |
2014-05-20 | Multi-Stage Fracture | 3805.00 | 3806.30 | 0 |
2014-05-20 | Multi-Stage Fracture | 3718.50 | 3719.70 | 0 |
2014-05-20 | Multi-Stage Fracture | 3645.60 | 3646.80 | 0 |
2014-05-20 | Multi-Stage Fracture | 3559.00 | 3560.20 | 0 |
2014-05-20 | Multi-Stage Fracture | 3473.20 | 3474.70 | 0 |
2014-05-20 | Multi-Stage Fracture | 3400.40 | 3401.60 | 0 |
2014-05-20 | Multi-Stage Fracture | 3313.70 | 3315.00 | 0 |
2014-05-20 | Multi-Stage Fracture | 3241.00 | 3242.20 | 0 |
2014-05-20 | Multi-Stage Fracture | 3154.40 | 3155.60 | 0 |
2014-05-20 | Multi-Stage Fracture | 3081.50 | 3082.70 | 0 |
2014-05-18 | Multi-Stage Fracture | 5171.50 | 5172.70 | 0 |
2014-05-20 | Multi-Stage Fracture | 2995.10 | 2996.40 | 0 |
2014-05-20 | Multi-Stage Fracture | 2922.60 | 2923.80 | 0 |
2014-05-20 | Multi-Stage Fracture | 2836.00 | 2837.70 | 0 |
2014-05-20 | Multi-Stage Fracture | 2749.60 | 2750.80 | 0 |
2014-05-20 | Multi-Stage Fracture | 2676.70 | 2677.90 | 0 |
2014-05-20 | Multi-Stage Fracture | 2590.10 | 2591.30 | 0 |
2014-05-18 | Multi-Stage Fracture | 5085.50 | 5086.70 | 0 |
2014-05-18 | Multi-Stage Fracture | 5013.70 | 5014.90 | 0 |
2014-05-18 | Multi-Stage Fracture | 4927.80 | 4929.10 | 0 |
2014-05-19 | Multi-Stage Fracture | 4855.40 | 4856.60 | 0 |
2014-05-19 | Multi-Stage Fracture | 4769.30 | 4770.60 | 0 |
2014-05-19 | Multi-Stage Fracture | 4683.00 | 4684.20 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-05-18 | 2014-05-20 | 2,184 | 13,700 | N/A |
2 | 2014-05-18 | 2014-05-18 | 2,184 | 0 | N/A |
3 | 2014-05-19 | 2014-05-19 | 2,184 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | 7732-18-5 | 100 | 79.2155 | N/A | |||
Prime Plus 30/50 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 5.4474 | N/A | ||
silica crystalline | 14808-60-7 | 100 | 5.4474 | N/A | ||||
Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 15.3812 | N/A | ||
ASPEN-FR-27 | Aspen Polymers | Friction Reducer | Ethylene Glycol | 107-21-1 | 100 | 0.0017 | N/A | |
Non-Hazardous | Not Available | 100 | 0.0561 | N/A | ||||
2 | Garnet 30/50 | Trican | polyurethane resin | Not Available | 100 | 4.4987 | N/A | |
silica crystalline | 14808-60-7 | 100 | 4.4987 | N/A | ||||
3 | PRC Premium 30/50 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 2.9208 | N/A | |
phenolic resin | 9003-35-4 | 100 | 2.9208 | N/A | ||||
silica crystalline | 14808-60-7 | 100 | 2.9207 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-05-19 | 2014-05-19 | Surface Water - Runoff | 13701 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 2985 | 0.0 | 0.0 | 0.0 |
2015 | 8089 | 0.0 | 0.0 | 0.0 |
2016 | 8466 | 0.0 | 0.0 | 0.0 |
2017 | 7087 | 0.0 | 0.0 | 0.0 |
2018 | 8566 | 0.0 | 0.0 | 0.0 |
2019 | 8303 | 0.0 | 0.0 | 0.0 |
2020 | 2163 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-04-11 | No Incident Encountered | 0.00 | 0.00 |
2014-05-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]