X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786112911000

Well Details

Well ID: 0786112911000
Loading map...
Location: 00/11-29-078-11W6/0
Location Alias: 00/11-29-78-11 W6M
Location Alias 2: 00/11-29-078-11 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 11
Section: 29
County/Municipality: Saddle Hills County
Well Name: BIR 9-21 HZ PCOUPES 11-29-78-11
Operator Name: Birchcliff Energy Ltd.
License Number: 0491495
License Date: 2018-10-19
License Status: Issued
Spud Date: 2019-01-01
Final Drill Date: 2019-01-14
Well Total Depth: 5226.00 m
Surface Hole Latitude: 55.775906
Surface Hole Longitude: -119.635364

For data sources see[1][2]

Well History

Date Event
2018-10-19 Obtained License
2019-01-02 Surface Casing Operation Performed
2019-01-03 Direction Drilling Operation Performed - Deviate
2019-01-07 Direction Drilling Operation Performed - Horizontal
2019-01-14 Finished Drilling
2019-01-14 Well Log Performed
2019-01-14 Well Mode changed to Drilled and Cased
2019-01-15 Production Casing Operation Performed
2019-01-15 Well Log Performed
2019-01-16 Rig Released
2019-03-16 Perforation Treatment Performed - Jet Perforation
2019-03-16 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-17 Perforation Treatment Performed - Jet Perforation
2019-03-17 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-18 Perforation Treatment Performed - Jet Perforation
2019-03-18 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-19 Perforation Treatment Performed - Jet Perforation
2019-03-19 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-20 Perforation Treatment Performed - Jet Perforation
2019-03-20 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-21 Perforation Treatment Performed - Jet Perforation
2019-03-21 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-22 Perforation Treatment Performed - Jet Perforation
2019-03-22 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-23 Perforation Treatment Performed - Jet Perforation
2019-03-23 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2019-03-24 Perforation Treatment Performed - Jet Perforation
2019-03-24 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-25 Perforation Treatment Performed - Jet Perforation
2019-03-25 Perforation Treatment Performed - Multi-Stage Fracture
2019-04-17 Well Log Performed
2019-04-19 Well Fluid changed to Crude Oil
2019-04-19 Well Mode changed to Drilling and Completing
2019-05-20 Well Began Production
2019-05-20 Well Fluid changed to Crude Oil
2019-05-20 Well Mode changed to Flowing
2020-02-12 Well Fluid changed to Crude Oil
2020-02-12 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-01-01 Trinidad Drilling Ltd. 60 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-01-03 581.60 Deviate (5 - 79 degrees)
2019-01-07 2279.90 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-03-16 Perforation 5094.50 5094.80 3
2019-03-16 Multi-Stage Fracture 4989.50 5034.80 0
2019-03-21 Multi-Stage Fracture 3909.50 3954.80 0
2019-03-21 Perforation 3894.50 3894.80 3
2019-03-21 Perforation 3879.50 3879.80 3
2019-03-21 Perforation 3864.50 3864.80 3
2019-03-21 Perforation 3849.50 3849.80 3
2019-03-21 Multi-Stage Fracture 3849.50 3894.80 0
2019-03-21 Perforation 3834.50 3834.80 3
2019-03-21 Perforation 3819.50 3819.80 3
2019-03-21 Perforation 3804.50 3804.80 3
2019-03-21 Perforation 3789.50 3789.80 3
2019-03-16 Perforation 4974.50 4974.80 3
