If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786113007020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.767248,"lon":-119.645949,"icon":""}]} |
Location: 02/07-30-078-11W6/0 | |
Location Alias: 02/07-30-78-11 W6M | |
Location Alias 2: 02/07-30-078-11 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 11 | |
Section: 30 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR 102 PCOUPES 7-30-78-11 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0461267 | |
License Date: 2013-11-20 | |
License Status: Amended | |
Spud Date: 2014-02-13 | |
Final Drill Date: 2014-03-02 | |
Well Total Depth: 5775.00 m | |
Surface Hole Latitude: 55.767248 | |
Surface Hole Longitude: -119.645949 |
Date | Event |
---|---|
2013-11-20 | Obtained License |
2014-02-14 | Surface Casing Operation Performed |
2014-02-16 | Direction Drilling Operation Performed - Deviate |
2014-02-19 | Direction Drilling Operation Performed - Horizontal |
2014-02-20 | Intermediate Casing Operation Performed |
2014-03-02 | Finished Drilling |
2014-03-02 | Well Mode changed to Drilled and Cased |
2014-03-04 | Liner Casing Operation Performed |
2014-03-04 | Perforation Treatment Performed - Open-Hole Completion |
2014-03-05 | Rig Released |
2014-05-02 | Well Log Performed |
2014-05-15 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-05-16 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-05-17 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-05-18 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-07-17 | Well Began Production |
2014-07-17 | Well Fluid changed to Crude Oil |
2014-07-17 | Well Mode changed to Flowing |
2019-03-01 | Well Fluid changed to Crude Oil |
2019-03-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-02-13 | Trinidad Drilling Ltd. | 45 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-02-16 | 1330.00 | Deviate (5 - 79 degrees) |
2014-02-19 | 2332.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-03-04 | Open Hole/Barefoot Completion | 5765.00 | 5775.00 | 0 |
2014-05-16 | Multi-Stage Fracture | 4929.30 | 4930.60 | 0 |
2014-05-16 | Multi-Stage Fracture | 4819.40 | 4820.60 | 0 |
2014-05-16 | Multi-Stage Fracture | 4721.00 | 4722.20 | 0 |
2014-05-16 | Multi-Stage Fracture | 4624.80 | 4626.10 | 0 |
2014-05-16 | Multi-Stage Fracture | 4529.00 | 4530.20 | 0 |
2014-05-16 | Multi-Stage Fracture | 4433.80 | 4435.00 | 0 |
2014-05-16 | Multi-Stage Fracture | 4327.60 | 4328.90 | 0 |
2014-05-17 | Multi-Stage Fracture | 4229.50 | 4230.70 | 0 |
2014-05-17 | Multi-Stage Fracture | 4134.60 | 4135.80 | 0 |
2014-05-17 | Multi-Stage Fracture | 4036.00 | 4037.20 | 0 |
2014-05-15 | Multi-Stage Fracture | 5712.90 | 5728.60 | 0 |
2014-05-17 | Multi-Stage Fracture | 3939.80 | 3941.00 | 0 |
2014-05-17 | Multi-Stage Fracture | 3842.90 | 3844.20 | 0 |
2014-05-17 | Multi-Stage Fracture | 3746.20 | 3747.40 | 0 |
2014-05-17 | Multi-Stage Fracture | 3647.50 | 3648.80 | 0 |
2014-05-17 | Multi-Stage Fracture | 3548.40 | 3549.60 | 0 |
2014-05-17 | Multi-Stage Fracture | 3450.30 | 3451.50 | 0 |
2014-05-17 | Multi-Stage Fracture | 3352.60 | 3353.90 | 0 |
2014-05-17 | Multi-Stage Fracture | 3252.10 | 3253.40 | 0 |
2014-05-17 | Multi-Stage Fracture | 3157.80 | 3159.10 | 0 |
2014-05-17 | Multi-Stage Fracture | 3048.80 | 3050.00 | 0 |
2014-05-15 | Multi-Stage Fracture | 5616.40 | 5617.60 | 0 |
2014-05-17 | Multi-Stage Fracture | 2951.50 | 2952.80 | 0 |
2014-05-17 | Multi-Stage Fracture | 2866.00 | 2867.20 | 0 |
2014-05-17 | Multi-Stage Fracture | 2758.20 | 2759.40 | 0 |
2014-05-18 | Multi-Stage Fracture | 2661.20 | 2662.40 | 0 |
2014-05-18 | Multi-Stage Fracture | 2564.10 | 2565.30 | 0 |
2014-05-18 | Multi-Stage Fracture | 2466.40 | 2467.70 | 0 |
2014-05-15 | Multi-Stage Fracture | 5517.80 | 5519.10 | 0 |
2014-05-15 | Multi-Stage Fracture | 5418.50 | 5419.70 | 0 |
2014-05-16 | Multi-Stage Fracture | 5322.00 | 5323.20 | 0 |
2014-05-16 | Multi-Stage Fracture | 5222.40 | 5223.60 | 0 |
2014-05-16 | Multi-Stage Fracture | 5125.40 | 5126.60 | 0 |
2014-05-16 | Multi-Stage Fracture | 5026.90 | 5028.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-05-15 | 2014-05-18 | 2,178 | 14,117 | N/A |
2 | 2014-05-16 | 2014-05-18 | 2,178 | 0 | N/A |
3 | 2014-05-15 | 2014-05-17 | 2,178 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | 7732-18-5 | 100 | 79.0238 | N/A | |||
Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 15.7798 | N/A | ||
ASPEN-FR-27 | Aspen Polymers | Friction Reducer | Ethylene Glycol | 107-21-1 | 100 | 0.0016 | N/A | |
Non-Hazardous | Not Available | 100 | 0.0548 | N/A | ||||
2 | Garnet 30/50 | Trican | polyurethane resin | Not Available | 100 | 5.654 | N/A | |
silica crystalline | 14808-60-7 | 100 | 5.654 | N/A | ||||
3 | Prime Plus 30/50 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 5.161 | N/A | |
silica crystalline | 14808-60-7 | 100 | 5.161 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-05-15 | 2014-05-15 | Surface Water - Runoff | 13726 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 3403 | 0.0 | 0.0 | 0.0 |
2015 | 8527 | 0.0 | 0.0 | 0.0 |
2016 | 8512 | 0.0 | 0.0 | 0.0 |
2017 | 7749 | 0.0 | 0.0 | 0.0 |
2018 | 8651 | 0.0 | 0.0 | 0.0 |
2019 | 8456 | 0.0 | 0.0 | 0.0 |
2020 | 2092 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-03-05 | No Incident Encountered | 0.00 | 0.00 |
2014-05-22 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]