X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786112912020

Well Details

Well ID: 0786112912020
Loading map...
Location: 02/12-29-078-11W6/0
Location Alias: 02/12-29-78-11 W6M
Location Alias 2: 02/12-29-078-11 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 11
Section: 29
County/Municipality: Saddle Hills County
Well Name: BIR 102 PCOUPES 12-29-78-11
Operator Name: Birchcliff Energy Ltd.
License Number: 0449723
License Date: 2012-11-02
License Status: Issued
Spud Date: 2013-01-11
Final Drill Date: 2013-01-30
Well Total Depth: 5392.00 m
Surface Hole Latitude: 55.774736
Surface Hole Longitude: -119.635440

For data sources see[1][2]

Well History

Date Event
2012-11-02 Obtained License
2013-01-11 Direction Drilling Operation Performed - Deviate
2013-01-12 Surface Casing Operation Performed
2013-01-16 Direction Drilling Operation Performed - Deviate
2013-01-19 Intermediate Casing Operation Performed
2013-01-22 Direction Drilling Operation Performed - Horizontal
2013-01-30 Finished Drilling
2013-01-30 Well Log Performed
2013-01-30 Well Mode changed to Drilled and Cased
2013-01-31 Well Log Performed
2013-02-01 Liner Casing Operation Performed
2013-02-02 Perforation Treatment Performed - Open-Hole Completion
2013-02-02 Rig Released
2013-05-20 Perforation Treatment Performed - Multi-Stage Fracture
2013-05-21 Perforation Treatment Performed - Multi-Stage Fracture
2013-05-22 Perforation Treatment Performed - Multi-Stage Fracture
2013-10-08 Well Began Production
2013-10-08 Well Fluid changed to Crude Oil
2013-10-08 Well Mode changed to Flowing
2020-02-11 Well Fluid changed to Crude Oil
2020-02-11 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-01-10 Trinidad Drilling Ltd. 49 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-01-11 206.50 Deviate (5 - 79 degrees)
2013-01-16 1880.00 Deviate (5 - 79 degrees)
2013-01-22 2275.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-02-02 Open Hole/Barefoot Completion 5388.00 5392.00 0
2013-05-21 Multi-Stage Fracture 4484.60 4485.80 0
2013-05-21 Multi-Stage Fracture 4383.80 4385.00 0
2013-05-21 Multi-Stage Fracture 4269.30 4270.50 0
2013-05-21 Multi-Stage Fracture 4168.50 4169.80 0
2013-05-21 Multi-Stage Fracture 4067.70 4069.00 0
2013-05-21 Multi-Stage Fracture 3967.00 3968.20 0
2013-05-21 Multi-Stage Fracture 3852.40 3853.70 0
2013-05-21 Multi-Stage Fracture 3751.60 3752.80 0
2013-05-21 Multi-Stage Fracture 3650.80 3652.00 0
2013-05-21 Multi-Stage Fracture 3550.10 3551.30 0
2013-05-20 Multi-Stage Fracture 5319.60 5321.70 0
2013-05-21 Multi-Stage Fracture 3449.50 3450.70 0
2013-05-22 Multi-Stage Fracture 3335.10 3336.40 0
2013-05-22 Multi-Stage Fracture 3234.50 3235.70 0
2013-05-22 Multi-Stage Fracture 3133.90 3135.10 0
2013-05-22 Multi-Stage Fracture 3033.10 3034.30 0
2013-05-22 Multi-Stage Fracture 2832.90 2834.10 0
2013-05-22 Multi-Stage Fracture 2745.90 2747.10 0
2013-05-22 Multi-Stage Fracture 2645.10 2646.40 0
2013-05-22 Multi-Stage Fracture 2557.90 2559.20 0
2013-05-22 Multi-Stage Fracture 2471.00 2472.20 0
2013-05-20 Multi-Stage Fracture 5203.60 5204.80 0
2013-05-22 Multi-Stage Fracture 2370.20 2371.40 0
2013-05-22 Multi-Stage Fracture 2283.10 2284.40 0
2013-05-20 Multi-Stage Fracture 5102.90 5104.10 0
2013-05-20 Multi-Stage Fracture 5002.10 5003.30 0
2013-05-20 Multi-Stage Fracture 4901.30 4902.60 0
2013-05-20 Multi-Stage Fracture 4800.60 4801.90 0
2013-05-21 Multi-Stage Fracture 4686.20 4687.40 0
2013-05-21 Multi-Stage Fracture 4585.40 4586.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-05-20 2013-05-22 2,160 12,474 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 80.1566 N/A
Sand (40/70) Trican silica crystalline 14808-60-7 100 19.7872 N/A
ASPEN-FR-27 Aspen Polymers Friction Reducer Ethylene Glycol 107-21-1 100 0.0561 N/A
Non-Hazardous Not Available 100 0.0561 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-05-20 2013-05-22 Surface Water - River 12491

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 805 0.0 0.0 0.0
2014 5280 0.0 0.0 0.0
2015 8013 0.0 0.0 0.0
2016 8505 0.0 0.0 0.0
2017 8280 0.0 0.0 0.0
2018 8572 0.0 0.0 0.0
2019 6534 0.0 0.0 0.0
2020 1962 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-02-02 No Incident Encountered 0.00 0.00
2013-05-29 No Incident Encountered 0.00 0.00

For data sources see[10]

References