X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786112003000

Well Details

Well ID: 0786112003000
Loading map...
Location: 00/03-20-078-11W6/0
Location Alias: 00/03-20-78-11 W6M
Location Alias 2: 00/03-20-078-11 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 11
Section: 20
County/Municipality: Saddle Hills County
Well Name: BIR PCOUPES 3-20-78-11
Operator Name: Birchcliff Energy Ltd.
License Number: 0453608
License Date: 2013-01-15
License Status: Amended
Spud Date: 2013-03-01
Final Drill Date: 2013-03-20
Well Total Depth: 5714.00 m
Surface Hole Latitude: 55.785018
Surface Hole Longitude: -119.713593

For data sources see[1][2]

Well History

Date Event
2013-01-15 Obtained License
2013-03-02 Direction Drilling Operation Performed - Deviate
2013-03-02 Surface Casing Operation Performed
2013-03-06 Direction Drilling Operation Performed - Deviate
2013-03-08 Direction Drilling Operation Performed - Horizontal
2013-03-08 Intermediate Casing Operation Performed
2013-03-20 Finished Drilling
2013-03-20 Well Mode changed to Drilled and Cased
2013-03-23 Liner Casing Operation Performed
2013-03-23 Perforation Treatment Performed - Open-Hole Completion
2013-03-23 Rig Released
2013-07-22 Well Log Performed
2013-08-10 Perforation Treatment Performed - Multi-Stage Fracture
2013-08-11 Perforation Treatment Performed - Multi-Stage Fracture
2013-08-12 Perforation Treatment Performed - Multi-Stage Fracture
2013-10-26 Well Began Production
2013-10-26 Well Fluid changed to Crude Oil
2013-10-26 Well Mode changed to Flowing
2019-05-31 Well Fluid changed to Crude Oil
2019-05-31 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-03-01 Trinidad Drilling Ltd. 45 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-03-02 190.00 Deviate (5 - 79 degrees)
2013-03-06 1950.00 Deviate (5 - 79 degrees)
2013-03-08 2253.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-03-23 Open Hole/Barefoot Completion 5707.00 5714.00 0
2013-08-11 Multi-Stage Fracture 4823.10 4824.30 0
2013-08-11 Multi-Stage Fracture 4722.40 4723.60 0
2013-08-11 Multi-Stage Fracture 4624.00 4625.20 0
2013-08-11 Multi-Stage Fracture 4517.80 4519.10 0
2013-08-11 Multi-Stage Fracture 4420.40 4421.60 0
2013-08-11 Multi-Stage Fracture 4310.70 4312.00 0
2013-08-11 Multi-Stage Fracture 4213.50 4214.70 0
2013-08-11 Multi-Stage Fracture 4117.50 4118.70 0
2013-08-11 Multi-Stage Fracture 4007.40 4008.70 0
2013-08-11 Multi-Stage Fracture 3911.80 3913.10 0
2013-08-10 Multi-Stage Fracture 5653.00 5667.80 0
2013-08-11 Multi-Stage Fracture 3801.50 3802.80 0
2013-08-11 Multi-Stage Fracture 3696.90 3698.10 0
2013-08-12 Multi-Stage Fracture 3599.20 3600.40 0
2013-08-12 Multi-Stage Fracture 3489.90 3491.20 0
2013-08-12 Multi-Stage Fracture 3395.40 3396.60 0
2013-08-12 Multi-Stage Fracture 3287.40 3288.60 0
2013-08-12 Multi-Stage Fracture 3184.80 3186.00 0
2013-08-12 Multi-Stage Fracture 3091.20 3092.40 0
2013-08-12 Multi-Stage Fracture 2987.80 2989.00 0
2013-08-12 Multi-Stage Fracture 2875.90 2877.20 0
2013-08-10 Multi-Stage Fracture 5538.50 5539.80 0
2013-08-12 Multi-Stage Fracture 2777.60 2778.80 0
2013-08-12 Multi-Stage Fracture 2674.10 2675.30 0
2013-08-12 Multi-Stage Fracture 2575.90 2577.10 0
2013-08-12 Multi-Stage Fracture 2465.50 2466.70 0
2013-08-12 Multi-Stage Fracture 2368.60 2369.80 0
2013-08-10 Multi-Stage Fracture 5437.80 5439.00 0
2013-08-10 Multi-Stage Fracture 5337.10 5338.30 0
2013-08-10 Multi-Stage Fracture 5237.80 5239.10 0
2013-08-10 Multi-Stage Fracture 5139.00 5140.20 0
2013-08-11 Multi-Stage Fracture 5038.30 5039.50 0
2013-08-11 Multi-Stage Fracture 4923.80 4925.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-08-10 2013-08-12 2,177 14,032 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 79.971 N/A
Sand (30/50) Trican silica crystalline 14808-60-7 100 16.6741 N/A
Sand (40/70) Trican silica crystalline 14808-60-7 100 4.0261 N/A
ASPEN-FR-27 Aspen Polymers Friction Reducer Ethylene Glycol 107-21-1 100 0.0018 N/A
Non-Hazardous Not Available 100 0.0588 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-08-10 2013-08-12 Surface Water - River 14038

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 20 0.0 0.0 0.0
2014 3707 0.0 0.0 0.0
2015 4096 0.0 0.0 0.0
2016 8520 0.0 0.0 0.0
2017 5991 0.0 0.0 0.0
2018 8613 0.0 0.0 0.0
2019 5723 0.0 0.0 0.0
2020 2060 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-03-23 No Incident Encountered 0.00 0.00
2013-08-18 No Incident Encountered 0.00 0.00
2017-11-24 No Incident Encountered 0.00 0.00

For data sources see[10]

References