If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786111602000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.767158,"lon":-119.645944,"icon":""}]} |
Location: 00/02-16-078-11W6/0 | |
Location Alias: 00/02-16-78-11 W6M | |
Location Alias 2: 00/02-16-078-11 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 11 | |
Section: 16 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR PCOUPES 2-16-78-11 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0461266 | |
License Date: 2013-11-20 | |
License Status: Amended | |
Spud Date: 2014-03-07 | |
Final Drill Date: 2014-03-19 | |
Well Total Depth: 4007.00 m | |
Surface Hole Latitude: 55.767158 | |
Surface Hole Longitude: -119.645944 |
Date | Event |
---|---|
2013-11-20 | Obtained License |
2014-03-07 | Direction Drilling Operation Performed - Deviate |
2014-03-08 | Surface Casing Operation Performed |
2014-03-13 | Intermediate Casing Operation Performed |
2014-03-16 | Direction Drilling Operation Performed - Horizontal |
2014-03-19 | Finished Drilling |
2014-03-19 | Well Mode changed to Drilled and Cased |
2014-03-22 | Perforation Treatment Performed - Open-Hole Completion |
2014-03-22 | Production Casing Operation Performed |
2014-03-22 | Rig Released |
2014-05-03 | Well Log Performed |
2014-05-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-05-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-07-12 | Well Began Production |
2014-07-12 | Well Fluid changed to Crude Oil |
2014-07-12 | Well Mode changed to Flowing |
2019-03-01 | Well Fluid changed to Crude Oil |
2019-03-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-03-07 | Trinidad Drilling Ltd. | 45 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-03-07 | 135.00 | Deviate (5 - 79 degrees) |
2014-03-16 | 2409.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-03-22 | Open Hole/Barefoot Completion | 4000.00 | 4007.00 | 0 |
2014-05-10 | Multi-Stage Fracture | 3310.00 | 3311.30 | 0 |
2014-05-10 | Multi-Stage Fracture | 3240.00 | 3241.20 | 0 |
2014-05-11 | Multi-Stage Fracture | 3154.80 | 3156.00 | 0 |
2014-05-11 | Multi-Stage Fracture | 3068.50 | 3069.80 | 0 |
2014-05-11 | Multi-Stage Fracture | 2997.60 | 2998.90 | 0 |
2014-05-11 | Multi-Stage Fracture | 2913.90 | 2915.10 | 0 |
2014-05-11 | Multi-Stage Fracture | 2833.30 | 2834.50 | 0 |
2014-05-11 | Multi-Stage Fracture | 2757.70 | 2759.00 | 0 |
2014-05-11 | Multi-Stage Fracture | 2674.10 | 2675.30 | 0 |
2014-05-11 | Multi-Stage Fracture | 2597.30 | 2598.50 | 0 |
2014-05-10 | Multi-Stage Fracture | 3947.00 | 3962.60 | 0 |
2014-05-11 | Multi-Stage Fracture | 2519.80 | 2521.00 | 0 |
2014-05-10 | Multi-Stage Fracture | 3874.90 | 3876.20 | 0 |
2014-05-10 | Multi-Stage Fracture | 3789.90 | 3791.10 | 0 |
2014-05-10 | Multi-Stage Fracture | 3707.70 | 3708.90 | 0 |
2014-05-10 | Multi-Stage Fracture | 3637.30 | 3638.50 | 0 |
2014-05-10 | Multi-Stage Fracture | 3553.70 | 3554.90 | 0 |
2014-05-10 | Multi-Stage Fracture | 3469.20 | 3470.40 | 0 |
2014-05-10 | Multi-Stage Fracture | 3396.00 | 3397.30 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-05-10 | 2014-05-11 | 2,196 | 12,117 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | 7732-18-5 | 100 | 75.5651 | N/A | |||
Prime Plus 30/50 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 3.7622 | N/A | ||
silica crystalline | 14808-60-7 | 100 | 3.7622 | N/A | ||||
Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 20.6181 | N/A | ||
ASPEN-FR-27 | Aspen Polymers | Friction Reducer | Ethylene Glycol | 107-21-1 | 100 | 0.0016 | N/A | |
Non-Hazardous | Not Available | 100 | 0.0527 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-05-09 | 2014-05-09 | Surface Water - Runoff | 12141 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 3096 | 0.0 | 0.0 | 0.0 |
2015 | 5684 | 0.0 | 0.0 | 0.0 |
2016 | 8399 | 0.0 | 0.0 | 0.0 |
2017 | 7567 | 0.0 | 0.0 | 0.0 |
2018 | 8502 | 0.0 | 0.0 | 0.0 |
2019 | 8672 | 0.0 | 0.0 | 0.0 |
2020 | 2167 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-03-22 | No Incident Encountered | 0.00 | 0.00 |
2014-05-11 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]