X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786112914030

Well Details

Well ID: 0786112914030
Loading map...
Location: 03/14-29-078-11W6/0
Location Alias: 03/14-29-78-11 W6M
Location Alias 2: 03/14-29-078-11 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 11
Section: 29
County/Municipality: Saddle Hills County
Well Name: BIR 103 PCOUPES 14-29-78-11
Operator Name: Birchcliff Energy Ltd.
License Number: 0449721
License Date: 2012-11-02
License Status: Issued
Spud Date: 2012-12-17
Final Drill Date: 2013-01-06
Well Total Depth: 5095.00 m
Surface Hole Latitude: 55.774808
Surface Hole Longitude: -119.635442

For data sources see[1][2]

Well History

Date Event
2012-11-02 Obtained License
2012-12-18 Surface Casing Operation Performed
2012-12-23 Direction Drilling Operation Performed - Deviate
2012-12-26 Intermediate Casing Operation Performed
2012-12-28 Direction Drilling Operation Performed - Horizontal
2013-01-06 Finished Drilling
2013-01-06 Well Log Performed
2013-01-06 Well Mode changed to Drilled and Cased
2013-01-08 Liner Casing Operation Performed
2013-01-09 Perforation Treatment Performed - Open-Hole Completion
2013-01-09 Rig Released
2013-05-22 Perforation Treatment Performed - Multi-Stage Fracture
2013-05-23 Perforation Treatment Performed - Multi-Stage Fracture
2013-06-01 Perforation Treatment Performed - Multi-Stage Fracture
2013-06-02 Perforation Treatment Performed - Multi-Stage Fracture
2013-06-03 Perforation Treatment Performed - Multi-Stage Fracture
2013-10-04 Well Began Production
2013-10-04 Well Fluid changed to Crude Oil
2013-10-04 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-12-16 Trinidad Drilling Ltd. 49 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-12-23 1875.00 Deviate (5 - 79 degrees)
2012-12-28 2230.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-01-09 Open Hole/Barefoot Completion 5090.00 5095.00 0
2013-06-01 Multi-Stage Fracture 4267.10 4268.40 0
2013-06-01 Multi-Stage Fracture 4180.10 4181.30 0
2013-06-01 Multi-Stage Fracture 4079.20 4080.40 0
2013-06-02 Multi-Stage Fracture 3978.30 3979.60 0
2013-06-02 Multi-Stage Fracture 3891.30 3892.50 0
2013-06-02 Multi-Stage Fracture 3790.70 3791.90 0
2013-06-02 Multi-Stage Fracture 3703.60 3704.90 0
2013-06-02 Multi-Stage Fracture 3603.10 3604.40 0
2013-06-02 Multi-Stage Fracture 3502.30 3503.60 0
2013-06-02 Multi-Stage Fracture 3415.40 3416.70 0
2013-05-22 Multi-Stage Fracture 5034.40 5036.50 0
2013-06-02 Multi-Stage Fracture 3315.10 3316.40 0
2013-06-02 Multi-Stage Fracture 3228.20 3229.40 0
2013-06-02 Multi-Stage Fracture 3127.40 3128.70 0
2013-06-02 Multi-Stage Fracture 3026.90 3028.10 0
2013-06-02 Multi-Stage Fracture 2939.70 2940.90 0
2013-06-02 Multi-Stage Fracture 2838.80 2840.10 0
2013-06-03 Multi-Stage Fracture 2751.80 2753.00 0
2013-06-03 Multi-Stage Fracture 2651.10 2652.30 0
2013-06-03 Multi-Stage Fracture 2550.30 2551.50 0
2013-06-03 Multi-Stage Fracture 2463.20 2464.50 0
2013-05-22 Multi-Stage Fracture 4932.00 4933.30 0
2013-06-03 Multi-Stage Fracture 2362.80 2364.00 0
2013-06-03 Multi-Stage Fracture 2275.90 2277.10 0
2013-05-22 Multi-Stage Fracture 4844.80 4846.10 0
2013-05-23 Multi-Stage Fracture 4744.00 4745.30 0
2013-05-23 Multi-Stage Fracture 4656.90 4658.10 0
2013-05-23 Multi-Stage Fracture 4556.00 4557.20 0
2013-06-01 Multi-Stage Fracture 4455.20 4456.40 0
2013-06-01 Multi-Stage Fracture 4368.00 4369.20 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-05-22 2013-06-03 2,151 12,131 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 79.5348 N/A
Frac Sand - regular Trican silica crystalline 14808-60-7 100 20.4048 N/A
ASPEN-FR-27 Aspen Polymers Friction Reducer Ethylene Glycol 107-21-1 100 0.0636 N/A
Non-Hazardous Not Available 100 0.0636 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-05-22 2013-06-03 Surface Water - River 12399

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 1068 0.0 0.0 0.0
2014 6988 0.0 0.0 0.0
2015 8579 0.0 0.0 0.0
2016 8519 0.0 0.0 0.0
2017 8182 0.0 0.0 0.0
2018 8461 0.0 0.0 0.0
2019 7628 0.0 0.0 0.0
2020 2151 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-01-09 No Incident Encountered 0.00 0.00
2013-06-07 No Incident Encountered 0.00 0.00

For data sources see[10]

References