If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786111806020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.736694,"lon":-119.688458,"icon":""}]} |
Location: 02/06-18-078-11W6/0 | |
Location Alias: 02/06-18-78-11 W6M | |
Location Alias 2: 02/06-18-078-11 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 11 | |
Section: 18 | |
County/Municipality: Saddle Hills County | |
Well Name: KELT EXP 102 HZ PCOUPES 6-18-78-11 | |
Operator Name: Kelt Exploration Ltd. | |
License Number: 0480194 | |
License Date: 2016-08-25 | |
License Status: Issued | |
Spud Date: 2016-10-09 | |
Final Drill Date: 2016-10-26 | |
Well Total Depth: 4685.00 m | |
Surface Hole Latitude: 55.736694 | |
Surface Hole Longitude: -119.688458 |
Date | Event |
---|---|
2016-08-25 | Obtained License |
2016-10-09 | Surface Casing Operation Performed |
2016-10-14 | Direction Drilling Operation Performed - Deviate |
2016-10-18 | Direction Drilling Operation Performed - Horizontal |
2016-10-26 | Finished Drilling |
2016-10-26 | Well Log Performed |
2016-10-26 | Well Mode changed to Drilled and Cased |
2016-10-27 | Liner Casing Operation Performed |
2016-10-27 | Production Casing Operation Performed |
2016-10-28 | Perforation Treatment Performed - Open-Hole Completion |
2016-10-29 | Rig Released |
2017-01-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-01-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-01-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-01-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2017-01-28 | Well Began Production |
2017-01-28 | Well Fluid changed to Crude Oil |
2017-01-28 | Well Mode changed to Flowing |
2018-10-26 | Well Log Performed |
2018-11-01 | Well Fluid changed to Crude Oil |
2018-11-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2016-10-09 | Horizon Drilling Inc. | 45 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2016-10-14 | 1919.30 | Deviate (5 - 79 degrees) |
2016-10-18 | 2295.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2016-10-28 | Open Hole/Barefoot Completion | 4676.20 | 4685.00 | 0 |
2017-01-08 | Multi-Stage Fracture | 4285.70 | 4286.50 | 0 |
2017-01-08 | Multi-Stage Fracture | 4246.40 | 4247.20 | 0 |
2017-01-08 | Multi-Stage Fracture | 4206.30 | 4207.10 | 0 |
2017-01-09 | Multi-Stage Fracture | 4152.60 | 4153.30 | 0 |
2017-01-09 | Multi-Stage Fracture | 4097.30 | 4098.10 | 0 |
2017-01-09 | Multi-Stage Fracture | 4055.00 | 4055.80 | 0 |
2017-01-09 | Multi-Stage Fracture | 4014.40 | 4015.20 | 0 |
2017-01-09 | Multi-Stage Fracture | 3974.00 | 3974.80 | 0 |
2017-01-09 | Multi-Stage Fracture | 3918.30 | 3919.10 | 0 |
2017-01-09 | Multi-Stage Fracture | 3876.10 | 3876.90 | 0 |
2017-01-08 | Multi-Stage Fracture | 4638.60 | 4639.90 | 0 |
2017-01-09 | Multi-Stage Fracture | 3820.90 | 3821.70 | 0 |
2017-01-09 | Multi-Stage Fracture | 3779.10 | 3779.90 | 0 |
2017-01-09 | Multi-Stage Fracture | 3723.20 | 3724.00 | 0 |
2017-01-09 | Multi-Stage Fracture | 3681.00 | 3681.80 | 0 |
2017-01-09 | Multi-Stage Fracture | 3625.80 | 3626.60 | 0 |
2017-01-09 | Multi-Stage Fracture | 3583.40 | 3584.20 | 0 |
2017-01-09 | Multi-Stage Fracture | 3527.80 | 3528.60 | 0 |
2017-01-09 | Multi-Stage Fracture | 3485.70 | 3486.50 | 0 |
2017-01-09 | Multi-Stage Fracture | 3431.80 | 3432.60 | 0 |
2017-01-10 | Multi-Stage Fracture | 3389.70 | 3390.50 | 0 |
2017-01-08 | Multi-Stage Fracture | 4604.10 | 4604.90 | 0 |
2017-01-10 | Multi-Stage Fracture | 3322.80 | 3323.60 | 0 |
2017-01-10 | Multi-Stage Fracture | 3281.80 | 3282.60 | 0 |
2017-01-10 | Multi-Stage Fracture | 3226.20 | 3227.00 | 0 |
