X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786111503020

Well Details

Well ID: 0786111503020
Loading map...
Location: 02/03-15-078-11W6/0
Location Alias: 02/03-15-78-11 W6M
Location Alias 2: 02/03-15-078-11 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 11
Section: 15
County/Municipality: Saddle Hills County
Well Name: BIR 14-16 HZ 102 PCOUPES 3-15-78-11
Operator Name: Birchcliff Energy Ltd.
License Number: 0480758
License Date: 2016-10-13
License Status: Issued
Spud Date: 2016-10-28
Final Drill Date: 2016-11-08
Well Total Depth: 4193.00 m
Surface Hole Latitude: 55.766555
Surface Hole Longitude: -119.645845

For data sources see[1][2]

Well History

Date Event
2016-10-13 Obtained License
2016-10-29 Surface Casing Operation Performed
2016-11-02 Direction Drilling Operation Performed - Deviate
2016-11-04 Direction Drilling Operation Performed - Horizontal
2016-11-08 Finished Drilling
2016-11-08 Well Log Performed
2016-11-08 Well Mode changed to Drilled and Cased
2016-11-09 Well Log Performed
2016-11-11 Well Log Performed
2016-11-12 Production Casing Operation Performed
2016-11-13 Rig Released
2017-01-20 Perforation Treatment Performed - Multi-Stage Fracture
2017-01-20 Perforation Treatment Performed - Open-Hole Completion
2017-01-21 Perforation Treatment Performed - Multi-Stage Fracture
2017-01-22 Perforation Treatment Performed - Multi-Stage Fracture
2017-01-28 Well Began Production
2017-01-28 Well Fluid changed to Crude Oil
2017-01-28 Well Mode changed to Flowing
2017-11-20 Well Fluid changed to Crude Oil
2017-11-20 Well Mode changed to Pumping
2018-10-18 Well Fluid changed to Crude Oil
2018-10-18 Well Mode changed to Flowing
2019-03-01 Well Fluid changed to Crude Oil
2019-03-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-10-28 Trinidad Drilling Ltd. 449 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-11-02 1899.10 Deviate (5 - 79 degrees)
2016-11-04 2184.50 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-01-20 Open Hole/Barefoot Completion 4192.00 4193.00 0
2017-01-21 Multi-Stage Fracture 3702.00 3702.80 0
2017-01-21 Multi-Stage Fracture 3643.90 3644.70 0
2017-01-21 Multi-Stage Fracture 3598.40 3599.20 0
2017-01-21 Multi-Stage Fracture 3552.90 3553.70 0
2017-01-21 Multi-Stage Fracture 3507.40 3508.20 0
2017-01-21 Multi-Stage Fracture 3461.80 3462.60 0
2017-01-21 Multi-Stage Fracture 3416.30 3417.10 0
2017-01-21 Multi-Stage Fracture 3370.90 3371.70 0
2017-01-21 Multi-Stage Fracture 3325.40 3326.20 0
2017-01-21 Multi-Stage Fracture 3279.90 3280.70 0
2017-01-20 Multi-Stage Fracture 4168.10 4168.90 0
2017-01-21 Multi-Stage Fracture 3234.50 3235.30 0
2017-01-21 Multi-Stage Fracture 3189.00 3189.80 0
2017-01-21 Multi-Stage Fracture 3143.50 3144.30 0
2017-01-21 Multi-Stage Fracture 3098.00 3098.80 0
2017-01-21 Multi-Stage Fracture 3052.50 3053.30 0
2017-01-21 Multi-Stage Fracture 3007.10 3007.90 0
2017-01-21 Multi-Stage Fracture 2961.70 2962.50 0
2017-01-21 Multi-Stage Fracture 2916.20 2917.00 0
2017-01-21 Multi-Stage Fracture 2870.70 2871.50 0
2017-01-21 Multi-Stage Fracture 2825.20 2826.00 0
2017-01-20 Multi-Stage Fracture 4109.00 4109.90 0
2017-01-21 Multi-Stage Fracture 2779.60 2780.40 0
2017-01-21 Multi-Stage Fracture 2734.10 2734.90 0
2017-01-21 Multi-Stage Fracture 2688.70 2689.50 0
2017-01-21 Multi-Stage Fracture 2643.20 2644.00 0
2017-01-21 Multi-Stage Fracture 2597.70 2598.50 0
2017-01-21 Multi-Stage Fracture 2552.80 2553.60 0
2017-01-22 Multi-Stage Fracture 2507.50 2508.30 0
2017-01-22 Multi-Stage Fracture 2461.90 2462.70 0
2017-01-22 Multi-Stage Fracture 2416.60 2417.40 0
2017-01-22 Multi-Stage Fracture 2371.00 2371.80 0
2017-01-20 Multi-Stage Fracture 4051.00 4051.80 0
2017-01-22 Multi-Stage Fracture 2325.60 2326.40 0
2017-01-22 Multi-Stage Fracture 2280.10 2280.90 0
2017-01-20 Multi-Stage Fracture 3992.80 3993.60 0
2017-01-20 Multi-Stage Fracture 3934.70 3935.50 0
2017-01-20 Multi-Stage Fracture 3876.50 3877.30 0
2017-01-20 Multi-Stage Fracture 3818.30 3819.10 0
2017-01-20 Multi-Stage Fracture 3760.20 3761.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-01-20 2017-01-22 2,125 13,088 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 87.4306 N/A
30/50 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 9.3452 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 3.8062 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0118 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0118 N/A
DWP-641 Calfrac Friction Reducer Ammonium chloride 12125-02-9 100 0.1068 N/A
Distillates (petroleum). hydrotreated light 64742-47-8 100 0.1068 N/A
Non-Hazardous Ingredients Trade Secret 100 0.1068 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-01-15 2017-01-21 Recycled Fracturing Water (treated at well site) 835
2017-01-16 2017-01-21 Groundwater - Saline 260
2017-01-03 2017-01-20 Recycled Fracturing Water (treated at independent stand-alone facility) 407
2017-01-15 2017-01-17 Surface Water - Runoff 6691
2017-01-15 2017-01-17 Surface Water - Runoff 2131
2017-01-15 2017-01-17 Surface Water - Runoff 2547
2017-01-15 2017-01-17 Surface Water - Runoff 4041

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 6585 0.0 0.0 0.0
2018 7926 0.0 0.0 0.0
2019 8648 0.0 0.0 0.0
2020 2167 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-11-13 No Incident Encountered 0.00 0.00
2017-01-22 No Incident Encountered 0.00 0.00

For data sources see[10]

References