If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0786111503000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":55.767428,"lon":-119.645962,"icon":""}]} |
Location: 00/03-15-078-11W6/0 | |
Location Alias: 00/03-15-78-11 W6M | |
Location Alias 2: 00/03-15-078-11 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 078 | |
Meridian: 6 | |
Range: 11 | |
Section: 15 | |
County/Municipality: Saddle Hills County | |
Well Name: BIR PCOUPES 3-15-78-11 | |
Operator Name: Birchcliff Energy Ltd. | |
License Number: 0461264 | |
License Date: 2013-11-20 | |
License Status: Amended | |
Spud Date: 2014-01-04 | |
Final Drill Date: 2014-01-19 | |
Well Total Depth: 4755.00 m | |
Surface Hole Latitude: 55.767428 | |
Surface Hole Longitude: -119.645962 |
Date | Event |
---|---|
2013-11-20 | Obtained License |
2014-01-04 | Direction Drilling Operation Performed - Deviate |
2014-01-05 | Surface Casing Operation Performed |
2014-01-11 | Direction Drilling Operation Performed - Horizontal |
2014-01-12 | Well Log Performed |
2014-01-13 | Intermediate Casing Operation Performed |
2014-01-13 | Well Log Performed |
2014-01-19 | Finished Drilling |
2014-01-19 | Well Mode changed to Drilled and Cased |
2014-01-20 | Liner Casing Operation Performed |
2014-01-21 | Perforation Treatment Performed - Open-Hole Completion |
2014-01-21 | Rig Released |
2014-05-02 | Well Log Performed |
2014-05-05 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-05-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-05-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-07-30 | Well Began Production |
2014-07-30 | Well Fluid changed to Crude Oil |
2014-07-30 | Well Mode changed to Flowing |
2019-03-01 | Well Fluid changed to Crude Oil |
2019-03-01 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-01-04 | Trinidad Drilling Ltd. | 45 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-01-04 | 159.00 | Deviate (5 - 79 degrees) |
2014-01-11 | 2344.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-01-21 | Open Hole/Barefoot Completion | 4745.00 | 4755.00 | 0 |
2014-05-06 | Multi-Stage Fracture | 4060.70 | 4061.90 | 0 |
2014-05-06 | Multi-Stage Fracture | 3977.10 | 3978.30 | 0 |
2014-05-06 | Multi-Stage Fracture | 3905.30 | 3906.50 | 0 |
2014-05-06 | Multi-Stage Fracture | 3821.00 | 3822.30 | 0 |
2014-05-06 | Multi-Stage Fracture | 3738.00 | 3739.30 | 0 |
2014-05-06 | Multi-Stage Fracture | 3655.50 | 3656.70 | 0 |
2014-05-06 | Multi-Stage Fracture | 3586.70 | 3587.90 | 0 |
2014-05-07 | Multi-Stage Fracture | 3504.80 | 3506.00 | 0 |
2014-05-07 | Multi-Stage Fracture | 3423.10 | 3424.30 | 0 |
2014-05-07 | Multi-Stage Fracture | 3339.20 | 3340.40 | 0 |
2014-05-05 | Multi-Stage Fracture | 4690.70 | 4706.70 | 0 |
2014-05-07 | Multi-Stage Fracture | 3268.90 | 3270.10 | 0 |
2014-05-07 | Multi-Stage Fracture | 3185.90 | 3187.20 | 0 |
2014-05-07 | Multi-Stage Fracture | 3101.20 | 3102.40 | 0 |
2014-05-07 | Multi-Stage Fracture | 3018.90 | 3020.10 | 0 |
2014-05-07 | Multi-Stage Fracture | 2947.60 | 2948.80 | 0 |
2014-05-07 | Multi-Stage Fracture | 2864.10 | 2865.30 | 0 |
2014-05-07 | Multi-Stage Fracture | 2782.40 | 2783.70 | 0 |
2014-05-07 | Multi-Stage Fracture | 2700.50 | 2701.80 | 0 |
2014-05-07 | Multi-Stage Fracture | 2631.30 | 2632.50 | 0 |
2014-05-07 | Multi-Stage Fracture | 2549.60 | 2550.90 | 0 |
2014-05-05 | Multi-Stage Fracture | 4619.30 | 4620.60 | 0 |
2014-05-07 | Multi-Stage Fracture | 2470.70 | 2471.90 | 0 |
2014-05-05 | Multi-Stage Fracture | 4535.80 | 4537.00 | 0 |
2014-05-05 | Multi-Stage Fracture | 4465.80 | 4467.10 | 0 |
2014-05-05 | Multi-Stage Fracture | 4382.20 | 4383.40 | 0 |
2014-05-06 | Multi-Stage Fracture | 4297.80 | 4299.00 | 0 |
2014-05-06 | Multi-Stage Fracture | 4213.80 | 4215.00 | 0 |
2014-05-06 | Multi-Stage Fracture | 4144.80 | 4146.00 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-05-05 | 2014-05-07 | 2,191 | 13,260 | N/A |
2 | 2014-05-07 | 2014-05-07 | 2,191 | 0 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | 7732-18-5 | 100 | 79.9336 | N/A | |||
Sand 30/50 | encana | silica crystalline | 14808-60-7 | 100 | 19.1849 | N/A | ||
ASPEN-FR-27 | Aspen Polymers | Friction Reducer | Ethylene Glycol | 107-21-1 | 100 | 0.0015 | N/A | |
Non-Hazardous | Not Available | 100 | 0.0509 | N/A | ||||
2 | Sand 40/70 | encana | silica crystalline | 14808-60-7 | 100 | 10.298 | N/A | |
Sand 50/140 | encana | silica crystalline | 14808-60-7 | 100 | 2.9638 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-05-04 | 2014-05-04 | Surface Water - Runoff | 11813 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 3416 | 0.0 | 0.0 | 0.0 |
2015 | 7088 | 0.0 | 0.0 | 0.0 |
2016 | 8312 | 0.0 | 0.0 | 0.0 |
2017 | 4976 | 0.0 | 0.0 | 0.0 |
2018 | 8209 | 0.0 | 0.0 | 0.0 |
2019 | 8637 | 0.0 | 0.0 | 0.0 |
2020 | 2049 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-01-21 | No Incident Encountered | 0.00 | 0.00 |
2014-05-07 | No Incident Encountered | 0.00 | 0.00 |
2017-07-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]