X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0786111503000

Well Details

Well ID: 0786111503000
Loading map...
Location: 00/03-15-078-11W6/0
Location Alias: 00/03-15-78-11 W6M
Location Alias 2: 00/03-15-078-11 W6/00
Country: Canada
Province: Alberta
Township: 078
Meridian: 6
Range: 11
Section: 15
County/Municipality: Saddle Hills County
Well Name: BIR PCOUPES 3-15-78-11
Operator Name: Birchcliff Energy Ltd.
License Number: 0461264
License Date: 2013-11-20
License Status: Amended
Spud Date: 2014-01-04
Final Drill Date: 2014-01-19
Well Total Depth: 4755.00 m
Surface Hole Latitude: 55.767428
Surface Hole Longitude: -119.645962

For data sources see[1][2]

Well History

Date Event
2013-11-20 Obtained License
2014-01-04 Direction Drilling Operation Performed - Deviate
2014-01-05 Surface Casing Operation Performed
2014-01-11 Direction Drilling Operation Performed - Horizontal
2014-01-12 Well Log Performed
2014-01-13 Intermediate Casing Operation Performed
2014-01-13 Well Log Performed
2014-01-19 Finished Drilling
2014-01-19 Well Mode changed to Drilled and Cased
2014-01-20 Liner Casing Operation Performed
2014-01-21 Perforation Treatment Performed - Open-Hole Completion
2014-01-21 Rig Released
2014-05-02 Well Log Performed
2014-05-05 Perforation Treatment Performed - Multi-Stage Fracture
2014-05-06 Perforation Treatment Performed - Multi-Stage Fracture
2014-05-07 Perforation Treatment Performed - Multi-Stage Fracture
2014-07-30 Well Began Production
2014-07-30 Well Fluid changed to Crude Oil
2014-07-30 Well Mode changed to Flowing
2019-03-01 Well Fluid changed to Crude Oil
2019-03-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2014-01-04 Trinidad Drilling Ltd. 45 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2014-01-04 159.00 Deviate (5 - 79 degrees)
2014-01-11 2344.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2014-01-21 Open Hole/Barefoot Completion 4745.00 4755.00 0
2014-05-06 Multi-Stage Fracture 4060.70 4061.90 0
2014-05-06 Multi-Stage Fracture 3977.10 3978.30 0
2014-05-06 Multi-Stage Fracture 3905.30 3906.50 0
2014-05-06 Multi-Stage Fracture 3821.00 3822.30 0
2014-05-06 Multi-Stage Fracture 3738.00 3739.30 0
2014-05-06 Multi-Stage Fracture 3655.50 3656.70 0
2014-05-06 Multi-Stage Fracture 3586.70 3587.90 0
2014-05-07 Multi-Stage Fracture 3504.80 3506.00 0
2014-05-07 Multi-Stage Fracture 3423.10 3424.30 0
2014-05-07 Multi-Stage Fracture 3339.20 3340.40 0
2014-05-05 Multi-Stage Fracture 4690.70 4706.70 0
2014-05-07 Multi-Stage Fracture 3268.90 3270.10 0
2014-05-07 Multi-Stage Fracture 3185.90 3187.20 0
2014-05-07 Multi-Stage Fracture 3101.20 3102.40 0
2014-05-07 Multi-Stage Fracture 3018.90 3020.10 0
2014-05-07 Multi-Stage Fracture 2947.60 2948.80 0
2014-05-07 Multi-Stage Fracture 2864.10 2865.30 0
2014-05-07 Multi-Stage Fracture 2782.40 2783.70 0
2014-05-07 Multi-Stage Fracture 2700.50 2701.80 0
2014-05-07 Multi-Stage Fracture 2631.30 2632.50 0
2014-05-07 Multi-Stage Fracture 2549.60 2550.90 0
2014-05-05 Multi-Stage Fracture 4619.30 4620.60 0
2014-05-07 Multi-Stage Fracture 2470.70 2471.90 0
2014-05-05 Multi-Stage Fracture 4535.80 4537.00 0
2014-05-05 Multi-Stage Fracture 4465.80 4467.10 0
2014-05-05 Multi-Stage Fracture 4382.20 4383.40 0
2014-05-06 Multi-Stage Fracture 4297.80 4299.00 0
2014-05-06 Multi-Stage Fracture 4213.80 4215.00 0
2014-05-06 Multi-Stage Fracture 4144.80 4146.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-05-05 2014-05-07 2,191 13,260 N/A
2 2014-05-07 2014-05-07 2,191 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water 7732-18-5 100 79.9336 N/A
Sand 30/50 encana silica crystalline 14808-60-7 100 19.1849 N/A
ASPEN-FR-27 Aspen Polymers Friction Reducer Ethylene Glycol 107-21-1 100 0.0015 N/A
Non-Hazardous Not Available 100 0.0509 N/A
2 Sand 40/70 encana silica crystalline 14808-60-7 100 10.298 N/A
Sand 50/140 encana silica crystalline 14808-60-7 100 2.9638 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2014-05-04 2014-05-04 Surface Water - Runoff 11813

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2014 3416 0.0 0.0 0.0
2015 7088 0.0 0.0 0.0
2016 8312 0.0 0.0 0.0
2017 4976 0.0 0.0 0.0
2018 8209 0.0 0.0 0.0
2019 8637 0.0 0.0 0.0
2020 2049 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-01-21 No Incident Encountered 0.00 0.00
2014-05-07 No Incident Encountered 0.00 0.00
2017-07-03 No Incident Encountered 0.00 0.00

For data sources see[10]

References