X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786111809000

Well Details

Well ID: 0786111809000
Loading map...
Location: 00/09-18-078-11W6/0
Location Alias: 00/09-18-78-11 W6M
Location Alias 2: 00/09-18-078-11 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 11
Section: 18
County/Municipality: Saddle Hills County
Well Name: BIR PCOUPES 9-18-78-11
Operator Name: Birchcliff Energy Ltd.
License Number: 0465522
License Date: 2014-03-06
License Status: Issued
Spud Date: 2014-03-15
Final Drill Date: 2014-03-31
Well Total Depth: 5400.00 m
Surface Hole Latitude: 55.778828
Surface Hole Longitude: -119.722538

For data sources see[1][2]

Well History

Date Event
2014-03-06 Obtained License
2014-03-15 Direction Drilling Operation Performed - Deviate
2014-03-16 Surface Casing Operation Performed
2014-03-23 Direction Drilling Operation Performed - Horizontal
2014-03-23 Intermediate Casing Operation Performed
2014-03-23 Well Log Performed
2014-03-31 Finished Drilling
2014-03-31 Well Mode changed to Drilled and Cased
2014-04-01 Well Log Performed
2014-04-02 Liner Casing Operation Performed
2014-04-02 Perforation Treatment Performed - Open-Hole Completion
2014-04-03 Rig Released
2014-06-14 Perforation Treatment Performed - Multi-Stage Fracture
2014-06-15 Perforation Treatment Performed - Multi-Stage Fracture
2014-06-16 Perforation Treatment Performed - Multi-Stage Fracture
2014-06-17 Perforation Treatment Performed - Multi-Stage Fracture
2014-08-25 Well Began Production
2014-08-25 Well Fluid changed to Crude Oil
2014-08-25 Well Mode changed to Flowing
2019-02-28 Well Fluid changed to Crude Oil
2019-02-28 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-03-15 Ensign Drilling Inc. 133 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-03-15 147.00 Deviate (5 - 79 degrees)
2014-03-23 2339.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-04-02 Open Hole/Barefoot Completion 5390.00 5400.00 0
2014-06-15 Multi-Stage Fracture 4641.60 4642.80 0
2014-06-15 Multi-Stage Fracture 4560.40 4561.60 0
2014-06-15 Multi-Stage Fracture 4465.00 4466.20 0
2014-06-15 Multi-Stage Fracture 4382.80 4384.10 0
2014-06-16 Multi-Stage Fracture 4299.90 4301.10 0
2014-06-16 Multi-Stage Fracture 4216.00 4217.20 0
2014-06-16 Multi-Stage Fracture 4118.30 4119.50 0
2014-06-16 Multi-Stage Fracture 4034.40 4035.60 0
2014-06-16 Multi-Stage Fracture 3950.50 3951.70 0
2014-06-16 Multi-Stage Fracture 3867.40 3868.70 0
2014-06-14 Multi-Stage Fracture 5338.70 5354.40 0
2014-06-16 Multi-Stage Fracture 3769.90 3771.10 0
2014-06-16 Multi-Stage Fracture 3686.00 3687.30 0
2014-06-16 Multi-Stage Fracture 3602.10 3603.30 0
2014-06-16 Multi-Stage Fracture 3504.30 3505.50 0
2014-06-16 Multi-Stage Fracture 3420.40 3421.60 0
2014-06-16 Multi-Stage Fracture 3336.40 3337.60 0
2014-06-16 Multi-Stage Fracture 3252.50 3253.70 0
2014-06-16 Multi-Stage Fracture 3157.00 3158.20 0
2014-06-16 Multi-Stage Fracture 3073.20 3074.40 0
2014-06-16 Multi-Stage Fracture 2989.10 2990.40 0
2014-06-14 Multi-Stage Fracture 5254.70 5255.90 0
2014-06-17 Multi-Stage Fracture 2905.20 2906.40 0
2014-06-17 Multi-Stage Fracture 2821.30 2822.60 0
2014-06-17 Multi-Stage Fracture 2723.70 2724.90 0
2014-06-17 Multi-Stage Fracture 2641.10 2642.30 0
2014-06-17 Multi-Stage Fracture 2558.40 2559.60 0
2014-06-17 Multi-Stage Fracture 2461.30 2462.60 0
2014-06-14 Multi-Stage Fracture 5170.70 5171.90 0
2014-06-15 Multi-Stage Fracture 5086.80 5088.00 0
2014-06-15 Multi-Stage Fracture 4989.60 4990.80 0
2014-06-15 Multi-Stage Fracture 4905.50 4906.70 0
2014-06-15 Multi-Stage Fracture 4821.50 4822.70 0
2014-06-15 Multi-Stage Fracture 4737.80 4739.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-06-14 2014-06-17 2,206 13,826 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 79.2602 N/A
Pearl RCS 30/50 Preferred Sands polyurethane resin Trade Secret 100 5.6089 N/A
silica crystalline 14808-60-7 100 5.6089 N/A
Sand 30/50 Southwest Sands silica crystalline 14808-60-7 100 15.0727 N/A
ASPEN-FR-27 Aspen Polymers Friction Reducer Ethylene Glycol 107-21-1 100 0.0017 N/A
Non-Hazardous Not Available 100 0.0562 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-06-14 2014-06-17 Surface Water - Runoff 13867

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 1784 0.0 0.0 0.0
2015 8477 0.0 0.0 0.0
2016 8511 0.0 0.0 0.0
2017 7755 0.0 0.0 0.0
2018 8580 0.0 0.0 0.0
2019 8551 0.0 0.0 0.0
2020 2082 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-04-03 No Incident Encountered 0.00 0.00
2014-06-17 No Incident Encountered 0.00 0.00

For data sources see[10]

References