2019-03-21 Multi-Stage Fracture 3789.50 3834.80 0
2019-03-21 Perforation 3774.50 3774.80 3
2019-03-21 Perforation 3759.50 3759.80 3
2019-03-21 Perforation 3744.50 3744.80 3
2019-03-21 Perforation 3729.50 3729.80 3
2019-03-21 Multi-Stage Fracture 3729.50 3774.80 0
2019-03-21 Perforation 3714.50 3714.80 3
2019-03-21 Perforation 3699.50 3699.80 3
2019-03-21 Perforation 3684.50 3684.80 3
2019-03-21 Perforation 3669.50 3669.80 3
2019-03-16 Perforation 4959.50 4959.80 3
2019-03-21 Multi-Stage Fracture 3669.50 3714.80 0
2019-03-21 Perforation 3654.50 3654.80 3
2019-03-21 Perforation 3639.50 3639.80 3
2019-03-21 Perforation 3624.50 3624.80 3
2019-03-21 Perforation 3609.50 3609.80 3
2019-03-21 Multi-Stage Fracture 3609.50 3654.80 0
2019-03-22 Perforation 3594.50 3594.80 3
2019-03-22 Perforation 3579.50 3579.80 3
2019-03-22 Perforation 3564.50 3564.80 3
2019-03-22 Perforation 3549.50 3549.80 3
2019-03-16 Perforation 4944.50 4944.80 3
2019-03-22 Multi-Stage Fracture 3549.50 3594.80 0
2019-03-22 Perforation 3534.50 3534.80 3
2019-03-22 Perforation 3519.50 3519.80 3
2019-03-22 Perforation 3504.50 3504.80 3
2019-03-22 Perforation 3489.50 3489.80 3
2019-03-22 Multi-Stage Fracture 3489.50 3534.80 0
2019-03-22 Perforation 3474.50 3474.80 3
2019-03-22 Perforation 3459.50 3459.80 3
2019-03-22 Perforation 3444.50 3444.80 3
2019-03-22 Perforation 3429.50 3429.80 3
2019-03-16 Perforation 4929.50 4929.80 3
2019-03-22 Multi-Stage Fracture 3429.50 3474.80 0
2019-03-22 Perforation 3414.50 3414.80 3
2019-03-22 Perforation 3399.50 3399.80 3
2019-03-22 Perforation 3384.50 3384.80 3
2019-03-22 Perforation 3369.50 3369.80 3
2019-03-22 Multi-Stage Fracture 3369.50 3414.80 0
2019-03-22 Perforation 3354.50 3354.80 3
2019-03-22 Perforation 3339.50 3339.80 3
2019-03-22 Perforation 3324.50 3324.80 3
2019-03-22 Perforation 3309.50 3309.80 3
2019-03-16 Multi-Stage Fracture 4929.50 4974.80 0
2019-03-22 Multi-Stage Fracture 3309.50 3354.80 0
2019-03-22 Perforation 3294.50 3294.80 3
2019-03-22 Perforation 3279.50 3279.80 3
2019-03-22 Perforation 3264.50 3264.80 3
2019-03-22 Perforation 3249.50 3249.80 3
2019-03-23 Multi-Stage Fracture 3249.50 3294.80 0
2019-03-23 Perforation 3234.50 3234.80 3
2019-03-23 Perforation 3219.50 3219.80 3
2019-03-23 Perforation 3204.50 3204.80 3
2019-03-23 Perforation 3189.50 3189.80 3
2019-03-16 Perforation 4914.50 4914.80 3
2019-03-23 Multi-Stage Fracture 3189.50 3234.80 0
2019-03-23 Perforation 3174.50 3174.80 3
2019-03-23 Perforation 3159.50 3159.80 3
2019-03-23 Perforation 3144.50 3144.80 3
2019-03-23 Perforation 3129.50 3129.80 3
2019-03-23 Multi-Stage Fracture 3129.50 3174.80 0
2019-03-23 Perforation 3114.50 3114.80 3
2019-03-23 Perforation 3099.50 3099.80 3
2019-03-23 Perforation 3084.50 3084.80 3
2019-03-23 Perforation 3069.50 3069.80 3
2019-03-16 Perforation 4899.50 4899.80 3
2019-03-23 Multi-Stage Fracture 3069.50 3114.80 0
2019-03-23 Perforation 3054.50 3054.80 3
2019-03-23 Perforation 3039.50 3039.80 3
2019-03-23 Perforation 3024.50 3024.80 3
2019-03-23 Perforation 3009.50 3009.80 3
2019-03-23 Multi-Stage Fracture 3009.50 3054.80 0
2019-03-23 Perforation 2994.50 2994.80 3
2019-03-23 Perforation 2979.50 2979.80 3
2019-03-23 Perforation 2964.50 2964.80 3
2019-03-23 Perforation 2949.50 2949.80 3
2019-03-16 Perforation 4884.50 4884.80 3
2019-03-24 Multi-Stage Fracture 2949.50 2994.80 0
2019-03-24 Perforation 2934.50 2934.80 3
2019-03-24 Perforation 2919.50 2919.80 3