2017-01-10 | Multi-Stage Fracture | 3184.30 | 3185.10 | 0 |
2017-01-10 | Multi-Stage Fracture | 3130.00 | 3130.80 | 0 |
2017-01-10 | Multi-Stage Fracture | 3101.20 | 3102.00 | 0 |
2017-01-10 | Multi-Stage Fracture | 3043.30 | 3044.10 | 0 |
2017-01-10 | Multi-Stage Fracture | 2986.10 | 2986.90 | 0 |
2017-01-10 | Multi-Stage Fracture | 2940.90 | 2941.70 | 0 |
2017-01-10 | Multi-Stage Fracture | 2882.70 | 2883.50 | 0 |
2017-01-08 | Multi-Stage Fracture | 4562.50 | 4563.30 | 0 |
2017-01-10 | Multi-Stage Fracture | 2837.30 | 2838.10 | 0 |
2017-01-10 | Multi-Stage Fracture | 2791.70 | 2792.50 | 0 |
2017-01-10 | Multi-Stage Fracture | 2733.90 | 2734.70 | 0 |
2017-01-10 | Multi-Stage Fracture | 2688.30 | 2689.10 | 0 |
2017-01-11 | Multi-Stage Fracture | 2642.70 | 2643.50 | 0 |
2017-01-11 | Multi-Stage Fracture | 2609.60 | 2610.40 | 0 |
2017-01-11 | Multi-Stage Fracture | 2564.00 | 2564.80 | 0 |
2017-01-11 | Multi-Stage Fracture | 2518.40 | 2519.20 | 0 |
2017-01-08 | Multi-Stage Fracture | 4522.10 | 4522.90 | 0 |
2017-01-08 | Multi-Stage Fracture | 4467.00 | 4467.80 | 0 |
2017-01-08 | Multi-Stage Fracture | 4424.90 | 4425.70 | 0 |
2017-01-08 | Multi-Stage Fracture | 4382.70 | 4383.50 | 0 |
2017-01-08 | Multi-Stage Fracture | 4340.90 | 4341.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2017-01-08 | 2017-01-11 | 2,198 | 18,329 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 85.2874 | N/A | |||
Prime Plus (30/50) | Canyon Technical Services | No specific ingredients | Not Available | 100 | 1.0737 | N/A | ||
Sand (30/50) Ottawa | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 10.2817 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 10.2817 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 10.2817 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 10.2817 | N/A | ||||
Sand (40/70) | Canyon Technical Services | Aluminum Oxide | 1344-28-1 | 100 | 3.2246 | N/A | ||
Crystalline silica. quartz | 14808-60-7 | 100 | 3.2246 | N/A | ||||
Iron Oxide | 1309-37-1 | 100 | 3.2246 | N/A | ||||
Titanium Oxide | 13463-67-7 | 100 | 3.2245 | N/A | ||||
Tolcide PS75LT | Canyon Technical Services | Bactericide/Biocide | Tetrakis (Hydroxymethyl) Phosphonium Sulfate | 55566-30-8 | 100 | 0.0122 | N/A | |
Water | 7732-18-5 | 100 | 0.0122 | N/A | ||||
CAN-1912 Clay Stabilizer (HT) | Canyon Technical Services | Clay Control | No hazardous ingredients | Not Available | 100 | 0.0564 | N/A | |
CAN-2412 Non-emulsifier | Canyon Technical Services | Demulsifier | 1-Hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0413 | N/A | |
Benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol (1:1) |
26836-07-7 | 100 | 0.0413 | N/A | ||||
Methanol | 67-56-1 | 100 | 0.0413 | N/A | ||||
Poly(oxyethelyne. oxypropylene) copolymer. liquids | 11/6/9003 | 100 | 0.0413 | N/A | ||||
Water | 7732-18-5 | 100 | 0.0413 | N/A | ||||
CAN-2057 Friction Reducer | Canyon Technical Services | Gelling Agent | No hazardous ingredients | Not Available | 100 | 0.0455 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2016-12-30 | 2017-01-12 | Surface Water - Runoff | 6391 |
2016-12-30 | 2017-01-12 | Surface Water - Runoff | 4000 |
2016-12-30 | 2017-01-12 | Surface Water - Runoff | 2112 |
2016-12-30 | 2017-01-12 | Surface Water - Runoff | 5827 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2017 | 7464 | 0.0 | 0.0 | 0.0 |
2018 | 7150 | 0.0 | 0.0 | 0.0 |
2019 | 7780 | 0.0 | 0.0 | 0.0 |
2020 | 2177 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2016-10-29 | No Incident Encountered | 0.00 | 0.00 |
2017-01-30 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]