X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786113007020

Well Details

Well ID: 0786113007020
Loading map...
Location: 02/07-30-078-11W6/0
Location Alias: 02/07-30-78-11 W6M
Location Alias 2: 02/07-30-078-11 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 11
Section: 30
County/Municipality: Saddle Hills County
Well Name: BIR 102 PCOUPES 7-30-78-11
Operator Name: Birchcliff Energy Ltd.
License Number: 0461267
License Date: 2013-11-20
License Status: Amended
Spud Date: 2014-02-13
Final Drill Date: 2014-03-02
Well Total Depth: 5775.00 m
Surface Hole Latitude: 55.767248
Surface Hole Longitude: -119.645949

For data sources see[1][2]

Well History

Date Event
2013-11-20 Obtained License
2014-02-14 Surface Casing Operation Performed
2014-02-16 Direction Drilling Operation Performed - Deviate
2014-02-19 Direction Drilling Operation Performed - Horizontal
2014-02-20 Intermediate Casing Operation Performed
2014-03-02 Finished Drilling
2014-03-02 Well Mode changed to Drilled and Cased
2014-03-04 Liner Casing Operation Performed
2014-03-04 Perforation Treatment Performed - Open-Hole Completion
2014-03-05 Rig Released
2014-05-02 Well Log Performed
2014-05-15 Perforation Treatment Performed - Multi-Stage Fracture
2014-05-16 Perforation Treatment Performed - Multi-Stage Fracture
2014-05-17 Perforation Treatment Performed - Multi-Stage Fracture
2014-05-18 Perforation Treatment Performed - Multi-Stage Fracture
2014-07-17 Well Began Production
2014-07-17 Well Fluid changed to Crude Oil
2014-07-17 Well Mode changed to Flowing
2019-03-01 Well Fluid changed to Crude Oil
2019-03-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-02-13 Trinidad Drilling Ltd. 45 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-02-16 1330.00 Deviate (5 - 79 degrees)
2014-02-19 2332.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-03-04 Open Hole/Barefoot Completion 5765.00 5775.00 0
2014-05-16 Multi-Stage Fracture 4929.30 4930.60 0
2014-05-16 Multi-Stage Fracture 4819.40 4820.60 0
2014-05-16 Multi-Stage Fracture 4721.00 4722.20 0
2014-05-16 Multi-Stage Fracture 4624.80 4626.10 0
2014-05-16 Multi-Stage Fracture 4529.00 4530.20 0
2014-05-16 Multi-Stage Fracture 4433.80 4435.00 0
2014-05-16 Multi-Stage Fracture 4327.60 4328.90 0
2014-05-17 Multi-Stage Fracture 4229.50 4230.70 0
2014-05-17 Multi-Stage Fracture 4134.60 4135.80 0
2014-05-17 Multi-Stage Fracture 4036.00 4037.20 0
2014-05-15 Multi-Stage Fracture 5712.90 5728.60 0
2014-05-17 Multi-Stage Fracture 3939.80 3941.00 0
2014-05-17 Multi-Stage Fracture 3842.90 3844.20 0
2014-05-17 Multi-Stage Fracture 3746.20 3747.40 0
2014-05-17 Multi-Stage Fracture 3647.50 3648.80 0
2014-05-17 Multi-Stage Fracture 3548.40 3549.60 0
2014-05-17 Multi-Stage Fracture 3450.30 3451.50 0
2014-05-17 Multi-Stage Fracture 3352.60 3353.90 0
2014-05-17 Multi-Stage Fracture 3252.10 3253.40 0
2014-05-17 Multi-Stage Fracture 3157.80 3159.10 0
2014-05-17 Multi-Stage Fracture 3048.80 3050.00 0
2014-05-15 Multi-Stage Fracture 5616.40 5617.60 0
2014-05-17 Multi-Stage Fracture 2951.50 2952.80 0
2014-05-17 Multi-Stage Fracture 2866.00 2867.20 0
2014-05-17 Multi-Stage Fracture 2758.20 2759.40 0
2014-05-18 Multi-Stage Fracture 2661.20 2662.40 0
2014-05-18 Multi-Stage Fracture 2564.10 2565.30 0
2014-05-18 Multi-Stage Fracture 2466.40 2467.70 0
2014-05-15 Multi-Stage Fracture 5517.80 5519.10 0
2014-05-15 Multi-Stage Fracture 5418.50 5419.70 0
2014-05-16 Multi-Stage Fracture 5322.00 5323.20 0
2014-05-16 Multi-Stage Fracture 5222.40 5223.60 0
2014-05-16 Multi-Stage Fracture 5125.40 5126.60 0
2014-05-16 Multi-Stage Fracture 5026.90 5028.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-05-15 2014-05-18 2,178 14,117 N/A
2 2014-05-16 2014-05-18 2,178 0 N/A
3 2014-05-15 2014-05-17 2,178 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 79.0238 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 15.7798 N/A
ASPEN-FR-27 Aspen Polymers Friction Reducer Ethylene Glycol 107-21-1 100 0.0016 N/A
Non-Hazardous Not Available 100 0.0548 N/A
2 Garnet 30/50 Trican polyurethane resin Not Available 100 5.654 N/A
silica crystalline 14808-60-7 100 5.654 N/A
3 Prime Plus 30/50 Trican hexamethylenetetramine 100-97-0 100 5.161 N/A
silica crystalline 14808-60-7 100 5.161 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-05-15 2014-05-15 Surface Water - Runoff 13726

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 3403 0.0 0.0 0.0
2015 8527 0.0 0.0 0.0
2016 8512 0.0 0.0 0.0
2017 7749 0.0 0.0 0.0
2018 8651 0.0 0.0 0.0
2019 8456 0.0 0.0 0.0
2020 2092 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-03-05 No Incident Encountered 0.00 0.00
2014-05-22 No Incident Encountered 0.00 0.00

For data sources see[10]

References