2019-03-24 Perforation 2904.50 2904.80 3
2019-03-24 Perforation 2889.50 2889.80 3
2019-03-24 Perforation 2874.50 2874.80 3
2019-03-24 Perforation 2859.50 2859.80 3
2019-03-24 Multi-Stage Fracture 2859.50 2934.80 0
2019-03-24 Perforation 2750.00 2750.30 3
2019-03-24 Perforation 2747.00 2747.30 3
2019-03-16 Perforation 4869.50 4869.80 3
2019-03-24 Perforation 2743.50 2743.80 3
2019-03-24 Perforation 2739.50 2739.80 3
2019-03-24 Acid Treatment 2739.50 2750.30 0
2019-03-24 Perforation 2724.50 2724.80 3
2019-03-24 Perforation 2709.50 2709.80 3
2019-03-24 Perforation 2694.50 2694.80 3
2019-03-24 Perforation 2679.50 2679.80 3
2019-03-24 Perforation 2664.50 2664.80 3
2019-03-24 Perforation 2649.50 2649.80 3
2019-03-24 Multi-Stage Fracture 2649.50 2724.80 0
2019-03-16 Perforation 5079.50 5079.80 3
2019-03-16 Multi-Stage Fracture 4869.50 4914.80 0
2019-03-24 Perforation 2634.50 2634.80 3
2019-03-24 Perforation 2619.50 2619.80 3
2019-03-24 Perforation 2604.50 2604.80 3
2019-03-24 Perforation 2589.50 2589.80 3
2019-03-24 Multi-Stage Fracture 2589.50 2634.80 0
2019-03-24 Perforation 2574.50 2574.80 3
2019-03-24 Perforation 2559.50 2559.80 3
2019-03-24 Perforation 2544.50 2544.80 3
2019-03-24 Perforation 2529.50 2529.80 3
2019-03-24 Multi-Stage Fracture 2529.50 2574.80 0
2019-03-17 Perforation 4854.50 4854.80 3
2019-03-25 Perforation 2514.50 2514.80 3
2019-03-25 Perforation 2499.50 2499.80 3
2019-03-25 Perforation 2484.50 2484.80 3
2019-03-25 Perforation 2469.50 2469.80 3
2019-03-25 Multi-Stage Fracture 2469.50 2514.80 0
2019-03-25 Perforation 2454.50 2454.80 3
2019-03-25 Perforation 2439.50 2439.80 3
2019-03-25 Perforation 2424.50 2424.80 3
2019-03-25 Perforation 2409.50 2409.80 3
2019-03-25 Multi-Stage Fracture 2409.50 2454.80 0
2019-03-17 Perforation 4839.50 4839.80 3
2019-03-25 Perforation 2394.50 2394.80 3
2019-03-25 Perforation 2379.50 2379.80 3
2019-03-25 Perforation 2364.50 2364.80 3
2019-03-25 Perforation 2349.50 2349.80 3
2019-03-25 Multi-Stage Fracture 2349.50 2394.80 0
2019-03-17 Perforation 4824.50 4824.80 3
2019-03-17 Perforation 4809.50 4809.80 3
2019-03-17 Multi-Stage Fracture 4809.50 4854.80 0
2019-03-17 Perforation 4794.50 4794.80 3
2019-03-17 Perforation 4779.50 4779.80 3
2019-03-17 Perforation 4764.50 4764.80 3
2019-03-17 Perforation 4749.50 4749.80 3
2019-03-16 Perforation 5064.50 5064.80 3
2019-03-17 Multi-Stage Fracture 4749.50 4794.80 0
2019-03-17 Perforation 4734.50 4734.80 3
2019-03-17 Perforation 4719.50 4719.80 3
2019-03-17 Perforation 4704.50 4704.80 3
2019-03-17 Perforation 4689.50 4689.80 3
2019-03-17 Multi-Stage Fracture 4689.50 4734.80 0
2019-03-18 Perforation 4674.50 4674.80 3
2019-03-18 Perforation 4659.50 4659.80 3
2019-03-18 Perforation 4644.50 4644.80 3
2019-03-18 Perforation 4629.50 4629.80 3
2019-03-16 Perforation 5049.50 5049.80 3
2019-03-18 Multi-Stage Fracture 4629.50 4674.80 0
2019-03-18 Perforation 4614.50 4614.80 3
2019-03-18 Perforation 4599.50 4599.80 3
2019-03-18 Perforation 4584.50 4584.80 3
2019-03-18 Perforation 4569.50 4569.80 3
2019-03-18 Multi-Stage Fracture 4569.50 4614.80 0
2019-03-18 Perforation 4554.50 4554.80 3
2019-03-18 Perforation 4539.50 4539.80 3
2019-03-18 Perforation 4524.50 4524.80 3
2019-03-18 Perforation 4509.50 4509.80 3
2019-03-16 Multi-Stage Fracture 5049.50 5094.80 0
2019-03-18 Multi-Stage Fracture 4509.50 4554.80 0
2019-03-18 Perforation 4494.50 4494.80 3
2019-03-18 Perforation 4479.50 4479.80 3
