If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786112210002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.796011,"lon":-119.650599,"icon":""}]} |
Location: 00/10-22-078-11W6/2 | |
Location Alias: 00/10-22-78-11 W6M | |
Location Alias 2: 00/10-22-078-11 W6/02 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 11 | |
Section: 22 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR PCOUPES 7-28-78-11 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0433158 | |
License Date: 2011-04-27 | |
License Status: Amended | |
Spud Date: 2011-11-09 | |
Final Drill Date: 2011-12-07 | |
Well Total Depth: 5372.00 m | |
Surface Hole Latitude: 55.796011 | |
Surface Hole Longitude: -119.650599 |
Date | Event |
---|---|
2011-04-27 | Obtained License |
2011-11-09 | Surface Casing Operation Performed |
2011-11-17 | Intermediate Casing Operation Performed |
2011-11-19 | Direction Drilling Operation Performed - Horizontal |
2011-11-24 | Direction Drilling Operation Performed - Horizontal |
2011-11-24 | Direction Drilling Operation Performed - Sidetrack Fish |
2011-12-07 | Finished Drilling |
2011-12-07 | Well Mode changed to Drilled and Cased |
2011-12-09 | Liner Casing Operation Performed |
2011-12-11 | Perforation Treatment Performed - Open-Hole Completion |
2011-12-11 | Rig Released |
2012-02-24 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-25 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-02-28 | Well Fluid changed to Gas |
2012-02-28 | Well Mode changed to Testing |
2012-03-23 | Well Log Performed |
2012-05-28 | Well Fluid changed to Gas |
2012-05-28 | Well Mode changed to Test Completed |
2012-09-22 | Well Fluid changed to Gas |
2012-09-22 | Well Mode changed to Testing |
2012-12-10 | Well Began Production |
2012-12-10 | Well Fluid changed to Gas |
2012-12-10 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-11-19 | 2224.40 | Horizontal |
2011-11-24 | 3025.00 | Sidetrack fish |
2011-11-24 | 3025.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-12-11 | Open Hole/Barefoot Completion | 5362.00 | 5372.00 | 0 |
2012-02-26 | Multi-Stage Fracture | 3642.40 | 3643.70 | 0 |
2012-02-26 | Multi-Stage Fracture | 3800.30 | 3801.50 | 0 |
2012-02-26 | Multi-Stage Fracture | 4128.00 | 4129.20 | 0 |
2012-02-27 | Multi-Stage Fracture | 2865.80 | 2867.00 | 0 |
2012-02-27 | Multi-Stage Fracture | 3021.40 | 3022.60 | 0 |
2012-02-27 | Multi-Stage Fracture | 3175.60 | 3176.90 | 0 |
2012-02-27 | Multi-Stage Fracture | 3329.30 | 3330.60 | 0 |
2012-02-28 | Multi-Stage Fracture | 2405.50 | 2406.70 | 0 |
2012-02-28 | Multi-Stage Fracture | 2557.40 | 2558.60 | 0 |
2012-02-28 | Multi-Stage Fracture | 2711.90 | 2713.10 | 0 |
2012-02-24 | Multi-Stage Fracture | 4955.60 | 4956.80 | 0 |
2012-02-24 | Multi-Stage Fracture | 5114.10 | 5115.30 | 0 |
2012-02-24 | Multi-Stage Fracture | 5284.50 | 5286.60 | 0 |
2012-02-25 | Multi-Stage Fracture | 4289.10 | 4290.30 | 0 |
2012-02-25 | Multi-Stage Fracture | 4459.60 | 4460.80 | 0 |
2012-02-25 | Multi-Stage Fracture | 4628.20 | 4629.40 | 0 |
2012-02-25 | Multi-Stage Fracture | 4786.90 | 4788.10 | 0 |
2012-02-26 | Multi-Stage Fracture | 3492.50 | 3493.70 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 292 | 0.0 | 0.0 | 0.0 |
2013 | 4864 | 0.0 | 0.0 | 0.0 |
2014 | 7923 | 0.0 | 0.0 | 0.0 |
2015 | 7025 | 0.0 | 0.0 | 0.0 |
2016 | 7970 | 0.0 | 0.0 | 0.0 |
2017 | 7521 | 0.0 | 0.0 | 0.0 |
2018 | 8332 | 0.0 | 0.0 | 0.0 |
2019 | 7395 | 0.0 | 0.0 | 0.0 |
2020 | 2137 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-03-30 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]