2019-03-18 Perforation 4464.50 4464.80 3
2019-03-18 Perforation 4449.50 4449.80 3
2019-03-18 Multi-Stage Fracture 4449.50 4494.80 0
2019-03-19 Perforation 4434.50 4434.80 3
2019-03-19 Perforation 4419.50 4419.80 3
2019-03-19 Perforation 4404.50 4404.80 3
2019-03-19 Perforation 4389.50 4389.80 3
2019-03-16 Perforation 5034.50 5034.80 3
2019-03-19 Multi-Stage Fracture 4389.80 4434.80 0
2019-03-19 Perforation 4374.50 4374.80 3
2019-03-19 Perforation 4359.50 4359.80 3
2019-03-19 Perforation 4344.50 4344.80 3
2019-03-19 Perforation 4329.50 4329.80 3
2019-03-19 Multi-Stage Fracture 4329.50 4374.80 0
2019-03-19 Perforation 4314.50 4314.80 3
2019-03-19 Perforation 4299.50 4299.80 3
2019-03-19 Perforation 4284.50 4284.80 3
2019-03-19 Perforation 4269.50 4269.80 3
2019-03-16 Perforation 5019.50 5019.80 3
2019-03-19 Multi-Stage Fracture 4269.50 4314.80 0
2019-03-19 Perforation 4254.50 4254.80 3
2019-03-19 Perforation 4239.50 4239.80 3
2019-03-19 Perforation 4224.50 4224.80 3
2019-03-19 Perforation 4209.50 4209.80 3
2019-03-19 Multi-Stage Fracture 4209.50 4254.80 0
2019-03-19 Perforation 4194.50 4194.80 3
2019-03-19 Perforation 4179.50 4179.80 3
2019-03-19 Perforation 4164.50 4164.80 3
2019-03-19 Perforation 4149.50 4149.80 3
2019-03-16 Perforation 5004.50 5004.80 3
2019-03-20 Multi-Stage Fracture 4149.50 4194.80 0
2019-03-20 Perforation 4134.50 4134.80 3
2019-03-20 Perforation 4119.50 4119.80 3
2019-03-20 Perforation 4104.50 4104.80 3
2019-03-20 Perforation 4089.50 4089.80 3
2019-03-20 Multi-Stage Fracture 4089.50 4134.80 0
2019-03-20 Perforation 4074.50 4074.80 3
2019-03-20 Perforation 4059.50 4059.80 3
2019-03-20 Perforation 4044.50 4044.80 3
2019-03-20 Perforation 4029.50 4029.80 3
2019-03-16 Perforation 4989.50 4989.80 3
2019-03-20 Multi-Stage Fracture 4029.50 4074.80 0
2019-03-20 Perforation 4014.50 4014.80 3
2019-03-20 Perforation 3999.50 3999.80 3
2019-03-20 Perforation 3984.50 3984.80 3
2019-03-20 Perforation 3969.50 3969.80 3
2019-03-20 Multi-Stage Fracture 3969.50 4014.80 0
2019-03-20 Perforation 3954.50 3954.80 3
2019-03-20 Perforation 3939.50 3939.80 3
2019-03-20 Perforation 3924.50 3924.80 3
2019-03-20 Perforation 3909.50 3909.80 3

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-03-16 2019-03-25 2,098 16,569 N/A
2 2019-03-16 2019-03-19 2,098 0 N/A
3 2019-03-23 2019-03-25 2,098 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 85.0305 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 12.5133 N/A
Enviro-Syn HCR Fluid Energy Group Ltd. Acid Non-Hazardous Ingredients Trade Secret 100 1.0591 N/A
SaniFrac 8844. Biocide Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0101 N/A
Acetonitrile. 2.2-dibromo 3252-43-5 100 0.0102 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0101 N/A
Polyethylene glycol 25322-68-3 100 0.0101 N/A
Sodium bromide 7647-15-6 100 0.0101 N/A
CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0083 N/A
DynaRate 6202D. Friction Reducer Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0309 N/A
2 40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 3.8528 N/A
3 DWP-690. Slickwater Breaker Calfrac Breaker Hydrogen peroxide 7722-84-1 100 0.0111 N/A
Water 7732-18-5 100 0.0111 N/A

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 5306 0.0 0.0 0.0
2020 2092 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-16 No Incident Encountered 0.00 0.00
2019-04-19 No Incident Encountered 0.00 0.00

For data sources see[9]

References